ITB_WRS260503_Installation_of_Centrifuge-Water_Reclamation_Facility_WRF_3_-_Exhibit_B_-_Price_Proposal.xlsx
XLSX spreadsheet 38 KB Posted
- Solicitation number
- ITB# WRS/260503
- Issued by
- Marion County, Orlando City, Florida
About this file
This is a price proposal exhibit for an Invitational Bid (ITB# WRS/260503) issued by the City of Ocala Water Resources Department for the installation of a centrifuge system at Water Reclamation Facility #3 in Ocala, Florida. The solicitation seeks a complete turnkey centrifuge installation including delivery, placement, support frame, centrifuge bowl, scroll conveyor, Yaskawa VFD-driven motor, bearings, seals, feed tube, polymer mixing system, discharge auger, control panel, instrumentation, and flowmeters. The system must achieve a minimum of 20% total solids cake output and include connections to existing drain systems, performance testing, staff training, and a one-year material and labor warranty. A mandatory pre-bid meeting is required on Thursday, March 19, 2026, at 9:00 AM at the WRF #3 facility, with attendance mandatory for bid eligibility. The bid submission deadline is April 7, 2026, with a maximum acceptable lead time of 26 weeks. Work hours are limited to 8:00 AM to 5:00 PM, Monday through Friday, excluding holidays.
The price proposal template is structured as a lump sum contract with sections for initial term pricing, annual pricing, renewal pricing, and optional term pricing, though specific pricing amounts are not populated in this exhibit. Vendors must demonstrate a minimum of ten years of documented experience designing and installing domestic wastewater centrifuges, provide evidence of at least three completed projects, and possess OSHA 10/30 or equivalent safety training. Award will be made to the lowest qualified bidder based on lump sum pricing. Vendors must perform a minimum of 80% of work with their own forces and are responsible for obtaining all required permits with costs included in the bid price. Required bonding includes a 5% bid bond, Performance and Payment Bond for the total bid amount, and a Maintenance and Guarantee Bond for three years. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate and Commercial Automotive Liability of $1,000,000 combined limits. The solicitation documents do not disclose an estimated budget or specify any set-aside designations or incumbent vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit B - PRICE PROPOSAL | CONTRACT# WRS/260503 | ||
| WRF #3 Centrifuge | |||
| Bidder name | Bidder Location | ||
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| INITIAL TERM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | Installation of a complete centrifuge system at WRF #3, including delivery and placement on the ground floor; provision of support frame, centrifuge bowl, scroll conveyor, Yaskawa VFD-driven main motor, bearings, seals, feed tube, polymer mixing system, discharge auger, control panel, instrumentation, and flowmeters; connection of centrate discharge to existing drain system; system performance testing to verify a minimum of 20% total cake solids; and supply of a centrifuge designed for long, continuous service using high‑quality, service‑appropriate materials. This lump sum price will include all necessary training for City staff, a one year materal and labor warranty from the date of completion, and all travel related cost incurred to the vendor for this project. | LS | 1 | $ - 0 | |
| ANNUAL PRICING | $ - 0 | ||||
| RENEWAL PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | $ - 0 | ||||
| TOTAL CONTRACT TERM PRICING | $ - 0 |
| OPTIONAL TERM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | $ - 0 | ||||
| TOTAL CONTRACT TERM PRICING | $ - 0 |
TOTAL BID (Grand total of all line items excluding optional item pricing) $ - 0 image1.png
File details come from the government source that posted it. Updated .