ITB_WRS260503_Installation_of_Centrifuge-Water_Reclamation_Facility_WRF_3_-_Exhibit_B_-_Price_Proposal.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Installation of Centrifuge-Water Reclamation Facility (WRF) #3
Solicitation number
ITB# WRS/260503
Issued by
Marion County, Orlando City, Florida

About this file

This is a Price Proposal Exhibit B form for an Invitational Bid (ITB# WRS/260503) issued by the City of Ocala Water Resources Department in Florida for the installation of a centrifuge system at Water Reclamation Facility #3 (WRF #3). The project involves a complete turnkey installation of a centrifuge system designed to improve biosolids dewatering from the current 14% total solids to a minimum of 20% total solids. The scope includes delivery, placement, provision of support frame, centrifuge bowl, scroll conveyor, Yaskawa VFD-driven main motor, bearings, seals, feed tube, polymer mixing system, discharge auger, control panel, instrumentation, flowmeters, connection to existing drain systems, system performance testing, and staff training. A mandatory pre-bid meeting is scheduled for Thursday, March 19, 2026, at 9:00 AM at the WRF #3 facility located at 3100 SW 67th Avenue Road, Ocala, Florida 34474, with attendance mandatory for bid eligibility. Bids are due April 7, 2026, with a maximum acceptable lead time of 26 weeks and work hours limited to 8:00 AM to 5:00 PM, Monday through Friday, excluding holidays.

The price proposal template requests bidders to enter a lump sum price for the initial term installation, with separate line items for annual pricing and optional renewal term pricing, though all pricing fields are currently blank. Acceptable equipment includes Centrisys CS Series, Alfa Laval Aldec G3 range, Hiller DecaPress DP series, or equivalents. Award will be made to the lowest qualified bidder based on lump sum pricing. Vendors must have a minimum of ten years of documented experience designing and installing domestic wastewater centrifuges, evidence of at least three completed centrifuge projects, OSHA 10/30 or equivalent safety training, and must perform a minimum of 80% of work with their own forces. The vendor must provide a 5% bid bond, Performance and Payment Bond for the total bid amount, and Maintenance and Guarantee Bond for three years. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate and Commercial Automotive Liability of $1,000,000 combined limits. The lump sum price includes all necessary training, a one-year material and labor warranty from completion, all travel-related costs, and the vendor is responsible for obtaining all required permits with permit fees included in the bid price. No estimated budget range or award value is disclosed in the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Exhibit B - PRICE PROPOSALCONTRACT# WRS/260503
WRF #3 Centrifuge
Bidder nameBidder Location
ENTER COMPANY NAME HEREENTER OFFICE LOCATION HERE
INITIAL TERM PRICING
ITEMDESCRIPTIONUOMQTYUNIT COSTEXTENDED COST
1Installation of a complete centrifuge system at WRF #3, including delivery and placement on the ground floor; provision of support frame, centrifuge bowl, scroll conveyor, Yaskawa VFD-driven main motor, bearings, seals, feed tube, polymer mixing system, discharge auger, control panel, instrumentation, and flowmeters; connection of centrate discharge to existing drain system; system performance testing to verify a minimum of 20% total cake solids; and supply of a centrifuge designed for long, continuous service using high‑quality, service‑appropriate materials. This lump sum price will include all necessary training for City staff, a one year materal and labor warranty from the date of completion, and all travel related cost incurred to the vendor for this project.LS1$ - 0
ANNUAL PRICING$ - 0
RENEWAL PRICING
ITEMDESCRIPTIONUOMQTYUNIT COSTEXTENDED COST
1$ - 0
TOTAL CONTRACT TERM PRICING$ - 0
OPTIONAL TERM PRICING
ITEMDESCRIPTIONUOMQTYUNIT COSTEXTENDED COST
1$ - 0
TOTAL CONTRACT TERM PRICING$ - 0

TOTAL BID (Grand total of all line items excluding optional item pricing) $ - 0 image1.png

File details come from the government source that posted it. Updated .