ITB_OFN250008_Underground_Conduit_Installation_-_Exhibit_B_-_Price_Proposal.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Underground Conduit Installation
Solicitation number
ITB# OFN/250008
Issued by
Marion County, Orlando City, Florida

About this file

This document is a Price Proposal (Exhibit B) for ITB# OFN/250008, issued by the City of Ocala, Florida for an Underground Conduit Installation contract. The solicitation covers comprehensive conduit installation services, including trenching, hand digging, plowing, backhoe, missile-stitch bore, and directional boring techniques for 1.25", 2", and 3" conduit. The contract includes installation of various infrastructure components such as stub-ups, u-guards, fiber pedestals, flush vaults, fiber pulling, service drops, and related site restoration work. The estimated quantities range from 20 to 150,000 linear feet/units across different installation methods and equipment types, with a total of 42 distinct line items for pricing.

The price proposal template requires bidders to complete unit costs for each line item, which will then calculate the extended cost and total bid amount. While no specific pricing is filled in, the document provides a comprehensive framework for contractors to propose rates for underground conduit installation services. The contract appears designed to provide flexible infrastructure installation capabilities with multiple method options, allowing the City of Ocala to utilize the most appropriate technique for each specific project location and condition. The broad scope suggests the intent is to establish a comprehensive, multi-year contract for ongoing underground utility infrastructure development and maintenance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Exhibit B - PRICE PROPOSAL CONTRACT# OFN/250008

Bidder nameBidder Location
ENTER COMPANY NAME HEREENTER OFFICE LOCATION HERE
INITIAL CONTRACT TERM PRICING
ITEMDESCRIPTIONUOMEST QTYUNIT COSTEXTENDED COST
11.25" conduit - TrenchingLF10,000$ - 0
21.25" conduit - Hand digLF500$ - 0
31.25" conduit - PlowedLF50,000$ - 0
41.25" conduit - BackhoeLF500$ - 0
51.25" conduit - Missile-Stitch BoreLF150,000$ - 0
61.25" conduit - DirectionalLF10000$ - 0
72" conduit - TrenchingLF1,000$ - 0
82" conduit - Hand digLF500$ - 0
92" conduit - PlowedLF5,000$ - 0
102" conduit - BackhoeLF500$ - 0
112" conduit - Missile-Stitch BoreLF1,000$ - 0
122" conduit - DirectionalLF500$ - 0
133" conduit - TrenchingLF500$ - 0
143" conduit - Hand digLF500$ - 0
153" conduit - PlowedLF500$ - 0
163" conduit - BackhoeLF500$ - 0
173" conduit - Missile-Stitch BoreLF500$ - 0
183" conduit - DirectionalLF500$ - 0
191.25" Stub-upEA100$ - 0
202" Stub-upEA100$ - 0
213” Stub-upEA100$ - 0
22Install U-Guard at PoleEA500$ - 0
23Fiber Pedestal placementEA500$ - 0
2412X20 Flush Vault placementEA1500$ - 0
2517X30 Flush Vault placementEA250$ - 0
2624X36 Flush Vault placementEA100$ - 0
27Fiber Pedestal replacementEA50$ - 0
2812x20 Flush Vault replacementEA50$ - 0
2917x30 Flush Vault replacementEA50$ - 0
3024x36 Flush Vault replacementEA20$ - 0
31Pulling fiber in conduitLF200,000$ - 0
32Pulling additional fibers in conduit simultaneouslyLF50,000$ - 0
33Pulling tracer in conduitLF150,000$ - 0
34SodSF500$ - 0
35Asphalt remove/replacement (1” Thick)SF500$ - 0
36Cement remove/replacement (4” Thick)SF500$ - 0
37Miscellaneous installation of equipment (pole or pad mount)HR100$ - 0
38Labor Cost to Dig up/Search for ConduitHR1,000$ - 0
39Wall Fish fiber to Point of ServiceEA1,600$ - 0
40Install service drop up to 125'EA500$ - 0
41Install service drop over 125'LF500$ - 0
42Emergency MobilizationHR500$ - 0
TOTAL BID AMOUNT$ - 0