ITB DOA 26 27 40_Final.pdf

PDF 695 KB Posted

Attached to
Conner Lab Corridor Structural Improvement - FDACS Project No. 1116
Solicitation number
ITB-16927
Issued by
Leon County, Florida

About this file

This Invitation to Bid (ITB) document from the Florida Department of Agriculture and Consumer Services (FDACS) solicits competitive bids for repairs and improvements within the Connor Complex Laboratory Corridor in Tallahassee, Florida. The project scope includes structural improvements and glazing replacements as specified in the construction documents. The ITB was released on September 11, 2026, with a recommended non-mandatory pre-bid site visit scheduled for September 22, 2026, at 10:00 a.m. Eastern Time at the Conner Administration Building. Bidders must submit written questions by September 29, 2026, at 5:00 p.m., with responses posted by October 2, 2026. Sealed bids are due October 21, 2026, at 5:00 p.m. at the Mayo Building in Tallahassee, and the public bid opening will occur October 22, 2026, at 9:30 a.m. via teleconference or in person. The construction contract period is 180 calendar days total, consisting of 150 calendar days to substantial completion and 30 calendar days for project close-out, commencing from the Notice to Proceed. The base bid includes all work as specified in the 100% Construction Documents, excluding three optional additive alternates: Alternate No. 1 for replacement of 61 insulated storefront glazing units, Alternate No. 2 for concrete bench and rail repairs with sealant, and Alternate No. 3 for replacement of up to 144 additional insulated single storefront glazing units at per-unit pricing.

Award will be made to the responsive and responsible bidder submitting the lowest total price for the base bid or base bid with selected additive alternates, at the Department's discretion. A bid bond guarantee equal to five percent of the bid price is required for proposals of $100,000 or greater, with performance bonds at 100 percent of the contract amount due prior to contract execution. All bidders must hold an active General Contractor or Certified General Contractor's license per Florida Chapter 489, Part I, and must provide proof of at least three similar projects completed within the last five years as references. The contractor is responsible for obtaining all required permits and paying all associated fees, with all costs included in the bid price. A one-year written warranty covering parts and labor is required within ten days of substantial completion. Liquidated damages are assessed at $250 per calendar day for delays beyond the completion date. Bidders must register in the MyFloridaMarketplace system and submit required certifications including those regarding scrutinized companies, lobbying and debarment status, and drug-free workplace programs. The Department reserves the right to reject any and all bids or waive minor irregularities as determined to be in the best interest of the State.

View the file

Other files

File Type Posted
Addendum 1 - Q&A.pdf PDF
Appendix II - Agreement.pdf PDF
Appendix I - 100% Construction Documents.pdf PDF
Addendum 2 - Revision to Q&A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES

Invitation to Bid (ITB) No. ITB DOA 26 27 40

Solicitation Title: Conner Lab Corridor Structural Improvement

FDACS Project No. 1116

Brenda Paul , Procurement Officer

407 S. Calhoun Street, SB-8 Mayo Building

Tallahassee, FL 32399-0800

ConstructionBids@FDACS.gov

Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Protests must be filed with the Agency Clerk, Florida Department of Agriculture and Consumer Services, The Holland Building, 600 South Calhoun

Street, Tallahassee, Florida 32399.

mailto:ConstructionBids@FDACS.gov

BID NUMBER: ITB DOA 26 27 40

SECTION 1.0 INTRODUCTORY SECTION

1.1. STATEMENT OF PURPOSE

The Florida Department of Agriculture and Consumer Services (FDACS or Department) seeks to obtain competitive bids for repairs and improvements within the Connor Complex, Laboratory Corridor, located in Tallahassee, Florida, inaccordance with the the technical specifications set forth herein. This Invitation to Bid (ITB) and all activities leading toward the anticipated issuance of a Construction Project Agreement between Owner and Contractor are conducted pursuant and subject to Chapter 255, Florida Statutes (F.S.), and Rule Chapter 60D-5, Florida Administrative Code (F.A.C.).

This solicitation will be administered through the Vendor Information Portal (VIP) at https://vendor.myfloridamarketplace.com/search/bids. Bidders interested in submitting a response must comply with all terms and conditions described in this solicitation.

It is the intent of the Department to make a single award, or to make no award, as determined to be in the best interest of the State.

1.2. TIMELINE

The table below contains the timeline of events for this solicitation. The dates and times within the Timeline are subject to change. Modifications by the Department will be issued by written addenda. It is the responsibility of the Bidder to check for any changes on the VIP. All required actions must be completed by the date and time indicated on the Timeline. All times listed are Eastern Time (ET).

EVENT DATE/TIME LOCATION

Release of ITB September 11, 2026 Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids

Recommended Pre-Bid Site Visit

September 22, 2026

10:00AM

Conner Administration Building 3125 Conner Blvd.

Tallahassee, Florida 32399

Last day for Bidders to Submit Questions

September 29, 2026

5:00PM

Florida Department of Agriculture and Consumer Services

Email: ConstructionBids@FDCAS.gov Anticipated Posting of Written Responses to

Bidders Questions October 2, 2026 Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids

Sealed Bids Due October 21, 2026

5:00PM

Florida Department of Agriculture and Consumer Services – Mayo Building

407 S. Calhoun Street, SB-8 Tallahassee, Florida 32399-0800

Public Bid Opening October 22, 2026

9:30AM

Teleconference Number: (877) 273-4202 Conference Room Number: 585 608 901

OR

Mayo Building

407 S. Calhoun Street, SB-8 Tallahassee, Florida 32399-0800

Anticipated Posting of Recommended Award

TBD Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fvendor.myfloridamarketplace.com%2Fsearch%2Fbids&data=05%7C02%7CStephanie.Bergozza%40fdacs.gov%7C4f2dd97316664dbe96c608dd96e32378%7C62557d98bd114a888a7b57bc3df0190b%7C0%7C0%7C638832624470069313%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=hwfp6TpS973080G7he7dIma8cxcidOSanzY%2F%2BpFbdqY%3D&reserved=0 https://vendor.myfloridamarketplace.com/search/bids mailto:ConstructionBids@FDCAS.gov https://vendor.myfloridamarketplace.com/search/bids

1.3. PROCUREMENT OFFICER

The Procurement Officer, acting on behalf of the FDACS, is the sole point of contact for official meetings, questions, and all procurement related matters relating to this solicitation.

The Procurement Officer for this ITB is:

Brenda Paul, Procurement Officer Email: ConstructionBids@FDACS.gov

Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.

1.4. MANDATORY REQUIREMENTS

The FDACS has established certain requirements with respect to bids to be submitted by Bidders. The use of “shall”, “must”, or “will” (except to indicate simple futurity) in this ITB indicates a requirement or conditions from which a material deviation may not be waived by the Department. A deviation is material if, in the Department’s sole discretion, the deficient response does not substantially accord with the ITB requirements, provides an advantage to one Bidder over other Bidders, has potentially significant effect on the quantity or quality of items bid, or on the cost of the Department. Material deviations cannot be waived. The words “should” or “may” in this ITB indicate desirable attributes or conditions but are permissive in nature. Deviation from, or omission of, such a desirable feature, will not in itself cause rejection of a Bid.

1.5. CONFLICTS AND ORDER(S) OF PRECEDENCE

All bids are subject to the terms of the following provisions of this ITB, which are hereby incorporated by reference, and in case of conflict shall have the following order of precedence:

1) Construction Contract,

2) Addenda, in reverse order of issuance, and

3) ITB, including attachments and appendices.

1.6. NON-MANDATORY PRE-BID CONFERENCE / RECOMMENDED SITE VISIT

Bidders are strongly encouraged to inspect the project site prior to submitting a bid. A site visit allows each prospective bidder to evaluate all general and local conditions that may affect the preparation of their bid and cost of performance. A non-mandatory pre bid conference for any prospective bidder will be held at:

Location: Conner Administration Building, 3125 Conner Blvd., Tallahassee, Florida 32399 Date: Tuesday, September 22, 2026 Time: 10:00 a.m., Eastern Time

A site visit is strongly recommended; however, it is not a mandatory requirement for submitting mailto:ConstructionBids@FDACS.gov a bid. Bidders who choose not to visit the site remain fully responsible for understanding all project conditions and requirements

SECTION 2.0 TECHNICAL SPECIFICATIONS

2.1. SPECIFICATIONS

This ITB requests competitive bids for repairs and improvements within the Connor Complex, Laboratory Corridor. The awarded bidder (Contractor) shall be required to complete all work in accordance with the requirements outlined in this ITB, the APPENDIX I – 100% CONSTRUCTION DOCUMENTS, and the APPENDIX II – AGREEMENT BETWEEN THE

OWNER AND CONTRACTOR.

2.2. BASE BID

The Contractor awarded the bid (“Contractor or Awarded Contractor”) shall furnish and perform all construction activities to include but not be limited to, labor, materials, equipment, tools, transportation, supplies, and supervision required to complete this project in accordance with the Appendix I – 100 % Construction Documents, excluding Alternates No. 1, No. 2, and No. 3.

The Contractor’s Base Bid price shall not include construction activities related to the Additive Alternate No. 1, Alternate No. 2, or Alternate No. 3 options listed below.

All work shall be in accordance with Florida building code and manufacturer’s instructions. The Contractor shall obtain all necessary permits as stated in Section 2.5, Permits, including any other drawings, design, or engineering which may be needed for those permits, for a complete project. The Contractor shall provide all written, fully executed warranties and close-out documentation at project completion.

2.2.1. ALTERNATE # 1

APPENDIX I, Part I, Section 1.03 Schedule of Alternates (B):

Replace all 61 insulated storefront glazing units.

2.2.2. ALTERNATE # 2

APPENDIX I, Part I, Section 1.03 Schedule of Alternates EXPERIENCE:

Repair cracks and adding concrete sealant to the concrete benches and rails at the exterior porch areas.

2.2.3. ALTERNATE # 3

APPENDIX I, Part I, Section 1.03 Schedule of Alternates (D):

Replace up to an additional 144 insulated single storefront glazing units as specified by the Department. The Department may reduce the per single unit quantity of Alternate Bid 3 based on available budget.

2.3. PACKAGE FOR BIDDERS

Refer to APPENDIX I – 100% CONSTRUCTION DOCUMENTS.

2.4. LICENSING

Bidder must submit with their bid response proof of possessing, at a minimum, an active General Contractor or Certified General Contractor’s license pursuant to Chapter 489, Part I, F.S., or any other law, rule, or regulation, applicable to this type of work. Failure to provide the required proof of qualification may result in bid rejection as outlined in Section 4.18, Bid Evaluation.

2.5. PERMITS

The Contractor is responsible for obtaining and paying for all permitting required, including any other drawings, design, or engineering which may be needed for those permits, to fully complete this project. The Contractor shall coordinate all utility taps and shall pay all associated fees, impact charges, etc. Upon completion of the work, the Contractor shall deliver to the engineer a certificate of inspection and approval from the local inspection authority, if required. All fees shall be included in the bid price.

2.6. CONTRACT / CONSTRUCTION PERIOD

Whenever the word “day” is used in the contract documents, it shall mean a calendar day, unless otherwise specifically provided. The date of commencement of the work is the date established in a written Notice to Proceed. The Department shall furnish a Notice to Proceed along with the executed contract.

Construction shall be substantially complete within 180 calendar days after issuance of the Notice to Proceed. The contract period shall be a total of 180 calendar days, which shall consist of 150 calendar days to substantial completion of work after issuance of the Notice to Proceed and 30 calendar days beyond substantial completion to complete the project close-out process. The time for completion of the work includes, without limitation, obtaining any required permits not obtained by the Department, and other governmental and quasi-governmental approvals, acquiring bonds and interim and final inspections. TIME IS OF THE ESSENCE WITH

RESPECT TO THE TIME OF COMPLETION OF THE WORK.

2.7. CONTRACT / PROJECT MANAGER

The Contractor will coordinate and schedule all work with the Department’s Contract Manager, Debbie Bass, 850-617-7076.

2.8. CONTRACTOR WARRANTY AND GUARANTEE

The Contractor shall furnish to the Department a one (1) year written warranty and guarantee per specifications, which includes all parts and labor. The guarantee shall be provided within ten (10) days from substantial completion of the project. The one (1) year period will start upon substantial completion of the project as determined by the Department.

2.9. PRODUCTS FOR APPLICATION AND INSTALLATION

The Contractor shall not change the approved products at any time during the performance of the awarded contract, without prior written approval from the Department’s Contract Manager and architect/engineer firm. Liquidated damages in the “per day” amount set forth in Section 5 hereof shall begin upon the Department’s Notice of use of improper products and continue until the Contractor remediates and substitutes the improper product with an authorized product, all at the expense of the Contractor. If an unapproved substitution is submitted with a bid, the subject Bidder will be deemed nonresponsive and subsequently disqualified. The Department and Architect/Engineer reserve the right to reject any substitution requests.

SECTION 3.0 BIDDER QUALIFICATIONS

3.1. PERFORMANCE QUALIFICATIONS

The Department reserves the right to investigate or inspect at any time whether the product, qualifications, or facilities offered by the Contractor meet the Contract requirements. The Contractor shall at all times during the Contract term remain responsive and responsible. In determining the Contractor ’s responsibility as a bidder, the agency shall consider all information or evidence which is gathered or comes to the attention of the agency that demonstrates the Contractor ’s capability to fully satisfy the requirements of the solicitation and the contract.

The Contractor must be prepared, if requested by the Department, to present evidence of experience, ability, and financial standing, as well as a statement as to plant, machinery, and capacity of the Contractor for the production, distribution, and servicing of the product bid. If the Department determines that the conditions of the solicitation documents are not complied with, or that the product proposed to be furnished does not meet the specified requirements, or that the qualifications, financial standing, or facilities are not satisfactory, or that performance is untimely, the Department may reject the response or terminate the Contract. Contractor may be disqualified from receiving awards if the Contractor, or anyone in the Contractor’s employment, has previously failed to perform satisfactorily in connection with public bidding or contracts. This paragraph shall not mean or imply that it is obligatory upon the Department to make an investigation either before or after award of the Contract, but should the Department elect to do so, the Contractor is not relieved from fulfilling all Contract requirements.

3.2. CLARIFICATIONS / REVISIONS

Before award, the Department reserves the right to seek clarifications or request any information deemed necessary for proper evaluation of submissions from all Bidders deemed eligible for Contract award. Failure to provide requested information may result in rejection of the response.

3.3. CONFLICT OF INTEREST

This solicitation is subject to Chapter 112, F.S. Contractors shall disclose with their response the name of any officer, director, employee, or other agent who is also an employee of the State.

Contractors shall also disclose the name of any State employee who owns, directly or indirectly, an interest of five percent (5%) or more in the firm or its affiliates.

SECTION 4.0 INVITATION TO BID PROCESS

4.1. ADVERTISEMENT

This ITB is hereby advertised on the State of Florida VIP. To find the ITB or other related information, enter Agency “Department of Agriculture” and click on “Advertisement Search” at the bottom of the web page. If unable to download the document(s), contact the FDACS Procurement Officer listed in Section 1.3.

4.2. SPECIAL ACCOMMODATIONS

Any person with a disability requiring special accommodations at the site visit or the bid opening shall contact the Procurement Officer listed in Section 1.3, Procurement Officer, at least five (5) working days prior to the event. If you are hearing or speech impaired, please contact this office by using the Florida Relay Services which can be reached by dialing 7-1-1 or visit https://www.ftri.org/relay for assistance.

4.3. BIDDER QUESTIONS

The Procurement Officer, acting on behalf of the FDACS, is the sole point of contact for official meetings, questions, and all procurement related matters relating to this solicitation from the date of the release of the solicitation until the FDACS Notice of Agency Decision is posted on the VIP.

Questions related to this ITB, or requests for approved equivalents (if applicable), must be received in writing, via email, by the Procurement Officer listed in Section 1.3, Procurement Officer, within the time indicated in Section 1.2, Timeline. Verbal Questions, or those submitted after the period specified in the Timeline, will not be acknowledged.

Responses to written questions will be published on the VIP on or about the date referenced in the Timeline.

4.4. ADDENDA

If the Department deems it necessary to supplement, modify, or interpret any portion of the solicitation documents or exhibits, addenda, and materials relative to this procurement during the bidding period, information will be posted on the VIP as a written addendum. Any addenda issued in relation to this solicitation shall thereby become part of the final bid specifications and requirements.

Interested parties are responsible for monitoring this site for new, changing, or clarifying information relative to this solicitation.

4.5. MYFLORIDAMARKETPLACE (MFMP) REGISTRATION

Each bidder desiring to sell commodities or contractual services as defined in Section 287.012, F.S., to the State is prequalified to do so and shall register in the MFMP system, unless exempted. Information about the registration process is available, and registration may be completed on the MFMP VIP website at https://vendor.myfloridamarketplace.com/. Interested persons lacking internet access may request assistance from the MFMP Customer Service at

(866) 352-3776.

Bidders should register for the following United Nations Standard Products and Services (UNSPSC) Class/Group Commodity Code(s) pertaining to this Procurement:

• 72121000 – New Industrial and Warehouse Construction Services

• 72121100 – Commercial and Office Building Services

• 72121500 – Industrial Plan Construction Services https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ftri.org%2Frelay&data=05%7C02%7CBrenda.Paul%40fdacs.gov%7C82cf2663a377494231bb08deb4f30c88%7C62557d98bd114a888a7b57bc3df0190b%7C0%7C0%7C639147153143003524%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=xadpq3i9aOFkF%2B444f%2FxT6OUO0nZrz1EXpbEO%2FGwN9Q%3D&reserved=0 https://vendor.myfloridamarketplace.com/

4.6. BIDDER SUBSTITUTE W-9

The Florida Department of Financial Services (DFS) requires all Bidders that conduct business with the state to electronically submit a Substitute W-9 Form to https://flvendor.myfloridacfo.com. Forms and answers to frequently asked questions are located on that website once a registration has been completed. DFS may assist Bidders with questions and be reached by contacting (850) 413-5519 or FLW9@myfloridacfo.com.

The awarded Contractor must have a valid W-9 on file with the DFS prior to issuance of a purchase order or contract. This may be completed by the Bidder post-award and is not something which FDACS will consider in determining the responsiveness of a bid.

4.7. COST OF BID PREPARATION

Neither the Department, nor the state of Florida, is liable for any costs incurred by a Bidder in response to this ITB.

4.8. INSTRUCTIONS FOR BID SUBMITTAL

Each bid response shall be prepared simply and economically, providing a straightforward, concise delineation of the Bidder’s capabilities to satisfy the requirements of this ITB. Elaborate bindings, colored displays and promotional material are discouraged. Emphasis in each bid must be on completeness and clarity of content. In order to expedite the review of bids, it is essential that Bidders follow the format and instructions.

1) Bids may be sent by U.S. mail, courier, overnight or hand delivered to:

Florida Department of Agriculture and Consumer Services 407 S. Calhoun Street, SB-8 Mayo Building Tallahassee, Florida 32399-0800

2) Electronic (email/fax) submission of bids will NOT be accepted for the ITB.

3) All bids must be submitted in a sealed envelope/package with the relevant ITB number clearly marked on the outside of the envelope/package.

4) It is the bidder’s responsibility to assure its bid submittal is delivered to the proper place and time as stipulated in Section 1.2, Timeline.

5) Late bids will not be accepted.

Bids may be delivered by United States Postal Service (USPS) mail, courier (FedEx/UPS), or hand delivered to the Mayo Building; however, Bidders are cautioned shipment via USPS may not be guaranteed to be received by the Department on the scheduled due date / time.

BIDS MUST BE RECEIVED IN THE PURCHASING OFFICE BY THE DESIGNATED DATE

AND TIME LISTED THAT SEALED BIDS ARE DUE IN SECTION 1.2, TIMELINE.

POSTMARKED OR CLOCKED IN BY FEDEX, UPS, OR U.S. POSTAL SERVICE IS NOT

ACCEPTABLE EVIDENCE FOR BEING RECEIVED IN THE PURCHASING OFFICE.

https://flvendor.myfloridacfo.com/ mailto:FLW9@myfloridacfo.com

4.9. BIDDER ACKNOWLEDGEMENT

By submission of a signature on the Department’s Acknowledgment Form, the Bidder certifies that they comply with all terms and conditions contained herein. The Bid must contain the original signature of an authorized representative who can legally bind the Bidder. The product offered by the Bidder must conform to the specifications of this ITB without exception. Bidders must include ATTACHMENT B – FDACS ACKNOWLEDGEMENT FORM with their Bid response.

4.10. BID PRICE SHEET

The Bidder shall complete, sign, and return ATTACHMENT C – BID PRICE SHEET.

Bidder shall provide a Total Price for all Technical Sepcifcations listed within Section 2 for the Base Bid, Additive Alternate No. 1 and Additive Alternative No. 2 on the ATTACHMENT C

– BID PRICE SHEET.

Bidder shall provide a per unit cost for each additional single storefront glazing unit listed within the Additiative Alternate No. 3.

Base Bid each Additive Alternate Bid pricing shall include all construction activities, materials, equipment, permits, all necessary labor, transportation, and any other costs associated with this project. The Department will not accept any costs for travel or other costs not included in the bid price.

4.11. PAST REFERENCES/PAST PERFORMANCE

The Bidder shall complete and return ATTACHMENT D – REFERENCES.

The Contractor shall provide a list of current contact information for no less than three (3) of its most recently completed projects from the last five (5) years that are similar in project size and scope as the work proposed in this ITB. It is the responsibility of the Bidder to ensure that all submitted references are verified. The Department will attempt to verify references once via telephone or email. If the reference does not return the Department’s phone call or email within 72 hours (exclusive of weekends and state holidays) of the time of the Department’s phone call or email, the reference will be deemed unverified. Bids with one or more unverified references may be disqualified. References that indicate any unsatisfactory Contractor work performance or workmanship may result in the Bidder being deemed not responsible as outlined in Section 4.27, Rejection of Bid. References must be current or former clients of the responding Bidder. The Department will not accept subcontractor / proposed personnel or personal references of a member of the responding Bidder as a substitute for Bidders’ references (See ATTACHMENT D – REFERENCES). Past performance with the Department will constitute a reference, whether listed or not, and will be used by the Department to determine the Bidder’s ability to perform services similar to those described in this bid in a satisfactory manner. Unsatisfactory past performance with the Department may result in rejection of that Bidder’s response / bid submission.

The Department reserves the right to contact each customer reference to verify the information provided and validate the performance / workmanship of the Bidder.

4.12. LISTING OF SUBCONTRACTORS

The Bidder shall complete, sign, date, and return ATTACHMENT E – LIST OF

SUBCONTRACTORS.

In order that the Department may be assured that only qualified and competent subcontractors will be employed on the project, the Contractor shall submit to the Department a list of subcontractors who will perform work. The Contractor shall have determined, to his own complete satisfaction, that a listed subcontractor has been successfully engaged in this particular type of business for a reasonable length of time, has successfully completed installations or renovations comparable to that which is required by these specifications and is qualified both technically and financially to perform the phase of this work for which he is listed.

Proof of all licenses or certifications required of subcontractors should be submitted with the list of subcontractors by the Contractor. Any subcontractor(s) not listed and approved in the award of this bid will not be allowed to proceed with any work related to this project. Any subcontractor(s) proposed after the start of this project must be submitted in writing to the Department for approval. Work by the proposed subcontractor must not commence until the Department has given approval. ATTACHMENT E – LIST OF SUBCONTRACTORS must be completed and included in the Bid response.

4.13. BID BOND GUARANTEE

If the price (base bid including any alternatives) is $100,000 or greater, the bid response shall be accompanied by a bid bond guarantee payable to the Department in the amount of five percent (5%) of the price. The form of the bid bond guarantee can be written by a surety company authorized to do business in the state of Florida and signed by a Florida licensed agent. Bid bond guarantees of unsuccessful Contractors shall be returned following completion of the award posting period. The successful Contractor’s bid bond guarantee shall be returned when the required performance bond is provided to the Department. If the successful Contractor fails to provide the required performance bond as specified, the bid bond guarantee shall be forfeited to the Department.

4.14. BOND REQUIREMENTS

If the contract amount resulting from this Invitation to Bid (ITB) is greater than $100,000, the Contractor shall furnish the Department with a performance bond in the amount of one hundred percent (100%) of the quoted price. The Contractor shall submit this bond to the Department in the form shown at the bottom of this section and Contractor will ensure no deviations from this form are made. The bond must be written by a surety company authorized to do business in the state of Florida and signed by a Florida licensed agent. The bond shall be furnished to the Department prior to final execution of the construction contract. The construction contract shall not be finalized by the Department until the performance bond is in place and approved by the Department’s Contract Manager and purchasing office in writing.

The cost of the performance bond shall be borne by the Contractor.The bond shall be accompanied by a duly authenticated or certified document, in duplicate, evidencing that the person executing the bond on behalf of the surety company is a licensed Florida agent for the bonding company. In the usual case, the conferring of that authority has occurred prior to the date of the bond and the document showing the date of appointment and enumeration of powers of the person executing the bond is accompanied by a certification that the appointment and powers have not been revoked and remain in effect. The date of that certification shall be dated the same as the bond. In the event that the contract amount is increased as a result of a written change order executed by the Department, then the Contractor agrees to increase the amount of the performance bond at Contractor’s sole expense by the amount of such increase reflected in the change order. Failure to comply with all provisions of this agreement can result in a forfeiture of this performance bond. Failure to furnish the required performance bond, or to execute the construction contract associated with this ITB in a timely manner, shall result in the forfeiture of the bid bond guarantee to the Department.

PUBLIC CONSTRUCTION BOND

Bond No. (enter bond number)

BY THIS BOND, We _________, as Principal and _________, a corporation, as Surety, are bound to the Florida Department of Agriculture and Consumer Services, herein called Owner, in the sum of

$_________, for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally.

THE CONDITION OF THIS BOND is that if Principal:

1. Performs the contract dated _____, _____, between Principal and Owner for construction of _________, the contract being made a part of this bond by reference, at the times and in the manner prescribed in the contract; and

2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract; and

3. Pays Owner all losses, damages, expenses, costs, and attorney’s fees, including appellate proceedings, that Owner sustains because of a default by Principal under the contract; and

4. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force.

Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes.

Any changes in the contract documents and compliance or noncompliance with any formalities under the contract connected with the changes does not affect Surety’s obligation under this bond.

DATED ON _____, _____.

(Name of Principal)

By (As Attorney in Fact)

(Name of Surety)

4.15. PUBLIC RECORDS

All documents submitted in response to this ITB shall be considered public record pursuant to Chapter 119, F.S.

4.16. DISCLOSURE OF BID SUBMITTAL CONTENTS

All documentation produced as part of this solicitation shall become the exclusive property of the Department and may not be removed by the Bidder or its agents or returned. The Department shall have the right to use any or all ideas, or adaptations of the ideas, presented in any bid. Selection or rejection of a bid shall not affect this right.

4.17. BID OPENING

Bids are due, and will be publicly opened, at the time, date, and location specified in Section 1.2, Timeline. Bid responses received late (after bids are due) will not be accepted, nor considered, and modification by the Bidder of submitted bids will not be allowed, unless the Department has made a request for additional information. Department staff will not be held responsible for the inadvertent opening of a bid response if it is not properly sealed, addressed, or identified.

The bid opening will be available via teleconference or in person. Attendance is not required for submission or consideration. Any person who wants to attend the bid opening in person should contact the Procurement Officer listed in Section 1.3, for building access and parking instructions. In person attendees requiring special accommodations will need to follow the steps outlined in Section 4.2, Special Accommodations.

4.18. BID EVALUATION

Bids that do not meet all requirements, specifications, terms and conditions of this solicitation or fail to provide all required information, documents, or materials may be rejected as non-responsive.

The Department may request, and Bidder shall provide, clarifying information or documentation.

Failure to timely provide the information or documentation as requested may result in the Bid being deemed non-responsive.

4.19. BASIS OF AWARD

The Basis of Award shall be to the responsive and responsible bidder who bids the lowest Total Price for the Base Bid, as specified on ATTCHMENT C – BID PRICE SHEET; or the Base Bid plus any and/or all Additive Alternate No.1 and additive Alternates No. 1, No. 2, and No. 3, as chosen by the Department, to be included in or excluded from the proposed contract.

Per Unit Price submissions for Additive Alternate No. 3 shall not be included in the Basis of Award.

An award from this Bid does not constitute an official purchase order or contract, agreement or commitment on behalf of the State. In the event that the Bidder with the lowest Base Bid is found non-responsive or the awarded purchase order/contract is terminated prior to completion, the Department may proceed to the next responsive Bidder with the lowest Total Price and continue the award process.

As the best interest of the State may require, the Department reserves the right to reject any and all bids or waive any minor irregularity or technicality in bids received. Bidders are cautioned to make no assumptions unless their bid has been evaluated as being responsive.

Any further clarification, if necessary, will be by written addendum. All other provisions of the award’s paragraph, General Conditions, shall prevail. The Department reserves the right to award, or not award, contract(s) based on the availability of funds.

4.20. BID RULES FOR WITHDRAWAL

A submitted bid may be withdrawn by submitting a written request for its withdrawal to the Department. The withdrawal request must be signed by an authorized representative of the Bidder and must be received within 72 hours after the bid submission date indicated in the Timeline. Any submitted bid shall remain valid for 90 days from the bid submission date.

4.21. VERBAL INSTRUCTION PROCEDURE/DISCUSSIONS

The Bidder shall not initiate, or execute, any negotiation, decision, or action arising from any verbal discussion with any state employee. Only written communications from the Department’s Procurement Officer are considered duly authorized expressions on behalf of the state. Additionally, only written communications from a Bidder are recognized as duly authorized expressions on behalf of the Bidder. Any discussion by a Bidder with any employee, or representative of the Department, involving cost or price information, occurring prior to posting of the Notice of Agency Decision, may result in rejection of said Bidder’s response.

4.22. NO PRIOR INVOLVEMENT AND CONFLICT OF INTEREST

Section 287.057(19)experience, F.S., states, “A person who receives a contract that has not been procured pursuant to Subsections (1)-(3) to perform a feasibility study of the potential implementation of a subsequent contract, who participates in the drafting of a solicitation or who develops a program for future implementation, is not eligible to contract with the agency for any other contracts dealing with that specific subject matter, and any firm in which such person has any interest is not eligible to receive such contract. However, this prohibition does not prevent a Bidder who responds to a request for information from being eligible to contract with an agency.”

The Department considers participation in a solicitation to be any actions related to the decision, approval, disapproval, recommendation, preparation of any part of a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or functioning in any other advisory capacity.

The Bidder shall not compensate, in any manner, directly or indirectly, any officer, agent or employee of the Department, for any act or service, which they may do, or perform, for, or on behalf of, any officer, agent or employee of the Bidder. Officers, agents or employees of the Department shall not have any interest, directly or indirectly, in any contract or purchase made, or authorized to be made, by anyone for, or on behalf of, the Department.

The Bidder shall have no interest, and shall not acquire any interest, that conflicts in any manner, or degree, with the performance of the services required under this ITB.

4.23. SCRUTINIZED COMPANIES AND PROHIBITED BUSINESS ACTIVITIES

Pursuant to Section 287.135, F.S., a company or other entity is ineligible to, and may not bid on, submit a proposal for, or enter into or renew a contract with an agency or local governmental entity for goods or services of any amount if, at the time of bidding on, submitting a proposal for, or entering into or renewing such contract, the company is on the Scrutinized Companies that Boycott Israel List, created pursuant to Section 215.4725, F.S., or is engaged in a boycott of Israel.

When goods or services to be provided are $1 million or more, Section 287.135, F.S., requires the Contractor to certify that it is not 1) on the Scrutinized Companies with Activities in Sudan List; 2) on the Scrutinized Companies; with Activities in the Iran Terrorism Sectors List, created pursuant to Section 215.473, F.S., or 3) engaging in business operations in Cuba or Syria.

In order for your bid to be considered responsive ATTACHMENT F – CERTIFICATION REGARDING SCRUTINIZED COMPANIES, must be completed and included in your bid package. The list may be found at https://www.sbafla.com/reporting/. The Department may immediately terminate any contract, resulting from this bid, for cause if the Contractor is found to have submitted a false certification.

4.24. CERTIFICATION REGARDING LOBBYING; DEBARMENT, SUSPENSION AND OTHER

RESPONSIBILITY MATTERS FOR EXPENDITURE OF FEDERAL FUNDS TIE BIDS

Any person submitting a response to this bid MUST execute ATTACHMENT G –

CERTIFICATION REGARDING LOBBYING; DEBARMENT, SUSPENSION AND OTHER

RESPONSIBILITY MATTERS FOR EXPENDITURE OF FEDERAL FUNDS (form FDACS- 01522), and enclose it with their Bid response. The Certification for Lobbying is required for expenditures $100,000 and above. The Certification for Debarment and Suspension and Other Responsibility Matters is required for expenditures $25,000 and above.

4.25. IDENTICAL TIE BIDS

When evaluating Bidder responses to solicitations where there is identical pricing or scoring from two or more Bidders, the Department shall determine the order of award in accordance with Sections 287.057 (12), 287.087 and 295.187(4), F.S.

1) CERTIFIED BUSINESS ENTERPRISE: Pursuant to Section 287.057(12), F.S., if two equal bids are received and one bid is from a certified Business Enterprise, the Department must contract with the Certified Business Enterprise. Bidders must provide a copy of this certification pursuant to Section 287.09451, F.S., in their bid response to receive this preference.

2) CERTIFICATION OF DRUG-FREE WORKPLACE PROGRAM: Pursuant to Section

287.087, F.S., whenever two or more bids, proposals or replies that are equal with respect to price, quality and service are received by the state or by any political subdivision for the procurement of commodities or contractual services, a bid, proposal or reply received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. To be considered for the drug-free workplace program preference, Bidders may provide ATTACHMENT H – CERTIFICATION OF DRUG-FREE WORKPLACE PROGRAM that it has implemented a drug-free workplace program. Bidders must provide this certification in their bid response to receive this preference.

3) FLORIDA VETERAN BUSINESS ENTERPRISE OPPORTUNITY ACT PREFERENCE:

Pursuant to Section 295.187(4), F.S., a state agency, when considering two or more bids, proposals or replies for the procurement of commodities or contractual services, at least one of which is from a certified veteran business enterprise, which are equal with respect to https://www.sbafla.com/reporting/ all relevant considerations, including price, quality and service, shall award such procurement or contract to the certified veteran business enterprise. Proof of certification pursuant to Section 295.187(5), F.S., shall accompany the bid. Failure to submit proof of certification will result in non-application of the preference.

4.26. DISQUALIFICATION OF BIDDERS

More than one bid from an individual, firm, partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that a Bidder is interested in more than one bid for the same work will cause the rejection of all bids in which such Bidders are believed to be interested.

If there is reason to believe that collusion exists among the Bidders, any or all bids will be rejected. No participants in such collusion will be considered in future bids for the same work.

Falsifications of any entry made on the Bidder’s offer will be deemed a material irregularity and will be grounds for rejection.

4.27. REJECTION OF BIDS

The Department reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida and to reject the bid of a Bidder who the Department determines is not in a position to perform the contract.

4.28. PROTEST PROCEDURES

Pursuant to Section 120.57(3), F.S., a Notice of Protest or Formal Written Protest must be filed at the following physical address:

Agency Clerk Florida Department of Agriculture and Consumer Services The Holland Building 600 South Calhoun Street Tallahassee, Florida 32399

Physical filings received after regular Business Hours (8:00 a.m. to 5:00 p.m., ET) will be deemed filed the next business day. Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

SECTION 5.0 SPECIAL CONDITIONS

5.1. CONTRACT TERMS AND CONDITIONS

The construction, interpretation and performance of this contract, and all transactions under it, shall be governed by the laws of the State of Florida. The contract documents shall include all terms and conditions expressly accepted by the Department in writing of the bid specifications, any addenda, and the APPENDIX II – AGREEMENT BETWEEN OWNER AND CONTRACTOR, which will be executed by the Department and the Awarded Contractor. In the case of conflict between the Department’s resulting contract and any Bidder generated terms and conditions expressly accepted by the Department in writing, the terms of the Department’s resulting contract shall prevail.

5.2. UNITED STATES-PRODUCED IRON AND STEEL REQUIREMENTS

Provided the Project is a “Public Works Project” as defined by Section 255.0993(1)experience, F.S., and unless waived in accordance with Subsection 60D-16.002(3), F.A.C., Construction Manager shall ensure that any iron or steel product permanently incorporated in the project be produced in the United States, as provided in Section 255.0993, F.S., and Chapter 60D-16, F.A.C.

5.3. LIQUIDATED DAMAGES

In the event the work is not completed on the completion date, and inasmuch as failure to complete the project within the time fixed in the bid will result in substantial injury to the Department, and as damages arising from such failure cannot be calculated with any degree of certainty, it is hereby agreed that, if the project is not completed within the fixed time, the Contractor shall pay to the Department, as liquidated damages for such delay and not as a penalty, two hundred and fifty dollars ($250) for each calendar day elapsing between the date fixed for completion and the actual date of completion. The Contractor shall also be liable for liquidated damages as described in the Products Submitted for Application and Installation herein.

5.4. CODES AND INSPECTIONS

The Contractor is required to comply with all federal, state and local laws; ordinances; rules;

regulations and codes that in any manner affect the work. Ignorance on the part of the Contractor will in no way relieve it from this responsibility. All inspections required to ensure compliance with required codes are the responsibility of the Contractor and must be accepted by the Contract Manager.

5.5. PROHIBITION OF ASBESTOS

No material containing asbestos shall be used. Certification from the Contractor that no such material was used in the project will be required before acceptance of the project by the Department. Contractor shall also forward a copy of this certification to the Contract Manager.

5.6. TAXES

Although FDACS is not subject to the Florida sales and use tax, any Contractor who purchases materials and services, which will be used in the construction of state-owned/operated buildings, will not be exempt from the tax on these materials and services as evidenced by Florida Statutes.

5.7. TIME DELAYS

If the Contractor is delayed at any time in the progress of the work by changes ordered in the work, by labor disputes, fire, unusual delay in transportation, adverse weather conditions not reasonably anticipated, unavoidable casualties or other causes; the Contractor may submit a written request for additional time to complete the work, with supporting documentation. If FDACS determines that the circumstances warrant an extension of time for completion of the contract, the time will be granted for completion by a change order (APPENDIX II – AGREEMENT BETWEEN OWNER AND CONTRACTOR – CHANGE ORDER REQUEST) for such reasonable time as FDACS may determine. Verbal requests for extensions will not be considered.

5.8. CHANGES TO CONTRACT

The Contractor’s performance of work necessary to complete the project is specified herein.

Should conditions alter the nature and extent of the work specified in the bidding and contract documents cause greater or less cost and/ or time to perform the work specified, an adjustment shall be made by means of a written change order to the contract cost and/or time. It is in the best interest of the state that the Contractor performs changes in the work and that bidding is not required if:

1) The Contractor’s performance and capability remain satisfactory at time of proposed change order.

2) The change is within the general scope of the contract, and the contract contains a method of calculating overhead and profit caused by change orders.

3) The change will reduce either the scope or size of the project or the contract amount.

4) The change is an integral part of the project and is necessary to correct an unanticipated condition, which is necessary to permit the construction to continue and the Contractor will agree to a reasonable negotiated increase in the contract price. The Department will make a determination of the best interest of the state based on these criteria for each proposed change in work.

5.9. WORK SCHEDULE

After the construction contract is awarded, the Contractor shall submit a proposed work schedule to the Contract Manager at the time of the pre-construction meeting. The schedule shall be in the form of a work schedule or a detailed report showing the following information:

5.9.1. For each area of work

1) work dates

2) work shift time

3) number of employees on site

4) dates of start and completion per area of work

5.9.2. Any items of work that will delay the start or completion of the entire project.

5.9.3. Project completion and final inspection. The schedule shall be dated and signed by the Contractor.

5.10. SUPERVISION

After the construction contract is awarded, the Contractor shall personally supervise all work at the site and provide full-time supervision for all employees, subcontractors, and other agents on the project. The Contractor shall assign and name a full-time supervisory employee to (i) provide scheduling direction to the entire project; (ii) maintain on-site records; (iii) be responsible for the layout and dimensional control of the structures of the project; and (iv) ensure compliance with all contract documents, including with respect to drawings, specifications, quality control, health, safety, and environment. At no time will any work be permitted by Contractor at the site without the supervisory employee monitoring the work in progress. All supervisory employees (including field superintendents, foreman, and schedulers at all levels) must be familiar with the materials and systems specified in the contract documents and must have been employed in a supervisory (leadership) capacity of a substantially equivalent level on a similar project for at least two years within the last five years. After the construction contract is awarded, the Contractor shall include a resume of xperiencee for each of those proposed supervisory employees.

5.11. SCHEDULE OF VALUES

After the construction contract is awarded, the Contractor shall submit a schedule of values to the project manager at the time of the pre-construction meeting. The schedule shall breakdown all the main areas of construction and total the contract price.

5.12. WORKMANSHIP

All work is to be accomplished by skilled craftsmen complimenting the trade involved. All material used is to be installed in strict accordance with the manufacturer’s specifications. Improper installation or poor workmanship will not be accepted.

5.13. CLEAN-UP

Upon completion of the work, the Contractor shall remove all trash and debris from the site and shall leave the premises clean and in a finished condition acceptable to the Department. All equipment removed during the course of the project must be disposed of by the Contractor.

Departmental dumpsters are not to be used for the disposal of any products in relation to the completion of this project. All debris shall be hauled away and destroyed in an appropriate manner. No hauling fee(s), tipping fee(s), trash fee(s), hazardous waste fee(s) or other related garbage fee(s) shall be charged to the Department.

5.14. RESOURCE PROTECTION

The Contractor shall perform the work in a safe and careful manner and will furnish and use such safety devices, methods and measures as are required to protect Contractor and employees thereof, department personnel, and the general public against bodily injury and/or damage to property.

5.14.1. PROTECTION OF WETLANDS

The Contractor shall use every precaution necessary to prevent pollution of wetlands and ditches, by fuel, oils, other chemicals, silt, or other harmful materials. All wetlands and ditches will be kept free of Contractor-generated debris.

5.14.2. PROTECTION OF ARCHAEOLOGICAL/HISTORICAL RESOURCES

The Contractor, upon the discovery of suspected archaeological or historical materials, shall cease work in the vicinity of such material and immediately notify the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .