This Addendum #1 is issued by the City of Ocala for Solicitation Number ITB# CDS/250616A, titled "New Construction Residential Home – Coy Deidre". The addendum provides key details for potential contractors, specifying construction requirements for a residential home project. Contractors are required to begin work within 10 calendar days of receiving a Notice to Proceed (NTP) and complete the project within 150 days of the NTP. The project includes specific landscaping requirements, mandating the installation of 6,500 square feet of Argentine Bahia grass around the home and a complete right-of-way.

The addendum emphasizes that all installations or replacements must use new products or materials. A critical technical specification requires the finished floor elevation (FFE) to be a minimum of 1 foot above the base flood elevation when in a flood zone, or at the highest point of the road in front of the lot. The document is marked with the City of Ocala's logo and the DSBF (Diverse Small Business Fund) logo, suggesting potential small business or diversity considerations in the bidding process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 1

Date: August 26, 2025 To: All bidders From: Louis Joseph, Buyer Solicitation Number: ITB# CDS/250616A Solicitation Title: New Construction Residential Home – Coy Deidre

SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS

NOTE: ALL INSTALLATIONS OR REPLACEMENTS MUST INCLUDE NEW PRODUCTS

OR MATERIALS.

ITEM 1. Construction Time

1. Contractor shall have a maximum of ten (10) calendar days to begin work after the City issues a Notice to Proceed (NTP). Work must be completed and ready for final payment within one hundred fifty (150) days of the issued NTP.

ITEM 2. Landscaping

1. Contractor shall provide a minimum of 6500 square ft. of Argentine Bahia around the home after final grade and include a complete right-of-way.

ITEM 3. Elevations

1. FFE shall be a minimum of 1’ above the base flood elevation when in a flood zone or the highest point of the road in front of the lot.

SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS
ITEM 1. Construction Time
ITEM 2. Landscaping
ITEM 3. Elevations