ITB_CDS250327_NEW_CONSTRUCTION_Residential_Home_-_Cynthia_Thomas_1635_NW_24th_Ave._-_Addendum_1.pdf
PDF 92 KB Posted
- Solicitation number
- ITB# CDS/250327
- Issued by
- Marion County, Orlando City, Florida
About this file
This document is Addendum #1 for Invitation to Bid (ITB) #CDS/250616A issued by the City of Ocala for a New Construction Residential Home project for Coy Deidre. The addendum provides critical details for potential contractors, including specific requirements for project execution. The contractor must begin work within 10 calendar days of receiving the Notice to Proceed (NTP) and complete the project within 150 days of the NTP. Landscaping requirements include installing a minimum of 6,500 square feet of Argentine Bahia grass around the home and completing the right-of-way.
The addendum emphasizes that all installations and replacements must use new products or materials. A key technical specification requires the finished floor elevation (FFE) to be a minimum of 1 foot above the base flood elevation when in a flood zone, or at the highest point of the road in front of the lot. The document is dated August 26, 2025, and was prepared by Louis Joseph, the buyer, and includes logos for the City of Ocala and the DSBF (Diverse Small Business Firm) organization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum # 1
Date: August 26, 2025 To: All bidders From: Louis Joseph, Buyer Solicitation Number: ITB# CDS/250616A Solicitation Title: New Construction Residential Home – Coy Deidre
SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS
NOTE: ALL INSTALLATIONS OR REPLACEMENTS MUST INCLUDE NEW PRODUCTS
OR MATERIALS.
ITEM 1. Construction Time
1. Contractor shall have a maximum of ten (10) calendar days to begin work after the City issues a Notice to Proceed (NTP). Work must be completed and ready for final payment within one hundred fifty (150) days of the issued NTP.
ITEM 2. Landscaping
1. Contractor shall provide a minimum of 6500 square ft. of Argentine Bahia around the home after final grade and include a complete right-of-way.
ITEM 3. Elevations
1. FFE shall be a minimum of 1’ above the base flood elevation when in a flood zone or the highest point of the road in front of the lot.
| SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS |
| ITEM 1. Construction Time |
| ITEM 2. Landscaping |
| ITEM 3. Elevations |