This document consists of a technical drawing for the ITB Bear Creek Drive Waterline Seismic Retrofit Project, displaying detailed site plans and infrastructure specifications for a water utility improvement project. The drawing shows property locations and utility vault details along Bear Creek Drive, including rim elevation and invert elevation measurements for a concrete (CNC) pipe installation. However, there is a significant mismatch between this technical infrastructure project file and the related contract opportunity, which pertains to an educational equity coaching initiative for the Greater Albany School District under the Oregon Department of Education.
The related state and local contract opportunity is an ISP (Instructional Services Provider) Coaching solicitation issued by the Oregon Department of Education for the Greater Albany School District, with a not-to-exceed budget of $100,000 and a proposal response deadline of August 8, 2024, at 9:00 AM PST. The anticipated contract start date is Fall/September 2024. The coaching services focus on equity and culturally responsive pedagogy, with key deliverables including development of inclusive classroom practices, bias response protocols, and frameworks for critical conversations about race within the district's predominantly white teaching and leadership staff. The solicitation is open to pre-approved ISP vendors and will utilize a hybrid model combining in-person and virtual engagement. Vendor selection will be based on capacity, availability, experience, willingness to travel, and alignment with the district's original coaching request. No specific set-asides for disadvantaged enterprises are mentioned, and no information regarding incumbent vendors or technological infrastructure requirements is provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Summary Form Project 2021-13.pdf | ||
| Greater Albany SD_ Quote Form~2.docx | DOCX document | |
| GAPS - Equity Statement of Interest for Coaching.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
f
TBKLLC
485 BEAR CREEK DR
381W09DA • 3000
r=====�g ��L TV
.!. isl;' Bf:d'.AP ����£<Hee::" -9!Bl::'!f"1l! .... _>
Bear Creek Drive
UMPQUABANK
404NMAINST
381W09DD. 300
I
I
I
I
I
I
UMPQUABANK
404NMAIN5T
381W09DD-400
HOLDEN LEONE /
457 BEAR CR DR I
A -4400
- - -- - - d------------
I MHl!t StorM Dro.ln Vo.ult RIM EL=l490.20 IE=l486.05 20' CNC <SV>
IE =1485,35 24' Nl2 <ND ,suMp=l482.50
STATE OF OREloN
BEAR CR DR
381W10CC-100
MHl61 So.nlto.ry Sewer - - - - -
-------;7 MHl71 Storr> Oro.In
RIM EL=l495,25 IE=l489.65 12' Nl2 <NV>
IE=l489.IO 20' CNC <SW)
IE=1488,95 20' CNC <ND
MHl81 So.nito.ry Sewer
RIM EL= 14 96.62
IE=l488.52 8' PVC <SD
IE=1487.57 12' VCP (SW)
IE=1487.37 12' VCP <ND
I
I
I
I
I
PLAN VIEW
r � 20·-o·
I
I
I
/7 f
RIM EL=l491.66 IE=l480.16 VCP (SW IE=l480.M vtP �
,(;' ,f-ll J<
/q
I
I
I
I
I
I
PHOENIX URBAN
FlENEWI\I-AGENCY
BEAR CR DR
381W09DD • 600
GENERAL NOTES 11
1) THE INTENT OF THIS PROJECT IS TO RETROFIT THE EXISTING
24' DI WATERLINE WITH JOINT RESTRAINTS SUCH THAT THE
ENTIRE SECTION OF WATERLINE ALONG BEAR CREEK DRIVE IS
CONTINUOUSLY RESTRAINED. THE SECTIONS OF PIPELINE
INDICATED TO BE RETROFITTED IN THESE PLANS ARE BASED
UPON THE ORIGINAL DESIGN DRAWINGS FOR THE
TALENT-ASHLAND-PHOENIX WATER INTERTIES PIPELINE AND
WATER SYSTEM IMPROVEMENTS, DATED JULY 14TH, 2000,
PREPARED BY MONTGOMERY WATSON. THE ORIGINAL DESIGN
DRAWING ARE INCLUDED AS AN APPENDIX TO THE BID
PACKAGE FOR REFERENCE, THE EXACT LENGTHS OF
EXISTING UNRESTRAINED PIPE, AND ANY STATED QUANTITIES
OF JOINT RESTRAINTS REQUIRED TO RESTRAIN THE PIPE,
ARE ESTIMATED BASED SOLELY ON THE ORIGINAL
CONSTRUCTION DRAWINGS. QUANTITIES WILL CHANGE
DEPENDING ON ACTUAL CONDITIONS FOUND IN THE FIELD
DURING POTHOLING BY THE CONTRACTOR.
2) RESTORE TRENCH PER DETAIL 1 ON SHEET D01.
3) WATER MAIN KEYNOTE 1 SHOWS THE APPROX LENGTH OF
PIPE TO RESTRAIN. AT EACH WORK LOCATION SHOWN ON
THESE PLANS, THE CONTRACTOR SHALL CONTINUE TO
EXCAVATE PIPE, IN BOTH DIRECTIONS BEYOND THE BOUNDS
SHOWN , UNTIL EXISTING RESTRAINTS ARE FOUND, TO
ENSURE ENTIRE PIPE IS RESTRAINED AT COMPLETION OF
PROJECT.
4) THE EX 24" DI TAP LINE IS COVERED IN CEMENT TREATED SOIL
OF VARIABLE DEPTH, WITH AN EXPECTED STRENGTH OF
APPROX 3000 PSI. AN APPROX 6' LAYER OF AC COVERS THE
CEMENT TREATED SOIL. THE CONTRACTOR SHALL BE AWARE
OF AND TAKE THIS INFORMATION INTO ACCOUNT WHEN
PERFORMING SAWCUTTING AND EXCAVATION WORK.
REMOVED FOR SPLIT BELL RESTRAINT OR FLEXIBLE 4
5) CONTRACTOR SHALL REPLACE ANY POL YWRAPPING @
EXPANSION JOINT INSTALLATION WITH NEW DOI
POL YWRAPPING MATERIAL. REFER TO DETAILS AND
SPECIFICATIONS FOR MORE DETAIL
WATER MAIN KEYNOTES
RETROflT EX 24' DI PIPE 111TH JOINT RESTRAINTS 2 0 FROM APPROX STA :;+06 TO 6+82· @ APPROX (10) SPLIT BEil RESTRAINTS. REFER TO DETAIL DOI r,;\ FROM APPROX STA 5+06 TO 6+82 PROY}()E:
� (1) - FLfXIBLE EXPANSION JOINT. CONTRACTOR LU
SHALL EXCAVATE AT THE ENGINEER'S DIRECTION � AND EXACT LOCATION \\1LL BE DETERMINED BY THE
ENGINEER DURING CONSTRUCTIOU. REF£R TO DETAIL
EXPIRES: 1213112025
a: t:: <( LL wO m a:
I-en w I- a:
C Zu z
W-
:3 w en o w :::c a: en en a. w <( 2�- ..J
C")
LL.
'I""'
I-w w :::c en
LL. 2 a:
0 w w I- � en en w z
:3 a.
(J a: > w- I- a:
<( C z
� ::ii:::
a. ww � a: u
:a:
a:
w I-
••<( I[� =�.. "1
I lo
< � 0 iii u
I � !a a a:
File details come from the government source that posted it. Updated .