Summary of ITB 22-041 Veterans Park Phase 2
This Invitation to Bid (ITB) document is issued by the City of Sandy Springs, Georgia, for Veterans Memorial Park Phase 2 interim improvements located at 280 Mount Vernon Highway at the intersection of Roswell Road, Johnson Ferry Road, and Mount Vernon Highway. The project comprises two parts: Part One covers site demolition, grading, topsoil and sod installation, survey services, erosion control, fence installation, and site cleanup; Part Two addresses soil remediation activities including excavation, shoring, waste profiling, transportation, and disposal of approximately 352 cubic yards (529 tons) of contaminated soil. A non-mandatory pre-bid site visit is scheduled for March 1, 2022, at 10:00 a.m. at City Hall. Questions must be submitted by March 7, 2022, at 5:00 p.m. via the Bonfire portal. Bids are due March 17, 2022, at 2:00 p.m. and must be submitted exclusively through the online Bonfire portal. All work will be awarded in a single contract, and contractors must possess current OSHA 40-Hour Hazardous Waste and Emergency Response (HAZWOPER) training certification. The work shall commence within ten calendar days of the Notice to Proceed.
Bidders must submit comprehensive documentation including a City Bid Form, Qualification Signature and Certification Form, References Form, detailed construction schedules, proposed disposal facilities, and evidence of employee hazardous waste training. Bid bonds equal to 5% of the bid amount are required. Part One includes a lump sum General Conditions item plus cash allowances of $5,000 each for testing and utility conflict resolution, with unit pricing for unsuitable material removal and replacement materials. Part Two utilizes lump sum pricing for Planning and Coordination, Site Preparation and Demolition, and Backfill and Site Restoration, with unit pricing for shoring (per square foot), contaminated soil excavation and handling, and waste transportation and disposal (per ton). All materials must be sourced from Georgia Department of Transportation certified suppliers. Contractors are responsible for all permits, utility clearance through Georgia 811, equipment, insurance, performance and payment bonds, and Best Management Practices installation and maintenance throughout the project duration.
Text of this file
INVITATION TO BID
22-041
VETERANS PARK PHASE 2
Non Mandatory Pre-Bid Site Visit:
March 1, 2022, 10:00 am
City Hall 1 Galambos Way
Sandy Springs, Georgia 30328 Please meet in the lobby
Questions Due
March 7, 2022, 5:00 p.m.
Bid Due Date & Public Opening:
March 17, 2022, 2:00 p.m.
Meeting link:
https://sglass-640.my.webex.com/sglass-.my/j.php?MTID=mc59e86db4e798d3c43afdd4024c6acdf
Meeting number:
2368 482 6980
Password:
65247435 from phones
Join by phone +1-650-215-5226 United States Toll
Access code: 2368 482 6980
Bids shall only be accepted online through the Bonfire Portal at:
https://sandysprings.bonfirehub.com/projects/60105/details
Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
https://sglass-640.my.webex.com/sglass-640.my/j.php?MTID=mc59e86db4e798d3c43afdd4024c6acdf
GENERAL INFORMATION:
1. All communications regarding this solicitation must be with the assigned Procurement
Agent, Delores Hill, purchasing@sandyspringsga.gov.
2. All questions or requests for clarification must be sent via Bonfire under Message - Opportunity Q&A: https://sandysprings.bonfirehub.com/projects/60105/details Questions are due no later than March 7, 2022, 5:00 p.m. Questions received after this date and time may not be answered.
3. Questions and clarifications will be answered in the form of an addendum. Any addenda, schedule changes and other important information regarding the solicitation related to this solicitation will be posted on Bonfire website at https://sandysprings.bonfirehub.com/projects/60105/details It is the Offeror’s responsibility to check the Bonfire portal for any addendum or other communications related to this solicitation.
4. The form of contract (“Model Contract”) the City intends to execute with the successful Offeror is included in this ITB. Offerors are urged to read this Model Contract, including exhibits carefully prior to submitting a bid. In general, the City is unable to negotiate or revise contract provisions.
If an Offeror believes certain contract provisions are out of date, not applicable or place an undue burden or cost on the Offeror or the City, the Offeror must address these concerns in writing during the question and answer period. The Procurement Manager will review and determine the appropriate response. If the City determines a change is warranted, an addendum will be posted to this ITB. If a firm is unwilling to execute the Model Contract, whether modified by addendum or not, a bid should not be submitted.
5. The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs.
6. The City of Sandy Springs is not responsible for any technical difficulties. It is highly recommended that all potential contractors submit their quotes prior to the due date of this solicitation.
mailto:purchasing@sandyspringsga.gov
TERMS & CONDITIONS
1. All applicable Federal and State of Georgia laws and City of Sandy Springs ordinances, licenses and regulations of all agencies having jurisdiction shall apply to Offerors throughout and are incorporated herein.
2. Professionals requiring special licenses shall be licensed in the State of Georgia, and shall be responsible for those portions of the work as may be required by law.
3. No bid shall be accepted from, and no contract will be awarded to, any person, firm, or corporation that (i) is in arrears to the City with respect to any debt, (ii) is in default with respect to any obligation to the City, or (iii) is deemed irresponsible or unreliable by the City.
4. The City shall be able to request of an Offeror satisfactory evidence that it has the necessary financial resources to accomplish the requirements of the contract.
5. From the date this ITB is issued until a firm is selected, Offerors are not allowed to communicate with any staff or elected officials of the City regarding this solicitation, except at the direction of
Delores Hill, Procurement Officer in charge of this solicitation. Any unauthorized contact may disqualify the Offeror from further consideration. Contact information for the single point of contact is as follows:
Delores Hill, Procurement Agent City of Sandy Springs 1 Galambos Way Sandy Springs, Georgia 30328 Email: purchasing@sandyspringsga.gov
6. While the City has every intention to make an award as a result of this solicitation, issuance of the
ITB in no way constitutes a commitment by the City to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:
a. Cancel or terminate this ITB at any time. A notice of cancellation will be issued. If the
RFP is cancelled, the City will not reimburse any Offeror for preparation of its
Proposal. Proposals may be returned upon request if unopened;
b. Reject any or all Proposals received, make a contract award based directly on the
Proposals received in the best interest of the City, in its sole discretion, or enter into further discussions with one (1) or more Offerors;
c. Waive and/or amend any undesirable, inconsequential, or inconsistent provisions/specifications of this ITB which would not have significant impact on any
Proposal;
d. Make partial award or no award if it is in the best interest of the City to do so; and
e. Terminate any contract if the City determines adequate funds are not available.
mailto:purchasing@sandyspringsga.gov
DEFINITIONS
SSPWD: Sandy Springs Public Works Department
GDOT: Georgia Department of Transportation
ADA: Americans with Disabilities Act. The federal act that gives civil rights protections to the disabled similar to those provided to individuals based on race, color, sex, national origin, age and religion. It guarantees equal opportunity for individuals with disabilities in public accommodations, employment, transportation, state and local government services and telecommunications.
CONTRACT DOCUMENTS: Contract Agreement. General Conditions, Appendices, Special Provisions, Technical Specifications, Drawings and Plans, Bidding Documents, Exhibits
EA: Each
GAL: Gallon
LF: Lineal Feet
LS: Lump Sum
SY: Square Yard
TN: Ton
OWNER: City of Sandy Springs
Contractor: The Prime Contractor for the Construction
Project. DOL: U.S. Department of Labor
SCOPE OF SERVICES
PARTS ONE & TWO
VETERANS MEMORIAL PARK, PHASE II INTERIM IMPROVEMENTS
CITY OF SANDY SPRINGS, GEORGIA
Note: Contractor, prime or sub, must be qualified and experienced to perform soil remediation work, and have current
OSHA 40-Hour Hazardous Waste and Emergency Response (HAZWOPER) Standard Training.
This project includes improvements of the City-owned parcels at the intersection of Roswell Road, Johnson Ferry Road and
Mount Vernon Highway. This project will include:
PART 1 – SITE DEMOLITION & GRADING
Demolition, removal and haul-off all pavements, foundations, utilities, etc.
Earthwork, site grading
Provide 6” of topsoil and sod
Provide cut/fill survey services
Provide final as-built survey
Erosion control
Water sod for a period of 3-months
Installation of low perimeter barrier fence
Installation of aggregate laydown area
Provide final site clean-up
PART TWO - SOIL REMEDIATION:
Contractor shall adhere to the Soil Management Bid Package, dated January 28, 2022
Soils to be disposed of at classified landfill
Design and install all temporary shoring measures required
The Soil Remediation Bid Package includes:
o Planning and Coordination o Mobilization, Demobilization and Site Preparation o Partial Demolition o Excavation and Soil Handling o Erosion Control o Waste Profiling, Manifesting, Transportation and Disposal, and, o Backfilling and Site Restoration
Contractors are responsible for reviewing the following documents prior to submitting a bid:
PART 1 – City of Sandy Springs, Veterans Park, Interim Phase 2 Improvements, prepared by Barge Design Solutions Inc., dated January 28, 2022, PART 2- Request for Bid, Soil Remediation Bid Package, Sandy Springs Veterans Park Interim Phase 2 Improvements, prepared by United Consulting, dated January 28, 2022
The Contractor shall provide the necessary machinery, tools, apparatus, other means of construction and all materials and labor specified in the Contract Documents or as necessary to complete this City of Sandy Springs project per the attached plans and documents (Parts 1 and Part 2).
Unless otherwise directed, all work performed shall be in accordance with the above referenced plans and bid documents.
There is no City-furnished equipment to be installed by the contractor.
Bonds will be required for this project.
The work will be awarded in one (1) Contract.
END OF SECTION
BIDDING INSTRUCTIONS
Failure to submit the following bid documents may result in the bid being deemed non-responsive and the bid shall be rejected:
City Bid Form City Qualification Signature and Certification Form
Reference Form Bid Schedule Bid Price Certification
Everify Affidavit under O.C.G.A. 13-10-91(b)(1) Bid Bonds 5%
Addenda Acknowledgment
BID SUBMITTALS
A. Bidder shall provide with its Bid the proposed off-Site disposal and recycling facilities to be used for disposal of excavated soils and decontamination water, demolition debris, and any other materials requiring disposal in connection with the work, along with any characterization and disposal profile requirements of those facilities. Such facilities are subject to the approval of the Environmental Consultant and Owner, and may not be changed without the written consent of the Environmental Consultant. Environmental Consultant will obtain and provide the Contractor with the information required by the disposal facility for acceptance.
B. Bidder shall provide with its Bid a construction schedule, including but not limited to proposed sequencing of demolition, excavation and associated preparation activities, stockpiling, transportation and backfilling activities.
C. Bidder shall provide the necessary written documentation that all Contractor personnel assigned to or entering the Site for the purpose of performing or supervising work, for health, safety, security, or administrative purposes, for maintenance, or for any other Site-related function, have received the appropriate hazardous waste operations safety training in accordance with OSHA 29 CFR 1910.120, and any other training required by Federal, State or local laws and regulations.
Upon award of contract the following items shall also be submitted:
Certification of Sponsor Drug Free Workplace Georgia Security Immigration Compliance Act Affidavit Certificate of Insurance Notice to Contractors Compliance with Electrical Safety Provisions Affidavit verifying Status for City Public Benefit Application Corporate Certificate Payment Bonds Performance Bonds
BID FORM
(Bidder to sign and return)
TO: PURCHASING MANAGER
CITY OF SANDY SPRINGS
SANDY SPRINGS, GEORGIA 30350
Ladies and Gentlemen:
In compliance with your Invitation To Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Sandy Springs, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
ITB #22-041 VETERANS PARK PHASE 2
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Sandy Springs in full conformance with the Contract Documents.
Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition). All materials used in the process of completion of the work included in the Contract will be furnished from Georgia Department of Transportation certified suppliers only.
It is the intent of this Bid to include all items of construction and all Work called for in the Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract Documents but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces and equipment within ten (10) calendar days from receipt of Notice to Proceed.
The Bidder will be required to sign a “Notice of Intent” (NOI) as the “operator” prior to beginning construction. The Bidder shall be responsible for installing and maintaining the “Best Management Practices” (BMP’s) throughout the term of the project. Upon completion and prior to final payment the Bidder will be required to sign a “Notice of Termination (NOT) upon final approval by COSS.
If this bid shall be accepted by the City of Sandy Springs and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Sandy Springs may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond or certified check shall be forfeited to the City of Sandy Springs as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date Received
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this day of
Bidder
Company Name
Seal
Bidder Mailing Address:
By:
Title: _
By:
Title:
01977500-2
QUALIFICATIONS SIGNATURE AND CERTIFICATION
(Bidder to sign and return)
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et. seq., have not been violated and will not be violated in any respect.
Authorized Signature Date_
Print/Type Name
Email Address
Print/Type Company Name Here_
REQUEST FOR REFERENCES
INVITATION TO BID #22-041
VETERANS PARK PHASE 2
All references must be from customers for whom your company has provided projects completed in the last five years of similar scope and services as the specifications of Invitation to Bid #22-41 Veterans Park Phase 2
References for: _______________________________________
(Company Name)
1. Company ______________________________________________________________ Street Address ____________________________________________________________ City, State & Zip ____________________________________________________________ Contact Person Name_______________________________ Phone___________________ Email address______________________________________________________________ Describe specific job performed and date: _______________________________________
2. Company________________________________________________________________ Street Address ______________________________________________________________ City, State & Zip _____________________________________________________________ Contact Person Name________________________________ Phone___________________ Email address_______________________________________________________________ Describe specific job performed and date: ________________________________________
3. Company _______________________________________________________________ Street Address ______________________________________________________________ City, State & Zip _____________________________________________________________ Contact Person Name ______________________________ Phone ____________________ Email address_______________________________________________________________ Describe specific job performed and date: ________________________________________
BID SCHEDULE
VETERANS MEMORIAL PARK, PHASE 2 INTERIM IMPROVEMENTS
280 Mt. Vernon Highway, Sandy Springs, Georgia
PART ONE – SITE PREPARATION BID PACKAGE
Per Documents Issued by Barge Design Solutions, Inc., and Dated January 28, 2022
Item
No. Description Estimated Qty. Unit Unit Price Total Price
1 All General Conditions costs and furnishing all products, materials and equipment and performing all labor necessary to complete and put into operation the Veterans Park Phase II Interim
Improvements, including all Earthwork (on-site haul, placement & compaction), all Material Export
(off-site haul of demolished materials, pavement and subgrade materials) and all work shown on the
Drawings and/or specified, the total amount of:
2 Cash Allowances:
a. Soils & Compaction Testing $5,000.00
b. Utility Conflict Resolution $5,000.00
3 Removal of Unsuitable Material and:
a. Haul Off-Site & Appropriate Disposal of Unsuitable
(Non-Contaminated) Material
50 TON $ $
b. Replacement with Crushed Stone 20 CY $ $
c. Replacement with Suitable Structural Fill 50 CY $ $
PART ONE - BID TOTAL, ITEMS 1 THROUGH 3, INCLUSIVE, THE AMOUNT OF: $
LUMP SUM
ALLOWANCE
ALLOWANCE
* * * Additional Work If Ordered By The Engineer * * *
NOTE: Funds from Items 2 and 3 above shall only be utilized & invoiced by the contractor upon receipt of written authorization from the City for the use of these funds.
(Write out or Type in the Amount Here:)
PART TWO – SOIL REMEDIATION BID PACKAGE
Per Request for Bid Document Issued by United Consulting and Dated January 28, 2022
Item
No. Description Quantity Unit Unit Price Total Price
1 Planning and Coordination 1 LS $ $
- Pre-mobilization site inspection;
- Site Control Plan;
- HASP and Spill Prevention Plan;
- Project Management and Onsite Supervision; and,
- Bonding and Insurance.
2 Site Preparation and Demolition 1 LS $ $
- Construct/Deconstruct decontamination pad;
- Installation/Maintenance/Removal of Erosion and Sediment Controls, where necessary;
- Proper PPE; Dust and odor suppression; and, 3 Engineer Designed Shoring and Installation 3,300 SQ.FT. $ $
4 Contaminated Soil Excavation and Handling 1 LS $ $
- Excavate 352 c.y. contaminated soils above residential soil RRS for off-site landfill disposal;
- Construction and maintenance of stockpiled area; and,
- Equipment decontamination.
NOTE: Contractor (prime or sub) must be qualified and experienced to perform soil remediation work and have current
OSHA 40-Hour Hazardous Waste and Emergency Response (HAZWOPER) Standard Training.
- Demolition and disposal of walls, concrete slabs and footers in soil excavation area not anticipated for use as engineered backfill;
- This task should include additional costs for demolition that may be associated with alternative soil stabilization methods (shoring) beyond the quantities of materials noted in the Bid Package. The additional quantities of any such materials should be clearly stated as an attachment to this Bid Form.
- This task should include costs for shoring and/or slope back of excavation as proposed by the bidder. If additional soil removal is required based on the method proposed by the bidder, the additional quantities and types of soil should be noted, and included in this lump sum. The additional quantities of any such materials should be clearly stated as an attachment to this Bid Form. If shoring is the recommended method, details associated with the type and installation of the shoring should be provided in the response to bid. If slope backs of the excavation are the recommended method, details associated with the sloping should be provided
- Unless an alternate means and associated cost is provided, for the base bid, the Contractor is to assume 150 linear feet of soldier piles and lagging is needed to secure the approximate 22 feet deep excavation. This equates to 3,300 sq. ft. of shoring.
- Excavate and stockpile lower level impacted soil with concentrations of constituents below applicable cleanup standards (overburden) for on-site backfill;
5 Waste Profile, Transportation and Disposal 529 Tons $ $
- Preparation of waste profile(s) and other disposal facility requirements;
6 Backfill and Site Restoration 1 LS $ $
- Base stabilization prior to backfill;
- Backfill to surficial grades as specified; and,
- Seeding and/or any post-backfill maintenance of seeded areas until accepted by Owner’s General Contractor.
PART TWO - BID TOTAL, ITEMS 1 THROUGH 6, INCLUSIVE, THE AMOUNT OF: $
Item
No. Description Quantity Unit Unit Price
7 Extra Work Unit Costs (if required and authorized by Owner)
Additional excavation shoring, if required. Per Sq.Ft. $
Transportation and disposal of impacted non-hazardous soils to an approved Subtitle D facility.
Per Ton $
Transportation and disposal of non-hazardous decontamination solids and liquids (Consultant will sample and perform laboratory analysis as required.
Per Sq.Ft. $
PARTS ONE AND TWO COMBINED - PROJECT BID TOTAL, INCLUSIVE, THE AMOUNT OF: $
- Re-use (placement and compaction) of lower level impacted soil with concentrations of constituents below applicable cleanup standards (overburden) for on-site backfill;
- Placement and compaction of demolition Concrete; concrete generated through the demolition of the existing concrete slab proposed for used as structural fill;
- As shoring and/or slope back of excavation is to be proposed by the bidder, this task should include additional costs for backfill material. If additional backfill material(s) is required based on the method of shoring proposed by the bidder, the additional quantities and types of fill materials should be noted, and included in this lump sum. The additional quantities of any such materials should be clearly stated as an
(Write out or Type in the Amount Here:)
(Write out or Type in the Amount Here:)
- Transportation and disposal of non-hazardous petroleum contaminated soil to an approved Subtitle D facility;
base bid at 529 tons.
- Provide, place, and compact off-site import clean fill (volume to be determined by bidder based on approach for excavation);
BID PRICE CERTIFICATION
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within one hundred and twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
TOTAL BID PRICE: ______________________________________________________________
TOTAL BID PRICE IN WORDS: _____________________________________________________
COMPANY: ___________________________________________________________________
ADDRESS: ____________________________________________________________________
AUTHORIZED SIGNATURE: _______________________________________________________
EMAIL ADDRESS: _______________________________________________________________
PRINT / TYPE NAME: ____________________________________________________________
THE TIME OF COMPLETION FOR THE PROJECT IS __________ CALENDAR DAYS FROM THE DATE OF THE
“NOTICE TO PROCEED.”
EVERIFY AFFIDAVIT
CONTRACTOR AFFIDAVIT UNDER O.C.G.A. § 13-10-91(b)(1)
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. §
13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of the City of Sandy Springs has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by
O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on __________________ in ___________ (city), __________ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ________________
NOTARY PUBLIC
My Commission Expires: ______________________
625 Holcomb Bridge Road, Norcross, GA 30071 • 770-209-0029 • unitedconsulting.com
REQUEST
FOR BID
PART 2 of 2 Soil Remediation Bid Package Sandy Springs Veterans Park Interim Phase 2 Improvements 280 Mr. Vernon Highway Sandy Springs, Georgia
Part 2 - Soil Remediation Bid Package Sandy Springs Triangle Tract – Interim Phase 2 Improvements
Sandy Springs, Fulton County, Georgia
17-GA-01167-08
January 28, 2022
RE: Part 2 of 2 - Soil Remediation Bid Package Sandy Springs Triangle Tract – Interim Phase 2 Improvements Roswell Road, Johnson Ferry Road and Mt. Vernon Highway Sandy Springs, Fulton County, Georgia Project No.: 17-GA-01167-08
Dear BIDDER:
Please find the attached Soil Remediation Bid Package for the remediation that will be conducted at the Proposed Sandy Springs Veterans Park located at 280 Mount Vernon Highway, Sandy Springs, Fulton County, Georgia. This property has been entered into the Georgia Environmental Protection Division (EPD) Brownfields Program, and the soil remediation is being conducted in accordance with the regulatory requirements of this program. Firms selected to bid this project are required to have experience in similar projects that involve demolition, earthwork, and soil remediation. The selected subcontractor will be responsible for all site preparation, required demolition in the area of remediation, excavation, off-site soil transportation and disposal, backfilling, and site restoration in accordance with the instructions to bidders and associated specifications and attachments in this Request for Bid.
The attached Soil Remediation Bid Package provides details on site preparation, partial demolition, excavation and soil handling, waste disposal and site restoration, including supplemental information for use in preparing your Bid.
All contact should be through the City Purchasing Department – Charise Glass, Sandy Springs Purchasing Manager (purchasing@sandyspringsga.gov).
Sincerely, UNITED CONSULTING
Spencer C. Cox Russell C. Griebel, P.G.
Project Environmental Specialist Executive Vice President/Chief Consultant
SCC/RCG/sc SharePoint: 01167-08/BidPackage
Sandy Springs Triangle Tract – Interim Phase 2 Improvements Sandy Springs, Fulton County, Georgia
TABLE OF CONTENTS
INSTRUCTIONS TO BIDDERS
1.0 GENERAL
2.0 DEFINITIONS
3.0 SCOPE OF WORK
Attachments Attachment 1: Figures
Figure 1 – Site Location Map Figure 2 – Existing Conditions View of Property Figure 3 – Sample Location Plan (Site Wide) Figure 4 – Estimated Limits of Soil Remediation Figure 5 – Cross Section A-A’ and B-B’ (at Remedial Area 1)
Attachment 2: Tables
Table 1 – Total Estimated Excavation Volumes (Disposal and Handling) Table 2 – Summary of Pre-Excavation Site Characterization Sampling Results
Attachment 3: Soil and Groundwater Management Plan dated January 12, 2022 with PPCAP Amendment
No. 10 dated May 1, 2017, and PPCAP Amendment No. 12 dated December 21, 2020
Sandy Springs, Fulton County, Georgia
INSTRUCTIONS TO BIDDERS
PROJECT: Remediation Activities – Interim Phase 2 Improvements 280 Mount Vernon Highway, Sandy Springs, Fulton County, Georgia
1.0 GENERAL
A. The project consists of providing all labor, equipment, materials, incidental work and construction methods necessary to complete the soil remediation activities as presented in the Soil and Groundwater Management Plan dated January 12, 2022, Prospective Purchaser Corrective Action Plan (PPCAP) Amendment No. 10 submitted to the Georgia Environmental Protection Division (EPD) on May 1, 2017, and the PPCAP Amendment No. 12 submitted December 21, 2020, prepared for the Sandy Springs Triangle Tract property. A copy of these reports are included as part of this bid package as documented in Section 1.1 below. These documents must be thoroughly reviewed and understood prior to a response to this bid package. Responding bids must include the total fee for meeting the requirements of these documents.
B. An estimated in place total of approximately 352 cubic yards (c.y.) (an estimated 529 tons using an estimated conversion factor of 1.5/c.y.) of impacted soil is required to be disposed of at an approved Subtitle D facility. This assumes an excavation with vertical walls, and does not include clean overburden soils or soils removed for sloping/benching requirements, if sloping/benching is the method proposed by the bidder. The soils are to be generated from one area of the Site. This area, referenced herein as Remedial Area 1, is shown on the figures provided in this Bid Package.
Laboratory analysis of soil samples collected from the Site have reported detectable concentrations of Resource Conservation and Recovery Act (RCRA) 8 metals, volatile organic compounds (VOCs), and semi-volatile organic compounds (SVOCs). The soil remediation activities at the Site are primarily driven by concentrations of benzene, toluene, ethylbenzene, and xylenes (BTEX) that exceed the derived residential Risk Reduction Standards (RRS), as described in PPCAP Amendment No. 12.
The following VOCs have been detected in soil to be removed at concentrations above applicable cleanup standards. These VOC concentrations in the soil to be removed for offsite disposal have ranged as follows:
o Benzene, Below Detection Limits (BDL) to 84 milligrams/kilogram (mg/Kg) o Toluene, BDL to 760 mg/Kg o Ethylbenzene, BDL to 210 mg/Kg o Xylenes, BDL to 1,260 mg/Kg
Note, other regulated constituents have also been detected in soil below applicable cleanup standards. In addition, these BTEX constituents are present in on-site groundwater.
Based on these results, the soils to be excavated are impacted with petroleum related constituents and additional characterization (to support landfill approval) is not anticipated unless the receiving landfill requires additional testing. Previous site characterization testing in the direct
Sandy Springs, Fulton County, Georgia area of remediation has not identified lead above background levels ranging from 7.89 to 27.4 mg/Kg which is below residential RRS.
Note, the constituents above are the only constituents that have been identified above EPD approved residential soil RRS/cleanup standards for the Site based on data acquired up to the date of issuance of this Instructions to Bidders. Other constituents have been identified during investigations of soil and groundwater conducted by United Consulting, as noted in the PPCAP, as amended.
Based on the delineation data obtained to date, overburden has been documented through sampling to be in compliance with residential RRS based on the future redevelopment use of the Site (this material is herein referenced as clean overburden). As illustrated on Figure 5, the vertical limits of the clean overburden is varied and ranges from approximately 3-4 feet bgs to 12-13 feet along the A-A’ (north-south) cross-section and from 3-4 feet bgs to 12-13 feet bgs along the B-B’ (east-west) cross-section. This overburden is likely associated with backfill from the former UST systems. This overburden, with samples with impact concentrations below RRS, barring no unforeseen conditions, can be excavated, stockpiled, and then preferentially re-used within the remedial area for backfill (provided it is geotechnically suitable) following the remediation activities.
As presented on Figures 4 and 5, the limits for the required remediation is estimated at various respective cardinal directions per depth zone based on the delineation sampling to date.
Additional sampling will be required in some directions at the time of remediation to establish the final limits. Below is a summary based on each sampling zone as shown on Figure 4:
a. Overburden Soils: Soils documented to be lower level impacted soils below residential soil RRS/clean-up standards that have been identified from depths up to 4 feet as shown.
These soils should be excavated and segregated for evaluation as future structural backfill under the direction of a Geotechnical Engineer.
b. Shallow Excavation (4-9 feet): Soil delineation identified defined excavation extents to the east, west, and south. Additional soil confirmatory soil sampling is required north between TMW-24-2N and TMW-27 at this depth zone.
c. Intermediate Excavation (9-13 feet): Soil delineation identified excavation extents to the east, west, and south. Additional soil confirmatory soil sampling is required north between TMW-24-2N and TMW-27. Of note, TMW-27 is identified as a clean confirmatory sample point for this depth interval.
d. Deep Excavation (13 feet to water table): Soil delineation identified a defined extent of excavation to the west at TMW-24-2W. Boundaries to the north, east, and south are estimated half the distance between the furthest delineation sample and the outmost temporary monitoring well with a soil sample below residential soil RRS. Additional soil confirmatory soil sampling is required north, east, and south.
e. Water Table: The vertical limit for soil remediation is the top of the groundwater table. In August 2020, the approximate groundwater depth in this area was 22 feet (with a corresponding elevation of approximately 1068 feet above mean sea level (msl)). The
Sandy Springs, Fulton County, Georgia depth of the groundwater in this area will be measured at existing monitoring wells in the area prior to the onset of the removal activities. As the monitoring wells exist, additional depth to groundwater gauging can be conducted during the pre-bid meeting. These measured depths will set the total depth for the soil remedial effort. Once those measurements are recorded, the monitoring wells require abandonment by the Environmental Consultant prior to remediation activities that may disturb them.
C. The selected Contractor shall be responsible for Site preparation, excavation, treatment (if necessary), soil disposal, backfilling, and Site restoration.
D. The work will be conducted under the provisions of a Contract executed between the selected
Contractor and the Owner.
E. The Bidder’s bid shall be based on the Scope of Work (SOW) discussed herein and as described in the documents described in Section 1.1 below.
F. The bidder must provide a detailed approach to the executing the work and sequence of events to complete the work in the form of a Gant Chart. The bid will not be considered complete for evaluation without these items.
G. The Bidder must provide the cost requested on the Bid Form for each Bid Item. The bid will not be considered complete for evaluation without this item.
H. By accepting this Request for Bid, the Bidder hereby acknowledges and agrees to maintain the contract documents in a confidential manner in accordance with the terms of the contract documents.
1.1 PROJECT DOCUMENTS
A. Instructions to Bidders
B. Bid Form – Part 2 of 2
C. Attachment 1: Figures Combined
Figure 1 – Site Location Map Figure 2 – Existing Conditions View of Property Figure 3 – Sample Location Plan (Site Wide)
A. Attachment 2: Tables
Table 1 – Total Estimated Excavation Volumes (Disposal and Handling) Table 2 – Summary of Pre-Excavation Site Characterization Sampling Results
Sandy Springs, Fulton County, Georgia
F. Attachment 3: Soil and Groundwater Management Plan dated January 12, 2022 with PPCAP Amendment No. 10 dated May 1, 2017, and PPCAP Amendment No. 12 dated December 21,
1.2 BID SUBMITTALS
A. Bidder shall provide with its Bid the proposed off-Site disposal and recycling facilities to be used for disposal of excavated soils and decontamination water, demolition debris, and any other materials requiring disposal in connection with the work, along with any characterization and disposal profile requirements of those facilities. Such facilities are subject to the approval of the Environmental Consultant and Owner, and may not be changed without the written consent of the Environmental Consultant. Environmental Consultant will obtain and provide the Contractor with the information required by the disposal facility for acceptance.
B. Bidder shall provide with its Bid a construction schedule, including but not limited to proposed sequencing of demolition, excavation and associated preparation activities, stockpiling, transportation and backfilling activities.
C. Bidder shall provide the necessary written documentation that all Contractor personnel assigned to or entering the Site for the purpose of performing or supervising work, for health, safety, security, or administrative purposes, for maintenance, or for any other Site-related function, have received the appropriate hazardous waste operations safety training in accordance with OSHA 29 CFR 1910.120, and any other training required by Federal, State or local laws and regulations.
2.0 DEFINITIONS
A. Bidder: A respondent to this Request for Bid.
B. Owner: City of Sandy Springs, 1 Galambos Way, Sandy Springs, Georgia 30328
C. Owner’s lead Design Consultant: Barge Design Solutions, Inc., Overlook II, 2839 Paces Ferry Road, SE, Suite 850, Atlanta, Georgia 30339.
D. Contractor: The winning Bidder. The Contractor(s) shall be responsible for all labor, equipment, materials and ancillary items required to perform the work as outlined in this Instructions to Bidders. Contractor will be fully responsible for any and all health and safety provisions required to perform the work in accordance with the project documents described in Section 1.1 and all local, state, and federal regulations, and will have a Competent Person on Site during all work activities.
E. Environmental Consultant (Consultant): United Consulting. The Consultant will be responsible for observing and monitoring the activities of the Contractor, and for direct communications with the Owner, their General Contractor, and the relevant regulatory agencies.
F. EPD Brownfields Unit (EPD): Georgia Environmental Protection Division Brownfields Unit, Floyd Towers East, Suite 1054, 2 Martin Luther King, Jr. Drive SE, Atlanta, Georgia 30334.
Sandy Springs, Fulton County, Georgia
3.0 SCOPE OF WORK
A. All work related to the Site preparation, partial demolition, soil excavation and off-site disposal of soil and other debris, backfilling of the excavation, Site restoration, as well as other general requirements that are identified in the project documents, will be hereafter known as the Scope of Work (SOW). The Contractor’s bid shall be based on the SOW described in the project documents, without modifications, exclusions or additions. Significant exceptions to the provisions of the proposed SOW may cause rejection of the bid. The Bidder is required to provide their own detailed approach to the SOW task presented herein. Excavation methods must be conducted in a manner that:
Minimizes the generation of lower level impacted soils;
Minimizes the area for partial demolition;
Completes the removal of soils that exceed residential soil RRS/cleanup standards; and Meets all the requirements stated in this Bid Package and its attachments.
B. The selected Bidder shall be prepared to execute a contract within five (5) calendar days of Notice of Award or as otherwise directed by the Environmental Consultant.
C. The Bidder shall designate one primary and one secondary contact person to receive all communications from the Design Consultant during the bid process.
3.1 WORK COVERED BY SCOPE OF WORK
A. Scope of Work
The bid Package includes work associated with the contract for the activities listed below:
Planning and Coordination;
Mobilization, Demobilization and Site Preparation;
Partial Demolition;
Excavation and Soil Handling;
Erosion Control;
Waste Profiling, Manifesting, Transportation and Disposal; and, Backfilling and Site Restoration
B. Base Bid Items
This is a performance-based contract with bid items on a lump sum basis tied to the estimated quantities provided. If the Bidder’s approach to the SOW should determine different quantities of materials than estimated in this Bid Package, the Bidder should identify the new estimated quantities, the difference in the quantities from the quantities presented herein, and a statement on why the quantities differ. Unit pricing for all materials transported and disposed of offsite should be provided by Bidders for Environmental Consultant and Owner review at the time of bid submission. Contractor is to ensure manifests and truck tickets are properly captured to verify the actual haul-off quantities for all disposed materials. All lump sum and unit price items shall be
Sandy Springs, Fulton County, Georgia verified by the Environmental Consultant prior to payment. Contractor to ask questions during the bid process if unsure of all items to include in the base bid.
Summary descriptions of the work for each of the bid items are given below, in the order in which they appear on the Bid Form; the bid item numbers shown correspond to those on the Bid Form.
The Bidder should refer to the accompanying bid documents as presented in Section 1.1 of this document.
Each bid item shall include all associated labor, equipment, materials, supervision, health and safety monitoring and PPE, supplies, tools, and other incidentals to fully complete the work described by the item and as detailed in the project documents. Other tasks required during the course of work, whether shown or implied in the project documents but not listed on the Bid Form, shall be considered incidental and shall be included in the scope of work for each bid item.
Accordingly, contract change orders will not be accepted by Owner, unless a changed condition is identified by the Contractor and approved by the Owner prior to initiation of the work associated with the changed condition.
Bid Item No. 1 – Planning and Coordination
The selected Contractor shall perform a pre-mobilization Site inspection with the Environmental Consultant. The purpose of this inspection will be to confirm the best areas for stockpiling soil when necessary; staging roll-offs if proposed; truck routes onsite, exiting the property and through the immediate neighborhood; storing equipment; construction of the decontamination pad(s);
installation of temporary facilities and Site controls; identify underground utilities; identify areas that may need brush or vegetation cleared; and to identify health and safety work zones, as proposed by the Bidder in the response to the Bid Package. This meeting will be coordinated by the Owner’s General Contractor and the Environmental Consultant. An overview of the remediation areas is presented on associated Figures in Attachment 1: Figures. All work to be completed as part of the SOW shall be completed within the Site property boundary, other than offsite transportation and disposal.
Contractor shall supply a Site Control Plan within 5 calendar days of the pre-mobilization Site inspection. The Plan shall include staging areas, equipment storage areas, truck routes onsite and offsite, decontamination pad location, temporary facilities, exclusion zones, employee parking, traffic control, and work zone access limits. This plan needs to be approved by the Owner’s General Contractor and the Environmental Consultant prior to implementing the SOW.
Contractor shall be responsible for procuring all required local, state, and federal permits, including but not limited to contacting Georgia 811 within the required timeframe for utility clearance prior to the start of excavation. No Historical Site utility drawings are available for the property. Contractor is solely responsible for confirming the presence or absence of subsurface utilities within the work areas, and resolving any conflicts that may interfere with the needed remedial actions.
Sandy Springs, Fulton County, Georgia
Contractor shall provide a Health and Safety Plan (HASP) for the SOW at least 5 calendar days prior to mobilization for the Environmental Consultant’s review and comment. All workers will follow all applicable local, state, and federal regulations regarding work activities, including but not limited to Occupational Safety and Health Administration (OSHA) Standards and Regulations, air monitoring requirements, respiratory standards, personal protective equipment requirements, etc. Site control will be the responsibility of the Contractor in accordance with its approved HASP.
Bid Item No. 2 –Site Preparation and Demolition
Contractor shall furnish all labor, equipment and materials, and perform all operations, installation, preparation and maintenance to begin and complete work in accordance with the project documents, schedule, and SOW. This bid item includes costs to mobilize all the necessary equipment to the Site to perform the SOW, materials needed for implementation of the HASP, water required for dust suppression and decontamination activities, water tanks, temporary toilet facilities (no active facilities are on Site), dumpster, generator (if required), hand tools, connections to electric and water service, etc. No water or power is currently available on the property, and is the sole responsibility and expense of the Contractor where required to execute the scope of work.
Site preparation includes the setup of traffic controls, set up and removal of decontamination facilities, placement of crushed stone or sand-gravel fill in the work area as needed to allow for truck traffic through the property to and from remediation areas, and installation of erosion and sediment controls, as necessary, to complete the SOW. Contractor shall set up appropriate Site traffic control barriers (e.g. steel construction fence, jersey barriers, snow fence, signage, cones, etc.) to direct traffic flow in and around work areas and prevent unauthorized vehicles and personnel from entering the work zone, as needed. Contractor shall maintain decontamination facilities and truck access roadways for the duration of the project at no additional cost.
The Contractor shall set up a decontamination area large enough for the decontamination of heavy equipment, machinery, tools, and personnel prior to the start of work and shall maintain this area for the duration of the work, including providing all required decontamination products and remove all items once all Work is complete. Contractor shall provide water as required for decontamination activities. The decontamination area shall be constructed such that it collects and contains all wastewater, sludge, mud, and sediment generated during decontamination activities. Waste generated during decontamination of equipment will be contained within the decontamination area and transferred to a storage container(s) for proper off-Site disposal.
Contractor shall provide, maintain, install and remove erosion and sedimentation control measures, as needed, for the duration of the Work at the Project. All erosion and sediment controls shall comply with standards and specifications set forth in the most recent edition of the Georgia Erosion and Sedimentation Control Manual. Contractor shall determine the erosion and sedimentation control measures necessary for the SOW and for regulatory compliance, and present them in the bid response. The Contractor shall determine, provide and install erosion and sedimentation control measures based on the recommended measures in their bid response.
These measures should include but not be limited to erosion and sedimentation silt fencing and/or hay bales around remediation areas, soil and debris stockpile areas, and other areas disturbed by the Contractor as part of executing this SOW, where appropriate based on encountered site
Sandy Springs, Fulton County, Georgia conditions and precipitation encountered or anticipated during the execution of this SOW. The Environmental Consultant shall review the measures included in the bid response and provide comments for consideration. The Contractor will be responsible for regulatory compliance.
Contractor shall remove all equipment and construction debris from the site upon final demobilization. In addition, Contractor must remove the decontamination pad, all decontamination fluids and solids, and all generated waste materials. The Environmental Consultant will collect and analyze samples of the decontamination waste, as requested by the Contractor/Contractor’s disposal facility. Contractor must maintain erosion and sedimentation controls until permanent vegetation has been established (greater than 70 percent ground coverage), as approved by the Design Consultant.
Limited demolition may be required to allow for access and a safe working area(s) to accomplish the soil remediation as outlined in this Bid Package.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| 22-041 RESPONSE FORM | — | |
| Award Information | — | |
| 22-041 COPY PAPER BID | — | |
| Award Information | — | |
| Award Information | — | |
| Plans | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .