ITB_32801-13898_-_Amendment_1.pdf
PDF 245 KB Posted
- Attached to
- TWRA Flintville Hatchery Pipe Repair-UPDATED
- Solicitation number
- Event 32801-13898
- Issued by
- Lawrence County, Tennessee
About this file
This is Amendment #1 to ITB #32801-13898, issued by the Tennessee Department of Wildlife Resource Agency (TWRA) on May 12, 2026, for the Flintville Hatchery Pipe Repair project. The amendment provides official responses to 20 bidder questions and clarifications, confirms that revised bids may be submitted based on updated specifications, and references an updated Release #2 version of the ITB with highlighted revisions. The project involves the installation of 1,500 feet of 12-inch SDR 35 pipe supplied by TWRA, including excavation, grading, pipe installation with stone encasement, pressure testing, road crossing repairs with concrete pavement, construction of an 80-foot exposed suspended pipe section over a creek, and grass restoration. All work must be completed by July 31, 2026, with construction limited to June and July 2026. The mandatory site visit occurred on April 28, 2026, at 10:00 AM Central Time, and the original bid submission deadline was May 8, 2026, at 2:00 p.m. CDT through the State of Tennessee's EDISON Supplier Portal. The amendment effective date is upon release, and all other terms and conditions of the original ITB remain in full force and effect.
Key clarifications provided in the amendment include: a project budget estimate of $129,500.00 (with an engineer's estimate range of $127,500.00 to $135,000.00), confirmation that no union labor requirements, bid bond, or liquidated damages apply to the contract, and approval for contractor tree removal to access the work area. The amendment confirms that no fiberglass grating is required, updates shop drawing requirements to focus on product data for materials such as ductile iron pipe and concrete ready mix, provides references to appendices for pipe support details and joint restraint specifications, and removes the warranty section from the specifications. Questions regarding road closure authority, traffic control requirements, road base thickness, curing duration, and discharge/bypass structure specifications are addressed by reference to updated specification sections. The state will award the contract to the lowest-cost responsive and responsible bidder, with payment contingent upon completion and approval by TWRA's Engineering Division and a minimum one-year standard manufacturer's warranty required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB # 32801-13898 – Amendment # 1 Page 1 of 2
STATE OF TENNESSEE
DEPARTMENT OF TENNESSEE WILDLIFE RESOURCE AGENCY
REQUEST FOR PROPOSALS # 32801-13898
AMENDMENT #1
FOR FLINTVILLE HATCHERY PIPE REPAIR
DATE: May 12, 2026
ITB # 32801-13898 IS AMENDED AS FOLLOWS:
1. State responses to questions and comments below amend and clarify this ITB.
Any restatement of ITB text in the Question/Comments shall NOT be construed as a change in the actual wording of the ITB document.
ITB
SECTION
PAGE
# QUESTION / COMMENT STATE RESPONSE
1. If a bid was submitted prior to receiving responses to questions and comments and updates Specifications, can our bid be revised based on those changes?
Yes, you may submit a revised bid.
2. We were unable to attend the site visit. Were there any changes to the specifications or the expectations set forth by the event details posted online. Would it be better for me to contact the hatchery manager as listed on the specs with this question?
All questions and/or changes resulting from the site visit will be officially answered in this Questions and Comments Amendment. All changes to the Specifications will be highlighted and updated in Edison on the ITB posting.
E.6. 2 3. If the pipe is not the same depth for its entire length, variations would be expected. See updated Specification E.6.
4. Is there a construction cost estimate or budget associated with this project that you can provide?
$129,500.00
5. Could you please share the clear drawing details for Fiberglass Grating?
There should not be any grating.
6. Are there any Union Labor requirements to this contract?
No, there is not a union labor requirement.
7. Is there an engineer's estimate or budget/range for this project? $127,500.00 to 135,000.00
8. Will the list of attendees to the site visit be posted to the web site?
The list of attendees will not be posted to the website, but it will become part of the procurement file, which will be available through a Public Records Request.
9. There does not appear to be any specialty fabricated components for the project. Please clarify the intent of the requirement for shop drawings for the job as noted in Specifications D.5. Is this requirement to submit product data for the ductile iron pipe, See updated Specifications.
See Section F. Special Considerations.
ITB # 32801-13898 – Amendment # 1 Page 2 of 2
ITB
SECTION
PAGE
# QUESTION / COMMENT STATE RESPONSE
concrete ready mix, etc.?
10. Special Considerations F.1.b - what thickness of road base is required?
See updated Specifications Sections E & F.1.
11. Special Considerations F.1.c – what is the duration required for this item? See Specifications F.1.g.
12. Will the contractor be allowed to close the County Road for the duration of the road crossing from the road demolition thru final curing of the new replacement concrete?
See updated Specifications.
See Section F. Special Considerations.
13. What traffic control will be required for the road crossing?
See updated Specifications.
See Section F. Special Considerations.
14. Special Considerations F.2.b – please provide details of the required pipe supports. See Appendix B.
15. Special Considerations F.2.a – does the State want these joints to be restrained with mega-lugs or similar restraining system?
See Appendix B.
16. In regards to line 8 of the project details laid out in the specs: Installation of a discharge, overflow, or bypass structure upstream of the tie-in to the existing metal pipe. This will allow flow to be diverted to the stream if repairs to the line are needed in the future.
Are there any drawings or specific specifications for how this is to be done or what materials are to be used?
See updated Specification E.9.
17. Can we obtain approval for removing trees from that area to access the space needed?
TWRA grants approval to the contractor to remove trees from that area to access the space needed.
18. This SDR -35 pipe was purchased in 2023, it’s been out of the rain, but the seals on the ends of the pipe have been exposed to sunlight. Are they expected to hold responsibility for this pipe?
Specifications, Section G.
“Warranty” has been removed.
19. Is there a Bid Bond? No, there isn’t a Bid Bond.
20. Are there Liquidated Damages? No, there aren’t Liquidated Damages.
2. Delete ITB # 32801-13898, in its entirety, and replace it with ITB # 32801-13898, Release #2.
Revisions of the original ITB document are emphasized within the new release. Any sentence or paragraph containing revised or new text is highlighted.
3. ITB Amendment Effective Date. The revisions set forth herein shall be effective upon release.
All other terms and conditions of this ITB not expressly amended herein shall remain in full force and effect.