ITB 26B-003 ADDENDUM 1.pdf

PDF 224 KB Posted

Attached to
ITB 26B-003 Well Construction and Aquifer Testing in Bay County, Florida
Solicitation number
ITB-16578
Issued by
Gilchrist County, Florida

About this file

This is Addendum 1 to Invitation to Bid (ITB) 26B-003 issued by the Northwest Florida Water Management District for well construction and aquifer testing in Bay County, Florida. The addendum provides clarifications to frequently asked questions regarding the project scope, which includes construction of three monitoring wells (one Floridan aquifer well at 6-inch diameter, one intermediate aquifer well at 4-inch diameter, and one surficial aquifer well at 4-inch diameter) at a site within St. Andrews State Park. The bid submission deadline is September 1, 2026 at 2:00 p.m. Eastern Time. Work is anticipated to commence after October 1, 2026 with mobilization beginning in early November 2026, and the project must be substantially complete by March 1, 2027. The District encourages site visits for bidders to evaluate conditions prior to submission. All bidders must be licensed Florida water well contractors with a minimum of five years' experience and documented completion of at least two screened monitoring wells and three open-hole wells meeting specified depth and diameter requirements within the last five years.

The addendum clarifies several technical and operational requirements for potential bidders. Artesian flow above land surface is not anticipated based on available hydrogeologic data, though contractors must be prepared to manage all borehole conditions. Silt fencing is required along construction easement boundaries adjacent to low-lying areas, and 6- to 8-foot free-standing chain link fencing with signage is needed along active roadway boundaries within the marina parking lot. Monitoring wells are anticipated to be approximately 10 feet apart. An above-ground mud-management system must be used; in-ground mud pits are not permitted. Soil cuttings must be transported off-site and properly disposed of by the contractor, though temporary storage within the construction easement is allowed with periodic hauling anticipated. Drilling fluid discharge is limited to contained above-ground systems with no open discharge outside the construction easement, and once well water is free of excessive turbidity, discharge areas up to 500 feet from the pumping well may be designated, requiring NPDES permit compliance if applicable. The highest capacity pump allowable for the 6-inch Floridan aquifer borehole shall be used for packer testing. The District has not disclosed a project budget and awards will be made to the lowest-total-lump-sum bidder.

View the file

Other files

File Type Posted
ITB 26B-003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT

SOLICITATION ADDENDUM

Northwest Florida Water Management District Attn: Procurement Officer 81 Water Management Drive Havana, FL 33333

Invitation to Bid (ITB) No.: 26B-003

ADDENDUM NUMBER: 1

DATE: August 21, 2026

Project Title: Well Drilling and Aquifer Testing in Bay County, Florida

Deadline for Submission of Bids and the Opening of Sealed Bids is Tuesday, September 1, 2026, 2:00 P.M. ET.

This ADDENDUM NO. 1 is issued for ITB26B-003 Well Construction and Aquifer Testing in Bay County, Florida to provide answers to questions received during the inquiry period.

Attached are the questions and answers.

Question 1. Hi Jessica I am interested in Biding on this project but I am not seeing what kinda wells construction are they wanting to construct I see a few ads for bids so I am not to familiar with the process of how this bidding go

Answer: Potential bid respondents should review the information in the Invitation to Bid (ITB) packet which can be obtained from the District’s website (http://www.nwfwater.com), from the DemandStar website (https:// www.demandstar.com/app/login), or from the State of Florida’s Vendor Information Portal website (http://vendor.myfloridamarketplace.com).

Question 2: The tender documents indicate water level of -15-20 ft below sea level and site elevation approximately 5ft above sea level however the document goes on to discuss methods for controlling artesian flow above land surface. Can you confirm no artesian flow is expected as I would assume to be the case given aquifer and location.

Answer: It is not anticipated that artesian flow above land surface will be encountered during drilling based on available hydrogeologic and water level data, however the drilling contractor should be prepared to manage all types of borehole conditions including artesian flow.

Question 3: What type of fencing will be needed and where?

Answer: It is anticipated that silt fencing will be needed along the boundary between the temporary construction easement and any adjacent low-lying areas that may receive surface runoff. It is anticipated that free-standing chain link fencing (estimated height of 6 to 8 ft) with adequate work zone signage will be needed along the boundary between the temporary construction easement and the active roadway within the marina parking lot. Additional information is provided in Attachment A (technical specifications) of the ITB package.

http://www.nwfwater.com/ https://www.demandstar.com/app/login http://vendor.myfloridamarketplace.com/

ITB26B-003 Well Drilling and Aquifer Testing in Bay County, Florida – Addendum 1

Question 4: How far apart will the monitoring wells be as it may limit the type of drilling equipment used?

Answer: The anticipated approximate locations of the monitoring wells are shown on a site map and illustrated in a photo provided in the technical specifications. The area of the final monitoring easement is limited, and the monitoring wells should be approximately 10 feet apart.

Question 5: Can a shallow excavation be dug to install an in-ground mud circulation pan and is there a place to temporarily store excavated dirt?

Answer: The technical specifications state that an above-ground, mud-management system must be used to circulate drilling fluids and collect soil cuttings. The drilling contractor shall be prepared to drill without the need to excavate a mud-pit or install an in-ground mud pan. Shallow digging may be limited, as needed and approved, to facilitate site prep and equipment setup.

Question 6: Can the soil cuttings be spread or disposed of onsite?

Answer: No, soil cuttings must be transported off site and properly disposed of by the drilling contractor prior to demobilizing. Non-fluid soil cuttings may be temporarily stored within the construction easement during drilling activities. However, the area within the construction easement is limited, so it is anticipated that temporarily stockpiled or containerized cuttings will need to be periodically hauled off site throughout the project.

Question 7: Is there a place to discharge water during drilling, development and testing?

Answer: Mud and cutting ladened drilling fluid must be contained within an above-ground mud-management system with limited ground discharge within the construction easement area. No open discharge of muddy or excessively turbid water is allowed outside of the construction easement. Silt fencing shall intercept turbid surface water run off before entering adjacent depressions. Once pumped well water is free of excessive turbidity as determined by the District or onsite geologist, an area outside the construction easement where water from development and testing can be discharged will be identified. Per the technical specification, this area may be up to 500 feet from the pumping well and the drilling contractor shall be responsible for obtaining and complying with a NPDES permit, if required.

Question 8: What size pump will be needed for packer testing?

Answer: The borehole of the Floridan aquifer monitoring well will be a nominal six (6) inches. It is anticipated that the highest capacity pump allowable for that diameter shall be used.

Question 9: When do you plan to issue the notice to proceed (NTP)? Is this date flexible?

Answer: The project has been scheduled to start and finish during the park’s off-season when attendance is lower (typically fall and winter). It is anticipated that NTP will be given after October 1, 2026, and mobilization and site prep will begin in early November 2026, if not sooner. It is understood that a delay in starting may occur due to contractor availability. However, the project which is anticipated to take 2 – 3 months must be substantially complete, if not completed, by March 1, 2027.

ITB26B-003 Well Drilling and Aquifer Testing in Bay County, Florida – Addendum 1

Question 10: Do you have a cost estimate for the project, or can you disclose the project budget?

Answer: No, the District does not have a project budget based on current costs for the requested services.