ITB 2607 Street Sweeping And Debris Removal Services.pdf
PDF 3 MB Posted
- Attached to
- Street Sweeping and Debris Removal Services
- Solicitation number
- 26-07
- Issued by
- Barrow County, Georgia
About this file
This is an Invitation to Bid (ITB 26-07) issued by the City of Dunwoody, Georgia for street sweeping and debris removal services for the Department of Public Works Stormwater Division. The City seeks qualified contractors to provide regular street sweeping and debris removal on approximately 107.5 curb miles of designated city streets. Services are to commence no later than November 1, 2026, and continue on a monthly schedule throughout each calendar year. The contract term is two years through December 31, 2027, with three optional one-year extensions available, with the final extension ending December 31, 2030. Sealed bids must be received by 2:00 p.m. local time on September 23, 2026, at the City of Dunwoody, 4800 Ashford Dunwoody Road, Dunwoody, Georgia 30338, with public opening at 2:05 p.m. the same day. Questions must be directed to John Gates, Purchasing Manager, at purchasing@dunwoodyga.gov no later than September 4, 2026. All bids should be submitted in duplicate using the City's bid form.
Bidders must provide firm pricing for the full contract duration with two line items: annual cost to sweep 107.5 curb miles six times per year (with 2026 including only two sweeps due to the November 1 start date) and unit cost for additional curb miles cleaned as needed. The contractor shall provide and locate dumpsters for debris disposal, with all associated costs included in the unit price, and perform all work between 8:00 p.m. and 6:00 a.m. Monday through Friday to minimize traffic disruption. Required insurance includes Workers' Compensation with $1,000,000 limits, Comprehensive General Liability of $1,000,000 per occurrence, Automobile Liability of $500,000, and Umbrella Liability of $1,000,000, with the City named as additional insured. The City reserves the right to reject any or all bids and to determine the lowest reliable bidder based on references and other sources reflecting company reliability. No bid bonds are required for this solicitation. The contract may be terminated for cause with ten days' notice, for convenience with thirty days' notice, or due to lack of funding with written notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 26-07 Brush Pick Up.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
ITB 26-07
STREET SWEEPING AND DEBRIS REMOVAL SERVICES
Invitation to Bid
The City of Dunwoody is soliciting competitive sealed bids from qualified contractors for the Street Sweeping and Debris Removal Services for the Department of Public Works Stormwater Division.
Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the ITB number and company name. Bids will be received until 2:00 P.M. local time on 9/23/2026 at the City of Dunwoody, 4800 Ashford Dunwoody Road, Dunwoody, Georgia 30338. Any bid received after this date and time will not be accepted. Bids will be publicly opened and read at 2:05 P.M. Apparent bid results will be available the following business day on our website www.dunwoodyga.gov.
Questions regarding bids should be directed to John Gates, Purchasing Manager, at purchasing@dunwoodyga.gov no later than 9/04/2026. Bids are legal and binding upon the bidder when submitted. All bids should be submitted in duplicate. The written bid documents supersede any verbal or written prior communications between the parties.
If a contract is awarded, it will be made to the lowest reliable bidder whose proposal shall have met all of the prescribed requirements. The City reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. The City reserves the right to define the "lowest reliable bidder" based on feedback from references or other sources of information that reflect company reliability or suitability. The low bid will be determined based on the sum of the base bid and any alternates selected by the City.
All companies submitting a bid will be notified in writing of award. We look forward to your bid and appreciate your interest in the City of Dunwoody.
John Gates Purchasing Manager
SCOPE OF WORK
The City of Dunwoody is seeking bids for regular street sweeping and debris removal services on designated city streets. The total mileage of each required sweeping and debris removal is approximately 107.5 curb miles (See attached map). Trash and debris shall be swept from the area between the curb and the pavement consisting of the width of the sweeper itself. All debris, trash and litter will be removed for proper disposal in an appropriate landfill designated to receive these items.
Work is expected to begin no later than November 1, 2026 and continue on a monthly schedule as shown in the table below. This contract shall be for a two-year period (through the end of 2027 calendar year) with three optional one-year extensions, with the last possible extension ending on December 31, 2030.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec X X X X X X
General Notes
1. The contractor shall be responsible for providing and locating dumpsters for the disposal of debris, trash, and litter removed by the sweeping activities. The cost of the dumpster and debris removal shall be included in the unit cost per curb mile. No claims will be considered for extra compensation.
2. Work shall be performed so as to minimize traffic disruption. Work will be conducted between the hours of 8
PM and 6 AM, Monday through Friday.
3. Contractor shall have all vehicles marked with their company name.
4. The Contract shall perform project housekeeping/clean-up on a daily basis. A 24-hour contact must be provided to the City of Dunwoody for all issues as needed in regards to the project for any safety, signage, or other emergency as needed.
5. The Contractor shall provide the City via written or verbal notice the scheduled date(s) & time(s) for sweeping to the Public Works Director or designee so that City personnel can perform on-site visits.
6. All completed route sheets and chain of custody (disposal) receipts for pickup or disposal of waste material to the landfill shall be provided to the City for reporting purposes before receipt of payment.
7. All services provided by contractor shall be performed in a workmanlike and professional manner to the satisfaction of the City.
8. Contractor shall adequately protect workers, land owners or tenants, adjacent property, and the public during operations.
Insurance Requirements
Within 10 days of execution of this Agreement, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City covering:
1. Statutory Workers’ Compensation Insurance
(a) Employers Liability:
Bodily Injury by Accident - $1,000,000 each accident
Bodily Injury by Disease - $1,000,000 policy limit Bodily Injury by Disease - $1,000,000 each employee
2. Comprehensive General Liability Insurance
(a) $1,000,000 limit of liability per occurrence for bodily injury and property damage Owner’s and Contractor’s
Protective
(b) Blanket Contractual Liability
(c) I Blanket “X”, “C”, and “U”
(d) Products/Completed Operations Insurance
(e) Broad Form Property Damage
(f) Personal Injury Coverage
3. Automobile Liability
(a) $ 500,000 limit of liability
(b) Comprehensive form covering all owned, non-owned and hired vehicles
4. Umbrella Liability Insurance
(a) $1,000,000 limit of liability
(b) Coverage at least as broad as primary coverage as outlined under Items 1, 2 and 3 above
5. The City of Dunwoody, Georgia, and its subcontractors and affiliated companies, their officers, directors, employees shall be named on the Certificates of Insurance as additional insured and endorsed onto the policies for Comprehensive General Liability, Automobile Liability and Umbrella Liability insurance maintained pursuant to this Contract in connection with liability of the City of Dunwoody and their affiliated companies and their officers, directors and employees arising out of Contractor’s operations. Copies of the endorsements shall be furnished to the City upon execution of this Agreement. Such insurance is primary insurance and shall contain a Severability of Interest clause as respects each insured. Such policies shall be non-cancelable except on thirty (30) days written notice to the City. Any separate insurance maintained in force by the additional insured named above shall not contribute to the insurance extended by Contractor’s insurer(s) under this additional insured provision.
Certificate Holder should read: The City of Dunwoody, 4800 Ashford Dunwoody Road, Dunwoody, Georgia
30338.
(page intentionally left blank)
BID FORM
Company Name: ________________________________________________
*2026 2027 2028 2029 2030
Annual Cost to Sweep 107.5 Curb Miles 6 times ($ per year)
Unit Cost for Additional Curb Miles Cleaned as needed ($ per curb mile)
* Year 2026 will only include 2 times due to contract starting November 1, 2026.
Street Sweeping and Debris Removal Services
The Bid Items provided for in the Bid Schedule are intended to be the only pay items under which the Contractor will be compensated for work described above. The Contractor shall examine the requirements of the work and the pay items in the Bid Schedule and include in the unit prices submitted all labor, equipment, materials, appurtenances, overhead, profit, vehicles, and all other things incidental for the completion of the work as specified.
Work is to commence on or about November 1, 2026. The City of Dunwoody requires pricing to remain firm for the duration of the contract. Failure to hold firm pricing for the term of the contract will be sufficient cause for the City to declare bid non-responsive.
Certification of Non-Collusion in Quote Preparation Signature Date Termination for Cause: The City may terminate this agreement for cause upon ten days prior written notice to the contractor of the contractor’s default in the performance of any term of this agreement. Such termination shall be without prejudice to any of the City’s rights or remedies by law.
Termination for Convenience: The City may terminate this agreement for its convenience at any time upon 30 days written notice to the contractor. In the event of the City’s termination of this agreement for convenience, the contractor will be paid for those services actually performed. Partially completed performance of the agreement will be compensated based upon a signed statement of completion to be submitted by the contractor, which shall itemize each element of performance.
Termination for fund appropriation: The City may unilaterally terminate this Agreement due to a lack of funding at any time by written notice to the Contractor. In the event of the City's termination of this Agreement for fund appropriation, the Contractor will be paid for those services actually performed. Partially completed performance of the Agreement will be compensated based upon a signed statement of completion to be submitted by the Service Provider which shall itemize each element of performance.
Acknowledgement is hereby made of the following Addendum(s) received since issuance of the Contract Documents (identified by number)
Addendum No. Date ___________ ______ ___________ ______
In compliance with the attached specifications, the undersigned offers and agrees, within ninety (90) days of the date of quote opening, to furnish any or all of the items upon which prices are quoted, at the price set opposite each item, delivered to the designated point(s) within the time specified in the quote schedule.
Legal Business Name
Federal Tax ID
Address
Does your company currently have a location within the City of Dunwoody? Yes No
Representative Signature
Printed Name
Telephone Number
Email Address
REFERENCES
List below customers for whom you have provided similar products or services. Please alert your references prior to submitting your bid to encourage prompt responses to the City of Dunwoody.
1. COMPANY NAME: _____________________________________
ADDRESS: _____________________________________
CONTACT PERSON: _____________________________________
PHONE NO.: _____________________________________
E-MAIL: _____________________________________
2. COMPANY NAME: _____________________________________
CONTACT PERSON: _____________________________________
3. COMPANY NAME: _____________________________________
CONTACT PERSON: _____________________________________
SAMPLE
Company Name: __________________________________________________________________
Solicitation No. ______________________
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Dunwoody has registered with and is participating in a federal work authorization program* [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A 13-10-91.
The undersigned further agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to this contract, contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A 13-10-91 on the Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form. Contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the City of Dunwoody at the time the subcontractor(s) is retained to perform such service.
E-Verify * User Identification Number
Company Name
BY: Authorized Officer or Agent Date (Contractor Signature)
Title of Authorized Officer or Agent of Contractor
Printed Name of Authorized Officer or Agent
SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
_______ DAY OF ______________________, 20__
Notary Public
My Commission Expires:
* As of the effective date of O.C.G.A. 13-10-91, the applicable federal work authorization program is “E-Verify” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S. Department of Homeland Security, in conjunction with the Social Security Administration (SSA).
CORPORATE CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the Corporation named as
Contractor in the foregoing bid; that _______________________________________ who signed said bid in behalf of the Contractor, was then (title)_________________________ of said Corporation; that said bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said Corporation is organized under the laws of the State of
This __________________________________ day of __________________, 20______
______________________________________(Seal)
(Signature)
LIST OF SUBCONTRACTORS
I do _________, do not _______, propose to subcontract some of the work on this project. I propose to
Subcontract work to the following subcontractors:
Company Name:___________________________________________________
***ATTENTION***
FAILURE TO RETURN THE FOLLOWING DOCUMENTS MAY RESULT IN
BID BEING DEEMED NON-RESPONSIVE AND AUTOMATIC REJECTION:
1. FAILURE TO USE CITY BID FORM.
2. FAILURE TO RETURN APPLICABLE COMPLIANCE
SHEETS/SPECIFICATION SHEETS INCLUDING CONTRACTOR
AFFIDAVIT AND AGREEMENT, FEDERAL AID
CERTIFICATION, DBE GOALS FORM AND IMMIGRATION
COMPLIANCE ACT AFFIDAVIT.
3. FAILURE TO ACKNOWLEDGE APPLICABLE ADDENDA.
4. FAILURE TO PROVIDE INFORMATION ON ALTERNATES OR
EQUIVALENTS.
5. THE CITY SHALL BE THE SOLE DETERMINANT OF
TECHNICALITY VS. NON-RESPONSIVE BID.
6. FAILURE TO PROVIDE BID BOND, WHEN REQUIRED, WILL
RESULT IN BID BEING DEEMED NON-RESPONSIVE AND
AUTOMATIC REJECTION. BID BONDS ARE NOT REQUIRED
ON ALL BIDS. BOND REQUIREMENTS ARE CLEARLY STATED
ON THE INVITATION TO BID. IF YOU NEED CLARIFICATION,
CONTACT PURCHASING.
CITY OF DUNWOODY
DEPARTMENT OF FINANCE AND ADMINISTRATION – PURCHASING DIVISION
GENERAL INSTRUCTIONS FOR BIDDERS
These Instructions will apply unless a particular item is specifically addressed in the solicitation document or not relevant to the particular type of good or service.
1. PREPARATION OF BIDS:
A. Each bidder shall examine the drawings, specifications, schedule and all instructions. Failure to do so will be at the bidder’s risk, as the bidder will be held accountable for their bid response.
B. Each bidder shall furnish all information required by the bid form or document. Each bidder shall sign the bid and print or type his or her name on the schedule. The person signing the bid must initial erasures or other changes.
An authorized agent of the company must sign bids.
C. Individuals, firms and businesses seeking an award of a City of Dunwoody contract may not initiate or continue any verbal or written communications regarding a solicitation with any City officer, elected official, employee or other City representative without the permission of Purchasing between the date of the issuance of the solicitation and the date of the final contract award. Violations will be reviewed by the Purchasing Manager. If determined that such communication has compromised the competitive process, the offer submitted by the individual, firm or business may be disqualified from consideration for award.
2. DELIVERY:
A. Each bidder should state time of proposed delivery of goods or services.
B. Words such as “immediate,” “as soon as possible,” etc. shall not be used. The known earliest date or the minimum number of calendar days required after receipt of order (delivery A.R.O.) shall be stated (if calendar days are used, include Saturday, Sunday and holidays in the number).
3. EXPLANATION TO BIDDERS:
Any explanation desired by a bidder regarding the meaning or interpretation of the invitation for bids, drawings, specifications, etc. must be requested by the question cutoff deadline stated in the solicitation in order for a reply to reach all bidders before the close of bid. Any information given to a prospective bidder concerning an invitation for bid will be furnished to all prospective bidders as an addendum to the invitation if such information is necessary or if the lack of such information would be prejudicial to uninformed bidders. The written bid documents supersede any verbal or written communications between parties. Receipt of addendum should be acknowledged in the bid.
Although Purchasing will make every effort to send any addendum to known bidders, it is the bidder’s ultimate responsibility to ensure that they have all applicable addenda prior to bid submittal. This may be accomplished via contact with Purchasing prior to bid submittal.
4. SUBMISSION OF BIDS:
A. Bids shall be enclosed in sealed envelopes, addressed to the City of Dunwoody Purchasing Office with the name of the bidder, the date and hour of opening and the invitation to bid number on the face of the envelope.
Telegraphic/faxed bids will not be considered. Any addenda should be enclosed in the sealed envelopes as well.
B. ADD/DEDUCT: Add or deduct amounts indicated on the outside of the envelope are allowed and will be applied to the lump sum amount. Amount shall be clearly stated and should be initialed by an authorized company representative.
C. Samples of items, when required, must be submitted within the time specified and, unless otherwise specified by the City, at no expense to the City. Unless otherwise specified, samples will be returned at the bidder’s request and expense if items are not destroyed by testing.
D. Items offered must meet required specifications and must be of a quality, which will adequately serve the use and purpose for which intended.
E. Full identification of each item bid upon, including brand name, model, catalog number, etc. must be furnished to identify exactly what the bidder is offering. Manufacturer’s literature may be furnished.
F. The bidder must certify that items to be furnished are new and that the quality has not deteriorated so as to impair its usefulness.
G. Unsigned bids will not be considered except in cases where bid is enclosed with other documents, which have been signed. The City will determine this.
H. The City of Dunwoody is exempt from federal excise tax and Georgia sales tax with regard to goods and services purchased directly by the City. Suppliers and contractors are responsible for federal excise tax and sales tax, including taxes for materials incorporated in City construction projects. Suppliers and contractors should contact the State of Georgia Sales Tax Division for additional information.
I. Information submitted by a bidder in the bidding process shall be subject to disclosure after the public opening in accordance with the Georgia Open Records Act. Each page of proprietary information must be identified. Entire bid may not be deemed proprietary.
5. WITHDRAWAL OF BID DUE TO ERRORS:
A. The bidder shall give notice in writing of his claim of right to withdraw his bid without penalty due to an error within two (2) business days after the conclusion of the bid opening procedure. Bids may be withdrawn from consideration if the price was substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of the bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and material used in the preparation of the bid sought to be withdrawn. The bidder’s original work papers shall be the sole acceptable evidence of error and mistake if he elects to withdraw his bid. If a bid is withdrawn under the authority of this provision, the lowest remaining responsive bid shall be deemed to be low bid.
B. No bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor or perform any subcontract or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted.
C. Supplier has up to forty-eight (48) hours to notify Purchasing of an obvious clerical error made in calculation of bid in order to withdraw a bid after bid opening. Withdrawal of bid for this reason must be done in writing within the forty-eight (48) hour period. Suppliers who fail to request withdrawal of bid by the required forty-eight (48) hours shall automatically forfeit bid bond. Bid may not be withdrawn otherwise.
D. Bid withdrawal is not automatically granted and will be allowed solely at the City of Dunwoody’s discretion.
6. TESTING AND INSPECTION:
Since tests may require several days for completion, the City reserves the right to use a portion of any supplies before the results of the tests are determined. Cost of inspections and tests of any item, which fails to meet the specifications, shall be borne by the bidder.
7. F.O.B. POINT:
Unless otherwise stated in the invitation to bid and any resulting contract, or unless qualified by the bidder, items shall be shipped F.O.B. Destination. The seller shall retain title for the risk of transportation, including the filing for loss or damages. The invoice covering the items is not payable until items are delivered and the contract of carriage has been completed. Unless the F.O.B. clause states otherwise, the seller assumes transportation and related charges either by payment or allowance.
8. PATENT INDEMNITY:
The contractor guarantees to hold the City, its agents, officers or employees harmless from liability of any nature or kind for use of any copyrighted or uncopyrighted composition, secret process, patented or unpatented invention, articles or appliances furnished or used in the performance of the contract, for which the contractor is not the patentee, assignee or licensee.
9. BID BONDS AND PAYMENT AND PERFORMANCE BONDS (IF REQUIRED):
A five percent (5%) bid bond, a one hundred percent (100%) performance bond, and a one hundred ten percent (110%) payment bond shall be furnished to the City of Dunwoody for any bid as required in bid package or document. Failure to submit appropriate bonding will result in automatic rejection of bid. Bonding company must be authorized to do business in Georgia by the Georgia Insurance Commission, listed in the Department of the Treasury’s publication of companies holding certificates of authority as acceptable surety on Federal bonds and as acceptable reinsuring companies, and have an A.M. Best rating as stated in the insurance requirement of the solicitation.
10. AWARD:
A. Award will be made to the lowest reliable bidder whose proposal shall have met all the prescribed requirements.
The quality of the articles to be supplied, their conformity with the specifications, their suitability to the requirements of the City, and the delivery terms will be taken into consideration in making the award. The City may make such investigations as it deems necessary to determine the ability of the bidder to perform, and the bidder shall furnish to the City all such information and data for this purpose as the City may request. The City reserves the right to reject any bid if the evidence submitted by, or investigation of such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract.
B. The City reserves the right to reject or accept any or all bids and to waive technicalities, informalities and minor irregularities in bids received.
C. The City reserves the right to make an award as deemed in its best interest, which may include awarding a bid to a single bidder or multiple bidders; or to award the whole bid, only part of the bid, or none of the bid to single or multiple bidders, based on its sole discretion of its best interest.
11. DELIVERY FAILURES:
Failure of a contractor to deliver within the time specified or within reasonable time as interpreted by the Purchasing Manager, or failure to make replacement of rejected articles/services when so requested, immediately or as directed by the Purchasing Manager, shall constitute authority for the Purchasing Manager to purchase in the open market articles/services of comparable grade to replace the articles/services rejected or not delivered. On all such purchases, the contractor shall reimburse the City within a reasonable time specified by the Purchasing Manager for any expense incurred in excess of contract prices, or the City shall have the right to deduct such amount from monies owed the defaulting contractor. Alternatively, the City may penalize the contractor one percent (1%) per day for a period of up to ten (10) days for each day that delivery or replacement is late. Should public necessity demand it, the City reserves the right to use or consume articles delivered which are substandard in quality, subject to an adjustment in price to be determined by the Purchasing Manager.
12. CITY FURNISHED PROPERTY:
No material, labor or facilities will be furnished by the City unless so provided in the invitation to bid.
13. REJECTION AND WITHDRAWAL OF BIDS:
Failure to observe any of the instructions or conditions in this invitation to bid may constitute grounds for rejection of bid.
14. CONTRACT:
A. Each bid is received with the understanding that the acceptance in writing by the City of the offer to furnish any or all of the commodities or services described therein shall constitute a contract between the bidder and the City which shall bind the bidder on his part to furnish and deliver the articles quoted at the prices stated in accordance with the conditions of said accepted bid. The City, on its part, may order from such contractor, except for cause beyond reasonable control, and to pay for, at the agreed prices, all articles specified and delivered.
B. It is understood that the bidder has reviewed the contract documents with the understanding that the City of Dunwoody requires that all agreements between the parties must be entered into via this document. If any exceptions are taken to any part, each must be stated in detail and submitted as part of the bid. If no exceptions are stated, it is assumed that the bidder fully agrees to the provisions contained in the “Sample Contract” in its entirety.
C. When the contractor has performed in accordance with the provisions of this agreement, the City of Dunwoody shall pay to the contractor, within thirty (30) days of receipt of any department approved payment request and based upon work completed or service provided pursuant to the contract, the sum so requested, less the retainage stated in this agreement, if any.
15. NON-COLLUSION:
Bidder declares that the bid is not made in connection with any other bidder submitting a bid for the same commodity or commodities, and that the bid is bona fide and is in all respects fair and without collusion or fraud. An affidavit of non-collusion shall be executed by each bidder. Collusion and fraud in bid preparation shall be reported to the State of Georgia Attorney General and the United States Justice Department.
16. DEFAULT:
The contract may be canceled or annulled by the Purchasing Manager in whole or in part by written notice of default to the contractor upon non-performance or violation of contract terms. An award may be made to the next low responsive and responsible bidder, or articles specified may be purchased on the open market similar to those so terminated. In either event, the defaulting contractor (or his surety) shall be liable to the City for costs to the City in excess of the defaulted contract prices; provided, however, that the contractor shall continue the performance of this contract to the extent not terminated under the provisions of this clause. Failure of the contractor to deliver materials or services within the time stipulated on his bid, unless extended in writing by the Purchasing Manager, shall constitute contract default.
17. TERMINATION FOR CAUSE:
The City may terminate this agreement for cause upon ten days prior written notice to the contractor of the contractor’s default in the performance of any term of this agreement. Such termination shall be without prejudice to any of the City’s rights or remedies by law.
18. TERMINATION FOR CONVENIENCE:
The City may terminate this agreement for its convenience at any time upon 30 days written notice to the contractor.
In the event of the City’s termination of this agreement for convenience, the contractor will be paid for those services actually performed. Partially completed performance of the agreement will be compensated based upon a signed statement of completion to be submitted by the contractor, which shall itemize each element of performance.
19. DISPUTES:
Except as otherwise provided in the contract documents, any dispute concerning a question of fact arising under the contract which is not disposed of shall be decided after a hearing by the Purchasing Manager, who shall reduce his/her decision to writing and mail or otherwise furnish a copy thereof to the contractor. The decision of the Purchasing Manager shall be final and binding; however, the contractor shall have the right to appeal said decision to a court of competent jurisdiction.
20. SUBSTITUTIONS:
Bidders offering and quoting on substitutions or who are deviating from the attached specifications shall list such deviations on a separate sheet to be submitted with their bid. The absence of such a substitution list shall indicate that the bidder has taken no exception to the specifications contained herein.
21. INELIGIBLE BIDDERS:
The City may choose not to accept the bid of a bidder who is in default on the payment of taxes, licenses or other monies due to the City. Failure to respond to three (3) consecutive times for any given commodity/service may result in removal from the supplier list under that commodity/service.
22. BUSINESS LICENSE:
Each successful bidder shall provide evidence of a valid City of Dunwoody business license if the bidder maintains an office within the City of Dunwoody. Unincorporated, out of City, and out of State bidders are required to provide evidence of a certificate to do business in any town, County or municipality in the State of Georgia, or as otherwise required by City ordinance or resolution.
23. ALTERATIONS OF SOLICITATION AND ASSOCIATED DOCUMENTS:
Alterations of City documents are strictly prohibited and will result in automatic disqualification of the firm’s solicitation response. If there are “exceptions” or comments to any of the solicitation requirements or other language, then the firm may make notes to those areas, but may not materially alter any document language.
24. TAX LIABILITY:
Local and state governmental entities must notify contractors of their use tax liability on public works projects. Under Georgia law, private contractors are responsible for paying a use tax equal to the sales tax rate on material and equipment purchased under a governmental exemption that is incorporated into a government construction project:
excluding material and equipment provided for the installation, repair, or expansion of a public water, gas or sewer system when the property is installed for general distribution purposes. To the extent the tangible personal property maintains its character (for example the installation of a kitchen stove), it remains tax-exempt. However, if the installation incorporates the tangible personal property into realty, e.g., the installation of sheetrock, it becomes taxable to the private contractor.
See O.C.G.A. 48-8-3(2) and O.C.G.A. 48-8-63
25. GENERAL CONTRACTORS LICENSE:
All General Contractors must have a current valid license from the State Licensing Board for Residential and General Contractors, unless specifically exempted from holding such license pursuant to Georgia law (O.C.G.A. Section 43-41- 17).
26. INDEMNIFICATION:
To the fullest extent permitted by law, the Contractor shall, at his sole cost and expense, indemnify, defend, satisfy all judgments, and hold harmless the City, the engineer, and their agents and employees from and against all claims, damages, actions, judgments, costs, penalties, liabilities, losses and expenses, including, but not limited to, attorney's fees arising out of or resulting from the performance of the work, provided that any such claim, damage, action, judgment, cost, penalty, liability, loss or expense (1) is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting therefrom, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless whether such claim is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge or otherwise reduce any of the rights or obligations of indemnity which would otherwise exist as to any party or person described in this agreement. In any and all claims against the City, the engineer, or any of their agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation contained herein shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under Worker's Compensation Acts, disability benefit acts, or other employee benefit acts.
27. ENVIRONMENTAL SUSTAINABILITY
The City of Dunwoody is committed to environmental sustainability. The City believes we have a unique opportunity to further expand our leadership in the area of environmentally preferable purchasing, and through our actions, elicit changes in the marketplace. By further incorporating environmental considerations into public purchasing, the City of Dunwoody will positively impact human health and the environment, remove unnecessary hazards from its operations, reduce costs and liabilities, and improve the environmental quality of the region. As such the City encourages the incorporation of environmental sustainability into proposals.
DIRECTIONS TO DUNWOODY CITY HALL
From I-285 take Exit 29 (Ashford-Dunwoody Rd.) and turn North. At fourth traffic light, turn right onto Perimeter Center East. The entrance to the parking lot for 4800 Ashford Dunwoody Road will be on the right. The City of Dunwoody offices are on the second floor.
APPENDIX A
SAMPLE CONTRACT AND GENERAL CONDITIONS
DO NOT SIGN CONTRACT. DO NOT SUBMIT WITH BID.
CONTRACT
This CONTRACT made and entered into this day of , 20 by and between Dunwoody, Georgia (Party of the First Part, hereinafter called the City), and , (Party of the Second Part, hereinafter called the Contractor).
WITNESSETH: That the said Contractor has agreed, and by these presents does agree with the said City, for the consideration herein mentioned and under the provision of the Performance Bond and Payment Bond required by the Specifications to furnish all equipment, tools, materials, skill and labor of every description necessary to carry out and complete in a good, firm and substantial and workmanlike manner, the work specified, in strict conformity with the drawings and specifications, together with the foregoing proposal made by the Contractor, the Advertisement, the Instructions to Bidders, General Conditions, and this Contract, shall all form essential parts to this Contract. The work covered by this Contract includes all work shown on plans and specifications and listed in the conditions and specifications to wit:
(Description)
The Contractor awarded work under this contract shall commence work within ten (10) days after the issuance of the Notice to Proceed and shall fully complete all work hereunder within consecutive calendar days from and after said date.
If said work is not completed within the time stated, the Contractor shall be liable and hereby agrees to pay the City as liquidated damages and not as a penalty, the amount as outlined in Section 108.08 of GDOT’s Standard Specifications as liquidation of the extra expense incurred by the City and liquidated damages to the City.
The City shall pay and the Contractor shall receive the prices stipulated in the proposal hereto attached as full compensation for everything furnished and done by the Contractor under this contract, which shall in no event exceed ($ ) based on the proposal which sum shall be paid in the manner and terms specified in the Contract Documents, but before issuance of certificate of payment, if the Contractor shall not have submitted evidence satisfactory to the City that all payrolls, materials bills, and other indebtedness connected with the work have been paid, the City may withhold, in addition to the retained percentages, such amount or amounts as may be necessary to pay just claims for labor and services rendered and materials in and about the work, and such amount or amounts withheld or retained may be applied by the City to the payment of such just claims.
When the Contractor has performed in accordance with the provisions of this Contract, City shall pay to the Contractor, within thirty (30) days of receipt of any payment request based upon work completed or service provided pursuant to the Contract, the sum so requested, less the retainage stated in this Contract, if any. In the event that the City fails to pay the Contractor within sixty (60) days of receipt of a pay request based upon work completed or service provided pursuant to the Contract, the City shall pay the Contractor interest at the rate of l/2% per month or pro rata fraction thereof, beginning the sixty-first (61st) day following receipt of the pay request. The Contractor's acceptance of progress payments or final payment shall release all claims for interest on said payments.
It is further mutually agreed between the Parties hereto that if, at any time after the execution of the Contract and the Performance Bond for its faithful performance and the Payment Bond, the first party shall deem the surety or sureties upon such bond to be inadequate to cover the performance of the work, the second party shall, at its expense, within five (5) days after the receipt of notice from the first party to do so, furnish an additional bond or bonds in such form and amount, and with such surety or sureties as shall be satisfactory to the first party. In such event, no further payment to the second party shall be deemed to be due under this Contract until such new or additional security for the faithful performance of the work shall be furnished in a manner and form satisfactory to the first party.
The parties agree that each of the provisions included in this Contract is separate, distinct and severable from the other and remaining provisions of this Contract, and that the invalidity of any Contract provision shall not affect the validity of any other provision or provisions of this Contract.
(Signatures Next Page)
IN WITNESS WHEREOF, the parties hereto, acting through their duly authorized agents, have caused this CONTRACT to be signed, sealed and delivered.
CITY OF DUNWOODY, GEORGIA
By:
Lynn Deutsch, Mayor City of Dunwoody, Georgia
ATTEST:
Signature
Print Name
City Clerk/ City of Dunwoody
APPROVED AS TO FORM:
City of Dunwoody Staff Attorney
SERVICE PROVIDER:
BY:
Signature
Title
ATTEST:
Corporate Secretary (Seal)
GENERAL CONDITIONS
These General Conditions will apply unless a particular item is specifically addressed in the solicitation documents
1. SCOPE OF WORK
The Contract will be to provide to the City in accordance with the Contract Documents. All work shall be performed in accordance with the Specifications attached hereto.
2. REGULATIONS
2.1 The Contractor shall comply with all applicable federal, state and local laws, ordinances, rules and regulations pertaining to the performance of the work specified herein.
2.2 The Contractor shall obtain all permits, licenses and certificates, or any such approvals of plans or specifications as may be required by Federal, State and local laws, ordinances, rules and regulations, for the proper execution of the work specified herein.
2.3 During the performance of this Contract, the Contractor shall keep current and, if requested by the City, provide copies of any and all licenses, registrations or permits required by applicable governing agencies. The Contractor shall keep a copy of any and all licenses, registrations and permits on the job site while performing the Contract work.
3. WORK HOURS
3.1 Unless otherwise noted in the General Conditions or Special Provisions, the Contractor shall normally perform on-site work during Standard Work Hours which are between 8:00 a.m. and 5:00 p.m., Monday through Friday, excluding City’s observed holidays. The City may require the Contractor to perform work on the city’s premises during Non-standard Work Hours which are outside the Standard Work Hours. Non-standard Work Hours may be arranged with prior written approval of the City. The Contractor shall advise the City no less than 48 hours in advance of its projected work schedule. The Contractor shall perform no work during City observed holidays without the prior written permission of the City.
3.2 In the event an emergency condition is declared by the City’s Manager or his respective designee, the Contractor will perform work during such hours as requested by the City.
3.3 Work can be performed away from the City’s premises, but in all cases, such work must be maintained and documented on the City’s servers (shared drives accessed via a VPN, etc.)
4. CONTRACTOR’S PERSONNEL
4.1 The Contractor will abide by all State and Federal regulations on wages and hours of an employee dealing with the employment relationship between the Contractor and its subsidiaries or related parties and its employees, including but not limited to the Federal National Labor Relations Act, the Federal Fair Labor Standards Act, the Federal Civil Rights Act of 1964, as amended, and the Americans with Disabilities Act.
4.2 The Contractor shall require all prospective employees to show proof of citizenship, or proof from the United
States Immigration and Naturalization Service of valid entry permits and/or work permits for legal aliens and proof that such legal aliens are eligible to be employed in the United States. This includes any requirement for participation in the DHS e-Verify or SAVE program.
4.3 Should the Contractor engage employees who are illiterate in English, it will be the Contractor's responsibility and obligation to train such employees to be able to identify and understand all signs and notices in and/or around the areas that relate to them or the services being performed by them pursuant to this Contract. In addition, the Contractor will have someone in attendance at all times who can communicate instructions to said employee.
4.4 The Contractor shall maintain a drug-free workplace within the meaning of the Georgia Drug-free Workplace Act.
No employee shall be hired by a Contractor for work on the City’s premises prior to such employee having tested negative for drugs. In addition, existing employees of the Contractor must be subject to drug testing by the Contractor upon reasonable suspicion of drug use. Results of all such drug tests are to be retained by the Contractor.
Copies shall be provided to the City, if requested.
4.5 The Contractor shall transfer promptly from the City any employee or employees that the City advises are not satisfactory, and replace such personnel with employees satisfactory to the City; but in no event shall the City be responsible for monitoring or assessing the suitability of any employee or agent of the Contractor.
4.6 The Contractor’s employees shall be instructed that no gratuities shall be solicited or accepted for any reason whatsoever from the tenants, customers or other persons at the City. The Contractor shall be responsible for ensuring that all articles found by its employees on the City’s premises are turned over to the City or the City’s designated agent in charge of such articles.
4.7 A valid driver license (Commercial Driver License, if applicable) will be required of all personnel operating motor vehicles or motorized equipment on roadways in or around the City.
4.8 While working on city property all Contractors’ employees shall wear (when appropriate) neat-appearing business casual attire or uniforms with the company name and/or logo and footwear of a style that complies with all legal and safety requirements, including and without limitation, the requirements of OSHA.
4.9 Designation of Project Manager - The Contractor shall designate a Project Manager acceptable to the City for all purposes related to this Specification.
4.9.1 The Project Manager shall be fully responsible for the Contractor meeting all of its obligations under this Contract. The Project Manager shall provide the City with an appropriate status report on the progress of the project every week, as well as conduct weekly team status review calls or meeting with the City during the Contract term, the day to be mutually determined as part of the Project Plan.
This report may be delivered by facsimile, e-mail, U.S. postal service, or private carrier, provided it is delivered in a timely manner.
4.9.2 The Project Manager shall be available, as reasonably required, to be on-site during necessary times.
Such times shall be discussed between the Project Manager and the City, but the final required times will be at the City’s discretion.
4.9.3 In the event that the designated Project Manager terminates employment with the Contractor, or is requested by the City to be removed from the role of Project Manager (as provided in Section 4.5), the position shall be assumed by an individual with equivalent qualifications, experience, and knowledge. Such replacement shall require the City’s prior approval.
4.9.4 The Contractor shall not replace the approved Project Manager without written approval of the City, which approval will not be unreasonably withheld.
4.10 The process by which the implementation partner requests the removal of a team member from the project. If a Contractor replaces a proposed team member, the Contractor shall replace that team member with a new team member of similar experience. The City reserves the right to accept or reject any proposed or replacement team member, with or without cause, at any time during the duration of the project.
5. ITEMS PROVIDED BY THE CITY
5.1 Work Location. It shall be the sole responsibility of the Contractor to provide for project team work locations.
5.2 Uninterruptible Power Supply (UPS). It shall be the sole responsibility of the Contractor to provide for project team all necessary UPS.
5.3 Printers. It shall be the sole responsibility of the Contractor to provide for project team all necessary printers.
5.4 Office Space. It shall be the sole responsibility of the Contractor to provide for project team all necessary office space.
5.5 Utility Services. It shall be the sole responsibility of the Contractor to provide for project team all necessary utility services.
5.6 Employee Parking. It shall be the sole responsibility of the Contractor to provide for project team all necessary parking.
6. TOOLS AND EQUIPMENT
It shall be the sole responsibility of the Contractor to provide for project team all tools, parts and equipment necessary to perform work under this Contract.
7. PERFORMANCE REQUIREMENTS
7.1 The Contractor shall perform all of its obligations and functions under the Contract in accordance with the Contract specifications, industry standards and any manufacturers’ specifications. The Contractor shall adjust and coordinate its activities to the needs and requirements of the City and perform its activities so as not to annoy, disturb, endanger, unreasonably interfere with or delay the operations or activities of the City.
7.2 The Contractor’s personnel shall perform work in a neat and professional manner, and in compliance with all
Federal, State, and City of Dunwoody regulations and OSHA rules and regulations shall be followed at all times.
7.3 Dates for commencement and completion of work shall be coordinated with the City’s Authorized Representative.
7.4 Any work required beyond that which is specified herein shall be reported in advance to the City. At no time shall work beyond the scope be performed without prior written authorization from the City.
7.5 The Contractor shall utilize maximum safety precautions. Tools and equipment will be in a good state of repair, safe to use, and be used in the manner in which they were intended. The Contractor is required to inform all workers and concerned persons of the Material Safety Data on all products being utilized on this project. No materials or equipment will be left unattended or stored on the project site at any time.
8. CONFIDENTIAL INFORMATION
8.1 In the course of performing the Contract work, the Contractor may gain access to security-sensitive and other sensitive information of the City.
8.2 The Contractor agrees to hold all City data and information in confidence and to make such information known only to its employees and subcontractors who have a legitimate need to know such information and only after advising such persons of the Contractor’s non-disclosure obligations.
8.3 The Contractor shall seek the City’s prior written consent before using for any purpose other than the fulfillment of the Contractor’s obligations hereunder, or…