ITB 26-032-PW Bid Tab.pdf

PDF 441 KB Posted

Attached to
26-032-PW Myoak Drive and River Road - Water Main
Solicitation number
S-P00140-00016186
Issued by
Lane County, Oregon

About this file

ITB 26-032-PW Bid Tab Summary

This bid tabulation document is associated with an Invitation to Bid (ITB) issued by the Eugene Water & Electric Board (EWEB) in Lane County, Oregon, for the Myoak Drive and River Road Water Main Replacement project. The project scope encompasses the installation of approximately 1,150 linear feet of 8-inch diameter ductile iron pipe water main, five 8-inch diameter gate valves, 400 linear feet of 2-inch diameter HDPE pipe, two fire hydrant assemblies, 26 service connections with associated fittings, sanitary and storm sewer line repairs totaling 130 linear feet, and concrete and asphalt restoration work with erosion control measures. Sealed bids were due by March 17, 2026, with the Notice to Proceed anticipated on April 10, 2026. Substantial completion is required by August 31, 2026, and final completion by September 30, 2026. All prospective bidders must be registered and bonded with the Oregon Construction Contractors Board or Landscape Contractors Board at the time of bid submission and must demonstrate relevant experience through three projects involving ductile iron pipe installation and three projects involving waterline installation in a roadway completed within the past five years.

Bid evaluation prioritizes the lowest responsive and responsible bidder meeting all specifications and requirements. A bid bond of 10 percent of the total bid amount is required for bids exceeding $100,000, with performance and payment bonds required at 100 percent of the contract value upon award. Liquidated damages are assessed at $400 per day for failure to achieve substantial completion by August 31, 2026, and an additional $400 per day for failure to achieve final completion by September 30, 2026. The engineer's estimate for the project is approximately $400,000. The project is subject to Oregon prevailing wage requirements and equal employment opportunity and affirmative action requirements applicable to all public works contracts. EWEB will provide special inspection services including compaction testing and disinfection/water quality testing, while the contractor assumes responsibility for all other testing, construction staking, as-built surveys, erosion and sediment control plan submission, and tracer wire continuity testing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Closing Date: 3/17/26 Closing Time: 2:00 PM PT

DESCRIPTION

Wildish Construction Co. Pacific Excavation Babb Construction Co. JBX LLC

Section 00400 Bid Form Yes Yes Yes Yes

Section 00450 Minimum Qualifications Form Yes Yes Yes Yes

Section 00610 Bid Bond Yes Yes Yes Yes

Section 00430 First Tier Subcontractor Form Yes Yes No Yes

Signed Addenda (or acknowledged on bid form) Yes Yes Yes Yes

Bid Total: $278,536.00 $276,074.20 $354,707.63 $339,314.00

Opened by: Wendy Lopez

Witnessed by: Pam Ward

TAB SHEET

ITB # 26-032-PW

Myoak Dr and River Rd - Water Main Replacement

COMPANY NAMES

Award decisions will not be made at bid opening. The Responsiveness and Responsibility of Bidders and of their proposed subcontractors will be considered in making the award.

Closing Date: 3/17/26 Closing Time: 2:00 PM PT

DESCRIPTION

Greensuns, Inc.

Emery & Sons

Construction Group, LLC H&J Construction, Inc.

Section 00400 Bid Form Yes Yes Yes

Section 00450 Minimum Qualifications Form Yes Yes Yes

Section 00610 Bid Bond Yes Yes Yes

Section 00430 First Tier Subcontractor Form Yes Yes Yes

Signed Addenda (or acknowledged on bid form) Yes Yes Yes

Bid Total: $312,361.00 $421,964.00 $344,946.00

Opened by: Wendy Lopez

Witnessed by: Pam Ward

ITB # 26-032-PW

Myoak Dr and River Rd - Water Main Replacement

COMPANY NAMES

Award decisions will not be made at bid opening. The Responsiveness and Responsibility of Bidders and of their proposed subcontractors will be considered in making the award.