This document is Addenda 2 to Invitation to Bid (ITB) 2526-040 issued by the Agency for Persons with Disabilities (APD) in Florida on November 10, 2026, for refuse removal services at Tacachale, an Intermediate Care Facility for Individuals with Intellectual Disabilities in Gainesville. The solicitation requests provision and maintenance of five 20-cubic-yard open-box containers (three for construction debris and two for metal debris), one 34-cubic-yard self-contained compactor with integrated hopper lift, and thirty-two 4-cubic-yard steel dumpsters capable of daisy-chaining. The compactor must be picked up weekly on standing Wednesdays without notification requirement, or the next business day if Wednesday is a holiday. Open-box containers must be picked up within twenty-four hours of notification. The contractor must provide repair and maintenance services during normal business hours with a two-hour on-site response time for repair requests. All required equipment must be installed and services operational by December 1, 2026. The bid deadline is November 18, 2026, at 10:00 a.m. Eastern Time, with bids submitted in paper format (one original, one copy, and one USB drive) mailed to the agency. A mandatory site visit was held on November 5, 2026, at 10:30 a.m. Eastern Time. The contract term is three years from execution with three optional one-year renewal periods, for a potential six-year maximum duration, with separate pricing required for each renewal year.

Pricing must include line items for landfill charges per ton (estimated 546 tons annually), compactor pickups and cleaning per occurrence (estimated 52 hauls annually), 20-cubic-yard container pickups per occurrence (estimated 36 hauls annually), container delivery fees per container per delivery, container rental fees per container per month, compactor rental per month (12 months), and thirty-two dumpster rental per month for all containers combined (12 months). Respondents may optionally submit pricing for plastic containers with lockable lids as an alternative to steel containers, but optional pricing is not included in bid evaluation. Unit prices must incorporate all costs including labor, materials, equipment, transportation, fuel, and disposal. Landfill charges bill based on actual incurred costs supported by certified monthly landfill invoices and corresponding scale tickets identifying each haul's tonnage and disposal charges. References must reflect work performed directly by the prime respondent, not subcontractors. Refurbished equipment is acceptable if it meets all specifications. Commercial automobile liability insurance must be a minimum of $1,000,000 combined single limit per accident; no performance bond is required. The anticipated agency decision date is November 9, 2026. No set-asides are identified in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE: November 10, 2026

SOLICITATION NUMBER: ITB 2526-040

SOLICITATION TITLE: Tacachale Refuse Removal

ADDENDA NUMBER: 2

This Addenda is issued to provide the Agency's official responses to technical questions received by the established deadline and to incorporate corresponding revisions and clarifications to the solicitation.

Additionally, revisions have been made to Section 7.3, Containers and Equipment; Section 7.4, Collection, Hauling, and Service Requirements; and Section 7.7, Landfill Charges and Documentation. Furthermore, Attachment I – Price Page is hereby deleted in its entirety and replaced with the revised Attachment I – Price Page included with this Addenda. Respondents shall use the revised Attachment I when preparing and submitting their Bids.

All additions and revisions to the ITB are identified by yellow highlighting, while deletions are indicated by strikethrough text.

For purposes of this Addenda, all questions submitted by prospective Respondents are reproduced verbatim as received by the Agency. No corrections have been made to spelling, grammar, punctuation, formatting, or other clerical errors contained in the submitted questions.

The Agency's responses constitute the official clarifications of the solicitation requirements.

Respondents shall rely on these responses and the revisions contained in this Addendum when preparing their Bids.

All other terms and conditions of the ITB, as previously amended, remain unchanged and in full force and effect.

[Remainder of Page Left Blank Intentionally]

Question Number

Solicitation Page Number, Section, and Subsection

Questions Answers

1 Comparable references— Attachment III

May the three required references include comparable projects successfully performed by a proposed subcontractor responsible for hauling, equipment, and maintenance, or must all three references reflect work performed directly by the prime respondent?

All three references must reflect work performed directly by the prime respondent.

2 Container delivery and rental — Attachment I, lines 4–7

Both delivery and rental fees are listed “per delivery,” with quantities “as required.” Please confirm the intended rental billing unit and the quantities bidders should use to calculate annual extended prices.

Should each price apply per container or to the entire group of three construction-debris containers or two metal-debris containers?

The unit pricing for Lines 4–7 applies to each individual container, not the combined group of three construction-debris containers or two metal-debris containers.

Container delivery fees (Lines 4 and 6) shall be priced per container, per delivery. Container rental fees (Lines 5 and 7) shall be priced per container, per month.

Respondents shall calculate annual extended prices by multiplying their unit prices by the estimated annual quantities identified in the revised Attachment I – Price Page, included in Addendum 2.

The estimated annual quantities are provided for bidding and evaluation purposes only and do not guarantee actual usage.

3 Monthly equipment pricing — Attachment I, lines 8 and 10

Should the compactor rental be annualized using 12 months?

For the 32 towable dumpsters, should bidders quote a monthly rate per dumpster and multiply by 32 × 12, or quote one monthly rate for the complete fleet?

Respondents should provide one monthly rental rate for the compactor in Line 8 of Attachment I – Price Page.

Respondents should provide a monthly rental rate for all 32 dumpsters then multiply that rate by 12 months to provide the annual extended price.

4 Disposal charges — Sections 7.2 and 7.7

Please clarify how the per-ton landfill price used for bid evaluation relates to reimbursement of actual landfill charges during performance. Should disposal charges be excluded from the per-occurrence hauling prices to avoid double-counting?

How should disposal costs for construction and metal debris be priced?

Respondents shall provide separate pricing for hauling services and landfill disposal charges as identified in Attachment I – Price Page. Hauling services shall be priced per occurrence, while landfill disposal charges shall be priced per ton. Landfill disposal charges should not be included in the per-occurrence hauling rates to avoid duplication of costs.

In accordance with Section 7.7, landfill charges shall be billed based on actual costs incurred and supported by the landfill's monthly statement or invoice. Each invoice must identify the hauls performed and corresponding weights of the refuse disposed of.

Note: The per-ton bid price is for evaluation purposes and does not override the actual-cost billing requirement.

5 Fuel surcharge — Attachment I, line

What calculation method and assumed quantity should bidders use to include the fuel surcharge in the annual extended price and evaluated grand total?

The fuel surcharge has been removed as a separate line item under Attachment I – Price Page. Respondents shall incorporate all applicable fuel costs into their proposed unit prices. Refer to the revised Attachment I – Price Page included in Addendum 1.

6 Renewal pricing Section 4.1 provides three one-year renewal options, while Attachment I requests a three-year renewal total. Must one set of renewal unit prices remain fixed for all three renewal years?

Are adjustments permitted for documented changes in landfill charges or other operating costs?

The solicitation provides for three (3) separate one-year renewal options. Respondents may propose different unit prices for each renewal year. Prices are not required to remain the same for all three renewal years.

As reflected in the revised Attachment I – Price Page included in Addenda 2, respondents may account for anticipated increases in landfill charges and other operating costs when submitting their unit prices for each renewal year.

7. Mobilization and equipment What is the required timeframe after contract execution for equipment installation and commencement of service?

May bidders provide serviceable refurbished equipment that meets all specifications?

All required equipment must be installed and services must be in place by December 1, 2026.

Yes. Refurbished equipment is acceptable, provided it meets all specifications and requirements outlined in the solicitation.

8. Two-hour response requirements — Sections 7.4 and 7.5

Does the two-hour compactor pickup requirement apply outside normal business hours, including weekends and holidays?

For repair requests, does “respond” require an on-site technician within two hours?

No. The two-hour compactor pickup requirement applies only during normal business hours.

Yes. A technician must be on-site within two hours of receiving a repair request.

9. Commercial automobile insurance

— Section 7.11

Please confirm the minimum required commercial automobile liability limit.

The minimum required commercial automobile liability insurance coverage is $1,000,000 combined single limit per accident for bodily injury and property damage.

10. Site inspection Is an optional site visit available through the Purchasing Contact to verify equipment compatibility, installation conditions, and hauling access before bids are due?

No. The mandatory site visit was held on November 5, 2026, at 10:30 a.m. ET. No additional site visits will be scheduled.

11. I was asked if there is a Bid Bond and if so, what's the percentage?

No. Refer to Section 6.3 of the ITB.

12. Is submission still paper-only (one original, one copy, and one USB, mailed to your attention in Tallahassee), or did Addendum 1 change the format?

Yes. Refer to Section 8.0 Bid Submission, 8.1 Deliver Responses To:, and 8.2 Bid Format Instructions of the ITB.

13. Where do we obtain the replaced Attachment I Price Page?

Refer to Addenda 1.

14. What changed about the site-visit requirement?

The original solicitation did not require a site visit. However, Addenda 1 revised this requirement, making the site visit mandatory.

15. Please confirm the close date of November 18, 2026, and the time.

As specified in Addenda 1, bids are due no later than November 18, 2026, at 10:00 a.m. Eastern Time (ET).

16. Could you also share who was awarded the previous contract for this service and the award amount, if that information is publicly available?

Information regarding the previous contract award, including the awarded vendor and contract amount, may be obtained by submitting a public records request through the Agency’s Clerk.

17. References: Can the three required comparable project references be provided by our proposed operational subcontractor, or must they be exclusively from the Prime Contractor?

Refer to the Answer to Question 1.

18. Mandatory Site Visit: Would an authorized representative of our proposed subcontractor be permitted to attend the November 5 mandatory site visit on behalf of Hyperion Global? If so, is any specific authorization documentation required?

As specified in Addendum 1, vendors were permitted to send an authorized representative to attend the mandatory site visit on their behalf. Refer to Addendum 1 for the applicable site-visit requirements.

19. Insurance Requirements: Could you confirm whether the Prime Contractor and operational subcontractor must each maintain specific insurance coverages or limits beyond those referenced in the APD Purchase Order Terms and Conditions and PUR 1000?

The awarded Contractor shall comply with the insurance requirements specified in Section 7.11 of the ITB, Section 4 of the APD Purchase Order Terms and Conditions, and PUR 1000, as applicable.

The Contractor shall remain responsible for ensuring that any approved subcontractors maintain insurance coverage appropriate to the services they perform and comply with all applicable contractual requirements.

No additional insurance coverage or limits are being established through this clarification.

20. Background Screening: Would Level Two Background Screening apply to subcontractor personnel performing waste collection and equipment maintenance on-site, given that the services do not involve direct personal care?

No

21. Dumpster rental—Line 10: Should the monthly unit price be quoted per dumpster or for all 32 dumpsters combined?

Please confirm the calculation required for the annual extended price.

Refer to the answer to question 3.

The annual extended price should be calculated by multiplying the combined monthly rental price by 12 months.

22. “As required” quantities: What quantities or assumptions should respondents use to calculate annual extended prices for Lines 4–9 and the grand total used for bid evaluation?

Refer to the revised Attachment I – Price Page, which identifies the pricing units and estimated annual quantities for each service.

Respondents shall calculate the annual extended price for each line item by multiplying the unit price by the estimated annual quantity specified. The annual extended prices shall be totaled to determine the annual subtotal for each year and the applicable contract term total.

Estimated quantities are provided for bidding and evaluation purposes only and do not guarantee actual usage.

23. Container rental—Lines 5 and 7: These rental fees use “Per Delivery” as the pricing unit. Please clarify the rental period included in each delivery and whether pricing is per container or for the complete group of three construction-debris containers or two metal-debris containers.

As clarified in the response to Question 2, and reflected in the revised Attachment I – Price Page included in Addenda 2, container rental fees for Lines 5 and 7 are priced per individual container, per month, not per delivery or for the combined group of containers.

For Line 5, respondents shall multiply the monthly rental rate per container by the estimated annual quantity of 36 container-months.

For Line 7, respondents shall multiply the monthly rental rate per container by the estimated annual quantity of 24 container-months.

These quantities are provided for bidding and evaluation purposes only and do not guarantee actual usage.

24. Landfill charges—Line 1 and Section 7.7: Section 7.7 requires billing based on actual landfill charges incurred. Should respondents quote the current disposal rate for evaluation purposes, and how will changes in landfill rates be handled during the initial and renewal terms?

Respondents should provide the current landfill disposal rate per ton for Year 1 and account for any anticipated rate changes in their pricing for each subsequent year of the initial three-year term and the three optional one-year renewal terms, as outlined in the revised Attachment I – Price Page provided in Addenda 2.

For bid submission purposes, respondents should use the estimated annual quantity of 546 tons. As required by Section 7.7, actual landfill charges must be supported by the applicable landfill invoices or statements.

25. Fuel surcharge—Line 9: The revised price-page instructions require unit prices to include fuel, while Line 9 separately provides for a fuel surcharge.

Please clarify how fuel costs should be allocated without duplication and how any surcharge should be calculated for evaluation and invoicing.

Respondents shall include all fuel costs, including anticipated increases, in their proposed unit prices for each year of the initial three-year term and the three optional one-year renewal terms.

As reflected in the revised Attachment I – Price Page included in Addenda 2, the separate fuel surcharge line item has been removed. Separate fuel surcharges will not be permitted, and all fuel costs must be incorporated into the applicable unit prices.

26. Comparable references—Attachment III: May a prime respondent satisfy the comparable-project reference requirement using references for a proposed hauling subcontractor that will perform the relevant services, or must all three references reflect work contracted directly by the prime respondent?

Refer to the answer to question 1.

27. Under Definition L and Section 6.5, may a newly formed prime contractor propose an experienced, appropriately licensed hauling subcontractor for the field services and use that subcontractor's three comparable-project references for Attachment III, while the prime retains contract administration, quality oversight and full contractual responsibility?

If permitted, which service licenses or authorizations must the prime hold itself?

No. Refer to the answer to question 1.

The prime contractor and any proposed subcontractors must possess all applicable licenses and authorizations required by Florida law to perform their respective services. Additionally, both the prime contractor and any proposed subcontractors must meet all applicable requirements for responsiveness, responsibility, and eligibility to conduct business with the State of Florida, as required by the solicitation and applicable law.

28. For Attachment I, what quantities and extension method should bidders use for the "as required" rental/delivery lines and monthly rentals, including whether the 32-container monthly rate is per container or for the full fleet?

Refer to the answers to Questions 2, 3, 21, 22, and 23, and the revised Attachment I – Price Page included in Addenda 2, for clarification regarding the applicable pricing units, estimated annual quantities, and calculation of annual extended prices.

29. How should the landfill unit-price line be reconciled with Section 7.7's requirement to bill actual landfill charges with supporting monthly statements?

Respondents shall provide a unit price per ton for landfill charges as specified in the revised Attachment I – Price Page included in Addendum 2. The estimated annual quantity of 546 tons shall be used to calculate the annual extended price for bid evaluation purposes only.

Pursuant to Section 7.7 of the ITB, landfill charges shall be billed based on the actual charges incurred by the Contractor. Each monthly invoice must include a certified copy of the landfill's monthly statement or invoice and identify all hauls and their corresponding refuse weights.

30. Stated in the ITB, “8.6 Presenting the Bid - The method of binding and cover selection is at the Respondent's discretion;

however, elaborate bindings, hardback notebooks, and similar presentation materials are discouraged.”

In similar situations, proposals are most often submitted in hard cover binders, which allow for organized Tabs to be included. Will ADP accept this method of submittal?

If no and hard cover binders are not acceptable, what is ADP’s approved method of submittal? Soft cover binders? Just a binder clip?

Yes.

N/A

31. Section 4.1 – The initial term is three (3) years with three (3) additional one-year renewals, and Attachment I requires firm unit pricing for a six-year period. Will the Agency add a provision permitting an annual adjustment to the unit rates, and the pass-through of documented increases in disposal and landfill fees, fuel, and costs resulting from changes in federal, state, or local laws, rules, ordinances, or regulations applicable to Contractor's operations or the services?

No. The Agency will not add a provision permitting annual adjustments to the contracted unit prices.

As reflected in the revised Attachment I – Price Page included in Addenda 2, respondents may propose different unit prices for each year of the initial three-year term and each of the three optional one-year renewal terms. Respondents should account for anticipated increases in fuel, disposal costs, operating expenses, and other applicable costs when establishing their proposed unit prices.

Regarding landfill charges and supporting documentation, refer to the answer to question 29.

32. Section 5.8 – Would the Agency limit the documentation requested under this section to only matters related to the Contractors itself, and not its individual employees?

No. The Agency will not limit the documentation requirements to the Respondent only. Pursuant to Section 5.8 of the ITB, the requested documentation applies to the Respondent, its employees, subcontractors, and subcontractor employees.

33. Section 6.13 – This section states that a Performance Bond is not required for this project, while Section 9 of the APD PO Terms and Conditions permits the Agency to require a performance bond, letter of credit, or other security at its sole discretion. Will the Agency conform these provisions and confirm that no bond or other security will be required for this Contract?

No performance bond, letter of credit, or other form of performance security is required for this Contract, as specified in Section 6.13 of the ITB.

Section 9 of the APD Purchase Order Terms and Conditions is a general provision addressing the Agency's authority to require performance security. For this solicitation, Section 6.13 establishes that no performance security is required.

34. Section 6.20 – Contractor appreciates that the indemnification obligation in the second paragraph is limited to the extent caused by Contractor's negligent acts, errors, omissions, recklessness, or intentional wrongful misconduct. The first paragraph, however, imposes responsibility for any loss of or damage to Agency property "caused by" Contractor without regard to fault. Will the Agency conform the first paragraph to the second by adding the words "to the extent caused by the negligence or willful misconduct of the Contractor, its employees, agents, representatives, or subcontractors"? Contractor also requests that the Agency confirm that Section 6.20 controls over the broader indemnification language in Section 6 of the APD PO Terms and Conditions.

The Agency declines the requested revision to Section 6.20 of the ITB. The first paragraph addresses the Contractor's responsibility for damage to Agency property caused by the Contractor, its employees, agents, representatives, or subcontractors. The second paragraph addresses indemnification obligations as specified therein. Both provisions shall remain as written.

Regarding Section 6 of the APD Purchase Order Terms and Conditions, both provisions remain applicable.

35. Section 7.3 – The dumpsters, containers, and compactor furnished by Contractor remain the property of Contractor. Because Tacachale maintenance staff will tow and move the dumpsters/containers throughout the campus, will the Agency add a provision confirming that the Agency has care, custody, and control of the equipment while it is at the facility; that the Agency will not overload (by weight or volume), alter, or use the equipment other than for its proper and intended purpose; and that the Agency is responsible for loss of or damage to the equipment, and for injury to persons, resulting from the acts or omissions of Agency personnel?

The Agency declines the requested addition to Section 7.3 of the ITB. The Contractor shall remain responsible for providing equipment that meets the requirements of the solicitation. The Agency will use the equipment for its intended purpose in accordance with the terms and conditions of the resulting Contract.

36. Section 7.3(c)(iv) – This subsection reserves to Tacachale the right to add or delete compactors and/or dumpsters during the Contract period. Given the capital expenditure associated with this equipment, will the Agency add language requiring that material additions or deletions be mutually agreed and that the unit pricing be adjusted accordingly?

The Agency declines the requested revision to Section 7.3(c)(iv) of the ITB. The Agency reserves the right to add or delete compactors and/or dumpsters during the Contract period, as specified in the solicitation. Any changes to equipment quantities and associated pricing shall be handled in accordance with the terms and conditions of the resulting Contract.

37. Section 7.4(b) – A two (2) hour pick-up window for the compactor following notification is not operationally achievable on a consistent basis. Will the Agency amend this subsection to require pick-up by the end of the next business day following notification, with Contractor using commercially reasonable efforts to respond sooner?

The compactor will be serviced on a regularly scheduled weekly basis, with pickup occurring every Wednesday or the following business day if Wednesday falls on a holiday.

38. Section 7.5 – This section requires repair services to be available twenty-four (24) hours per day, seven (7) days per week, 365 days per year, with a two (2) hour response time and replacement equipment at no charge. Will the Agency amend this section to require response during normal business hours, with a commercially reasonable response time for after-hours emergency calls, and to provide that repairs and replacements necessitated by misuse, 4934-0441-1358, v. 1 overloading, or the negligence of Agency personnel, or by causes beyond Contractor's control, will be performed at the Agency's expense?

The Agency agrees to revise Section 7.5 of the ITB to require repair services during normal business hours rather than twenty-four (24) hours per day, seven (7) days per week, 365 days per year.

The Agency declines the request to assume responsibility for repair or replacement costs resulting from equipment misuse, overloading, negligence of Agency personnel, or circumstances beyond the Contractor's control. All other requirements of Section

7.5 shall remain unchanged.

39. Section 7.6 – Will the Agency clarify the required frequency of container cleaning, as cleaning each container after each dumping is not consistent with industry practice, and confirm that a periodic cleaning schedule to be mutually agreed is acceptable?

The Agency will permit a periodic container cleaning schedule to be mutually agreed upon between the Contractor and Tacachale.

The cleaning schedule must ensure that containers are maintained in a clean and sanitary condition throughout the Contract term.

40. Section 7.7 – Contractor's disposal invoices and landfill rates are confidential and proprietary. Will the Agency accept certified scale tickets or a certified statement of actual tonnage and disposal charges for each haul in lieu of a certified copy of the landfill's monthly invoice to Contractor?

No. The Contractor shall provide both a certified copy of the landfill's monthly statement or invoice and the corresponding certified scale tickets documenting the actual tonnage and disposal charges. Section 7.7(b) of the ITB will be revised accordingly. Refer to Addenda 2 for the revised requirements.

41. Section 7.11 – Please confirm the insurance requirements that apply to this Contract, as Section 7.11 and Section 4 of the APD PO Terms and Conditions (incorporating Section 8.e. of PUR 1000) state the requirements differently. In addition, Contractor requests that the requirement that the Agency be named as a "loss payee" be deleted;

Contractor will name the Agency as an additional insured, as its interest may appear, under its commercial general liability and commercial automobile liability policies.

Further, will the Agency confirm that the liability language contained in this section may be modified to align with the indemnification requirement?

The Contractor shall comply with the insurance requirements specified in Section 7.11 of the ITB and Section 4 of the APD Purchase Order Terms and Conditions, including the applicable provisions of Section 8(e) of PUR 1000.

Section 7.11 requires the Agency to be named as a certificate holder or loss payee, as applicable. The Agency declines the requested modifications to the insurance and liability provisions.

All applicable requirements shall remain as written.

42. Section 7.15 – Will the Agency amend this section to provide Contractor with written notice of the alleged deficiency and a period of not less than ten (10) days to cure before any financial consequence is assessed, and to confirm that financial consequences are the Agency's exclusive remedy for the deficient performance to which they relate?

The Agency declines the requested revisions to Section 7.15 of the ITB.

Section 7.15 already provides the Contractor with written notice of deficiencies and a two-week period to correct them before financial consequences may be assessed. The Agency will retain these provisions as currently written.

43. QUESTIONS TO APD PO TERMS

AND CONDITIONS (EXHIBIT A)

Section 6 – Contractor is willing to provide reasonable indemnification to the Agency, but it should not be required to indemnify the Agency for the Agency's own (i) negligence or willful misconduct, (ii) breach of the Contract, or (iii) violations of law, or for the same acts of unknown third parties. As written, this section extends to "any acts, actions, breaches, neglect or omissions" of Contractor without regard to fault, covers consequential damages, and conflicts with Section 6.20 of the ITB. Please delete this section as written and replace it with the following:

"The Vendor agrees to indemnify, defend, and hold harmless the State of Florida, the Agency, and their officers, employees, and agents (collectively, the "Indemnified Parties") from and against all claims, liabilities, damages, losses, judgments, costs, and expenses, including reasonable attorneys' fees, for bodily injury, sickness, disease, death, or damage to tangible property, to the extent caused by the negligence or willful misconduct of the Vendor, its employees, agents, or subcontractors, in the performance of this Purchase Order. Nothing contained herein shall obligate the Vendor to indemnify, defend, or hold harmless any Indemnified Party to the extent the claims are caused by: (i) the negligence or willful misconduct of any Indemnified Party; (ii) the breach of any term, condition, covenant, representation, or warranty of this Purchase Order by the Agency; or (iii) the violation of any law, rule, regulation, ordinance, order, license, or permit by any Indemnified Party. In no event shall the Vendor be liable for consequential, indirect, special, punitive, or incidental damages, including lost profits. Nothing herein shall be construed as a waiver of any immunity or limitation of liability to which the Agency may be entitled under the doctrine of sovereign immunity or section 768.28, Florida Statutes."

No. The Agency declines the requested revisions to Section 6 of the APD Purchase Order Terms and Conditions (Exhibit A). The indemnification provisions contained in Section 6 of Exhibit A and Section 6.20 of the ITB shall remain applicable. The Agency will retain these provisions as currently written.

44. QUESTIONS TO APD PO TERMS

Section 7 – This section assigns to the Agency all patents, copyrights, and trademarks "arising, developed or created in the course or as a result hereof." These services do not involve the development of intellectual property for the Agency. Will the Agency delete this section, or in the alternative confirm that it does not apply to Contractor's pre-existing or independently developed intellectual property, trade names, trademarks, software, route and operational data, pricing, or other proprietary business information?

No. The Agency declines the requested deletion or modification of Section 7 of the APD Purchase Order Terms and Conditions (Exhibit A). Section 7 applies to intellectual property arising, developed, or created in the course of or as a result of the Contract. The Agency will retain this provision as currently written.

45. QUESTIONS TO APD PO TERMS

Section 8 – This Purchase Order is for refuse collection, hauling, and disposal services and not for direct personal services to clients.

Will the Agency confirm that Level Two background screening under section 393.0655 and Chapter 435, Florida Statutes, is not applicable to this Contract?

If the Agency requires screening of drivers accessing the campus, please confirm the scope and that Contractor may rely on its existing driver qualification and background check program, and please delete the Agency's unilateral right to terminate based on screening results without regard to the nature or age of the matter disclosed.

No. The Agency will retain Section 8 of the APD Purchase Order Terms and Conditions as currently written. Level Two background screening requirements will apply where required by Florida law.

Contractor personnel whose duties are limited to refuse collection, hauling, and disposal and who do not otherwise meet the statutory screening criteria will not be required to undergo Level Two screening solely because they perform these services.

All Contractor personnel must comply with Tacachale's applicable security and facility access requirements. Tacachale reserves the right to modify these requirements as necessary to maintain the safety and security of the facility, its residents, and staff. Any changes to these requirements will be communicated to the Contractor, along with applicable instructions and procedures, as needed.

46. QUESTIONS TO APD PO TERMS

Section 9 – Please delete this section, or conform it to Section 6.13 of the ITB, which states that a Performance Bond is not required for this project. Contractor cannot price the cost of a bond or letter of credit that may be demanded at the Agency's sole discretion after award.

No. The Agency declines the requested deletion or modification of Section 9 of the APD Purchase Order Terms and Conditions (Exhibit A). As specified in Section 6.13 of the ITB, no performance bond is required for this Contract.

Section 9 of Exhibit A is a general provision addressing the Agency's authority to require performance security. The Agency confirms that no performance bond, letter of credit, or other form of performance security is required for this solicitation. The Agency will retain these provisions as currently written.

47. QUESTIONS TO APD PO TERMS

Section 13 – Will the Agency confirm that the Health Insurance Portability and Accountability Act is not applicable to these services and that no Business Associate Agreement will be required, as Contractor will not create, receive, maintain, or transmit protected health information in the performance of this Contract?

Yes. Based on the scope of services outlined in the ITB, the Contractor is not expected to create, receive, maintain, or transmit protected health information (PHI) on behalf of the Agency.

Therefore, a Business Associate Agreement (BAA) is not required for this Contract. Section 13 of the APD Purchase Order Terms and Conditions (Exhibit A) will remain as written, and all applicable confidentiality and privacy requirements must be followed.

48. QUESTIONS TO APD PO TERMS

Section 14 – Please amend this section to require written notice of the alleged noncompliance and a reasonable opportunity (not less than ten (10) days) to cure or to implement a corrective action plan before any financial consequence is imposed, and to conform the percentages and process to Section 7.15 of the ITB.

Contractor also requests confirmation that financial consequences will be calculated on the payments attributable to the deficient service rather than on total Purchase Order payments.

No. The Agency declines the requested revisions to Section 14 of the APD Purchase Order Terms and Conditions (Exhibit A).

Section 7.15 of the ITB provides for written notice and a two-week period to correct identified deficiencies before the financial consequences described in that section may be assessed.

Section 14 of Exhibit A establishes additional financial consequences for noncompliance, including specified percentages based on the nature and severity of the deficiency.

These percentages are calculated in accordance with Section 14, including its provisions concerning total Purchase Order payments during the applicable period.

The Agency will retain these provisions as currently written.

49. QUESTIONS TO APD PO TERMS

Section 15 – Because of the substantial capital investment required to furnish the compactor, open-box containers, and thirty-two (32) specialized towable dumpsters, a thirty (30) day termination for convenience is not equitable. Will the Agency (i) delete the termination for convenience right, or in the alternative extend the notice period to not less than one hundred twenty (120) days; (ii) provide that upon any termination other than for Contractor's uncured default, the Agency will pay Contractor the unamortized cost of the equipment furnished for this Contract; and (iii) allow Contractor a reasonable period, not less than thirty (30) days, following termination to remove its equipment from the campus?

Contractor further requests that the twenty-four (24) hour cure period for noncompliance be extended to thirty (30) days following written notice, and that the non-appropriation right be exercised only as a fiscal measure and not for the Agency's convenience.

No. The Agency declines the requested revisions to Section 15 of the APD Purchase Order Terms and Conditions (Exhibit A).

The Agency will not reimburse the Contractor for unamortized equipment costs upon termination. The Contractor shall remain responsible for removing its equipment from the facility in coordination with Tacachale to ensure continuity of services and compliance with applicable facility security requirements.

50. QUESTIONS TO APD PO TERMS

Section 17 – This section provides that the terms of the Purchase Order supersede all prior and subsequent agreements. Will the Agency confirm that the ITB, Contractor's Bid, and the exceptions accepted by the Agency are incorporated into the Purchase Order and will control to the extent of any conflict with these standard terms?

No. The Agency declines the requested modification or interpretation of Section 17 of the APD Purchase Order Terms and Conditions (Exhibit A). As specified in Section 6.6 of the ITB, the successful Respondent's Bid will be incorporated into the resulting Contract/Purchase Order. However, the terms and conditions of the ITB shall control notwithstanding any conflicting statements or conditions submitted by the Respondent. The Agency will retain Section 17 of Exhibit A as currently written.

51. QUESTIONS TO APD PO TERMS

Section 20 – Will the Agency confirm that the Information Security Obligations in this section are not applicable, as Contractor will not collect, use, or have access to any Agency data system or information in the performance of these services? If the Agency believes the section applies, please identify the systems and information at issue.

No. The Agency will retain Section 20 of the APD Purchase Order Terms and Conditions (Exhibit A) as currently written. Based on the scope of services outlined in the ITB, the Contractor is not expected to require access to Agency information systems or sensitive Agency data to perform refuse collection, hauling, and disposal services.

52. QUESTIONS TO APD PO TERMS

AND CONDITIONS (EXHIBIT A)

Section 21 – Contractor is willing to maintain records relating to this Purchase Order and to make them available for inspection and audit, subject to reasonable limitations. Will the Agency amend this section to provide that any audit be conducted upon reasonable prior written notice, during normal business hours, not more than once in any twelve (12) month period, at the Agency's sole cost and expense, and limited to records directly related to the services provided under this Purchase Order, excluding Contractor's confidential, proprietary, or privileged information?

No. The Agency declines the requested revisions to Section 21 of the APD Purchase Order Terms and Conditions (Exhibit A). The Contractor shall maintain and make available all records required under the Purchase Order and applicable Florida law.

The Agency will not agree to restrictions limiting the frequency, timing, or cost of audits or excluding records necessary to verify compliance with contractual requirements. Any records determined to be confidential, exempt, or privileged under applicable law will be handled in accordance with those legal requirements.

53. PUR 1000 and PUR 1001 – These forms are incorporated by reference into the ITB and the Purchase Order. Contractor reserves its exceptions to the provisions of PUR 1000 that are inconsistent with the items set forth in this document, including without limitation the insurance (Section 8), indemnification (Section 24), termination for convenience (Section 25), assignment 4934-0441-1358, v. 1 (Section 30), and audit and records provisions, and requests that the Agency confirm that the exceptions accepted by the Agency control over the conflicting terms of PUR 1000.

No. The Agency declines the requested exceptions or modifications to PUR 1000 and PUR 1001. These forms are incorporated by reference into the ITB and resulting Contract/Purchase Order and shall remain applicable.

As specified in Sections 2.0 and 3.0 of the ITB, the solicitation's additional instructions and special conditions take precedence over conflicting provisions of PUR 1001 and PUR 1000, respectively, unless otherwise required by Florida Statutes.

The Agency does not accept the Contractor's proposed exceptions to the insurance, indemnification, termination, assignment, or audit and records provisions. All applicable terms and conditions shall remain as currently written.

54. ADDITIONAL COMMENTS AND

OBSERVATIONS

In addition to the terms set forth in the ITB and the APD PO Terms and Conditions, Contractor seeks inclusion of the following provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Notwithstanding anything herein to the contrary: (a) Contractor shall have no obligation to collect, haul, or dispose of any material which is or contains, or which Contractor reasonably believes to be or contain, radioactive, volatile, corrosive, highly flammable, explosive, biomedical, infectious, biohazardous, toxic, or hazardous material as defined by applicable federal, state, or local laws or regulations ("Excluded Waste"); (b) if Contractor finds what reasonably appears to be discarded Excluded Waste, Contractor shall promptly notify the Agency and the producer of the Excluded Waste, if the producer can be readily identified; and (c) title to and liability for any Excluded Waste shall remain with the producer of the Excluded Waste, even if Contractor inadvertently collects or disposes of such Excluded Waste.

No. The Agency declines the request to incorporate the proposed additional provisions into the Contract. The Agency will retain the existing contractual requirements as currently written.

55. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Any equipment furnished hereunder by Contractor shall remain the property of Contractor; however, the Agency shall have care, custody, and control of the equipment while it is at the service locations. The Agency shall not overload (by weight or volume), alter, or relocate the equipment other than as contemplated by this Contract, and shall use the equipment only for its proper and intended purpose. The Agency shall provide unobstructed access to the equipment on the scheduled collection day. The Agency shall be responsible for loss of or damage to Contractor's equipment, and for injury to persons or damage to property, to the extent resulting from the acts or omissions of the Agency or its personnel while the equipment is in their care, custody, and control. The word "equipment" as used herein shall mean all containers, dumpsters, compactors, and related items used for the storage or compaction of non-hazardous solid waste.

existing contractual requirements as currently written.

56. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Notwithstanding anything herein to the contrary, Contractor may pass through, and the Agency shall pay to Contractor, any documented increases in landfill or disposal fees, increases in Contractor's costs due to changes in local, state, or federal laws, rules, ordinances, or regulations applicable to Contractor's operations or the services provided hereunder, and any increases in or newly imposed taxes, fees, or other governmental charges assessed against or passed through to Contractor (other than income or real property taxes).

57. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Except in the case of Contractor's negligence or willful misconduct, Contractor shall not be liable for any damage to pavement, curbing, driveways, or other driving or parking surfaces resulting from the weight of its trucks and equipment, or for damage resulting from Contractor's travel over surfaces not designed to accommodate such vehicles at the Agency's direction.

existing contractual requirements as currently written.

58. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Contractor shall not be responsible for and has not made any representation regarding the ultimate disposition, recycling, or processing of materials delivered by Contractor to any third-party disposal or processing facility.

existing contractual requirements as currently written.

59. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

In the event of a public emergency, natural disaster, hurricane, flood, pandemic, labor disturbance, or other similar event beyond Contractor's reasonable control, Contractor may suspend, or otherwise modify, any and all services provided for hereunder in order to ensure the safety of Contractor's employees and the community and to protect Contractor's property. Contractor shall use commercially reasonable efforts to resume regular services as soon as practicable and shall advise the Agency when normal schedules are anticipated to resume. Contractor shall not be in

No. The Agency declines the request to incorporate the proposed default under this Contract for any failure or delay in performance caused by such an event.

60. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

If either party is in breach of any provision of this Contract, the other party may suspend its performance hereunder until such breach has been cured or terminate this Contract; provided, 4934-0441-1358,

v. 1 however, that no termination shall be effective until the complaining party has given written notice of such breach to the breaching party and the breaching party has failed to cure such breach within thirty (30) days after its receipt of such notice.

existing contractual requirements as currently written.

61. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Contractor may assign this Contract, or any of its rights or obligations hereunder, to an affiliate of Contractor or in connection with a merger, reorganization, or sale of all or substantially all of its assets, without the prior consent of the Agency. Any other assignment shall require the Agency's consent, which shall not be unreasonably withheld, conditioned, or delayed.

62. ADDITIONAL COMMENTS AND

provisions in the Contract between the Agency and Contractor. For purposes of these provisions, "Agency" shall also refer to and include the Agency's employees, contractors, and agents:

Neither party shall be liable to the other for consequential, indirect, special, punitive, or incidental damages, including lost profits, arising out of or relating to this Contract.

existing contractual requirements as currently written.

63. Will the agency accept plastic 4-yard containers with lockable lids, and how should alternate pricing be submitted?

Yes. The Agency will accept plastic four-cubic-yard dumpsters/containers with lockable lids as an optional alternative to steel containers, provided they meet all applicable specifications and performance requirements outlined in the ITB.

Respondents shall submit the required pricing for steel containers under Item 9A of the revised Attachment I – Price Page. Optional pricing for plastic containers may be submitted under Item 9B.

Optional alternative pricing will not be included in the evaluated Bid price.

Refer to the revised Section 7.3, Containers and Equipment, and Attachment I – Price Page, included in Addenda 2, for additional details.

64. Can the three 1-year renewals be exercised as a single 3-year extension or a combined 6-year total term?

No. As specified in Section 4.1 of the ITB, the Contract provides for an initial three (3) year term with three (3) separate one-year renewal options. Each renewal option may be exercised individually, at the Agency's discretion, in accordance with the terms and conditions of the Contract.

The maximum Contract duration, including all renewal options, is six (6) years. The three (3) one-year renewal options will not be combined into a single three-year extension.

65. Are Gainesville franchise fees to be included in the bid price, and who is responsible for them?

No additional compensation will be provided by the Agency for these fees.

66. Please confirm the vendor is responsible for all electrical hookup and any related permits for the compactor (3-phase, 208V).

Yes. The vendor shall be responsible for all electrical connections and hookups required for the compactor, including the specified three-phase, 208-volt electrical service, and for obtaining any applicable permits.

67. Because time will be needed to order equipment and install it, what is the timeline after the Agency has made a Decision and notified the Awarded Respondent/Vendor will reasonably have to order and set up equipment between the date services will be expected to commence?

Refer to the answer to question 7.

68. In place of Three (3) One (1) year renewals and the Initial (3) year term, would a 6-year initial term/agreement be an option?

No. Refer to answer to question 64.

69. Disposal of concrete debris in the disposal yard is there a solution or plan to dispose of it?

The disposal of concrete debris currently located in the disposal yard is outside the scope of this ITB.

70. Can the Incumbent/Current Vendor use their current equipment onsite?

Yes, if they are the selected vendor and all existing equipment meets new specifications.

71. Is refurbished equipment allowed or will new equipment be required?

Yes. Refurbished equipment is allowed as long it meets new specifications. Refer to the revised Section 7.3, Containers and Equipment, included in Addenda 2, for additional details.

72. May the Awarded Respondent/Vendor subcontract for equipment? Yes. The awarded Contractor may obtain or lease equipment from another vendor, provided all equipment meets the specifications and requirements outlined in the ITB. The Contractor shall remain fully responsible for furnishing, installing, maintaining, and servicing the required equipment.

If the arrangement involves subcontracting any portion of the services required under the Contract, the subcontracting requirements outlined in Section 6.5 of the ITB shall apply, including the Agency's prior written approval.

73. Per page 18 in the Section 7: Scope of Servies 7.4 subsection b) The 2-hour timeframe to pick up the compactor after notification from Tacachale.