This document is Addendum No. 2 for Invitation to Bid (ITB) #240002935-1 issued by the Alaska Department of Corrections for the WWCC Building 10 Sewer Lift Station Replacement project at Wildwood Correctional Center in Kenai, Alaska. The addendum provides critical updates for potential bidders, including a second pre-bid site visit scheduled for May 1, 2025, at 1:00 p.m. local time. All site visit attendees are required to complete and submit a security clearance/PREA (Prison Rape Elimination Act) form to John Gard at john.gard@alaska.gov at least 72 hours in advance. The document also includes an attached Planholders List with three pages identifying companies that have obtained bid documents, with companies highlighted in yellow indicating attendance at the previous pre-bid site visit on March 20, 2025.
The addendum emphasizes strict security protocols typical of correctional facility projects, requiring comprehensive background checks for all personnel. The Planholders List reveals several potential bidders, including Superior, Kachemak Electric Co, Chumleys Inc, Peninsula Construction Inc, Foster Construction LLC, Southcentral Construction Inc, Consolidated Contracting and Engineering, and Dodge Construction Network. The bid deadline remains May 6, 2025, at 2:00 p.m. local time, and vendors are instructed to acknowledge this addendum in their quote submissions. The document underscores the importance of complying with all security and administrative requirements for this infrastructure replacement project at the correctional facility.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Corrections
DIVISION OF ADMINISTRATIVE SERVICES
802 3rd Street, Suite 224 Douglas, Alaska 99824
Main: 907.465.6014 Email: Michael.lim@alaska.gov
Issue Date: April 29, 2025
ATTN: Vendors
RE: Project Name: WWCC Building 10 Sewer Lift Station Replacement
Project Number: 240002935-1 Project Location: Wildwood Correctional Center (WWCC), Kenai, Alaska ITB Deadline: May 6, 2025 @ 2:00 p.m. local time
Addendum # Two (2)
This addendum forms a part of the contract documents and modifies the original drawings and/or specifications for the subject work. In case of conflicts between this addendum and previously issued documents, this addendum shall take precedence.
1. 2nd Pre-Bid Site visit is scheduled on May 1, 2025 @ 1:00 p.m., local time. All attendees must fill out the security clearance / PREA form and to be submitted to John Gard @ john.gard@alaska.gov. See attached Clearance / PREA forms.
2. Attached is the Planholders’s List for this project (3 pages). The company names that are in highlighted in yellow attended the pre-bid sit visit that was scheduled on March 20, 2025 @ 1:00 pm.
This addendum is considered part of the Invitation to Bid (ITB) and is to be acknowledge on your quote.
Please contact me if you have any questions.
Sincerely, Michael Lim Procurement Manager cc: John Gard, Facilities Manager I, DOC
End of Addendum mailto:Michael.lim@alaska.gov mailto:john.gard@alaska.gov
State of Alaska Department of Corrections
REQUEST FOR CLEARANCE
Contractor/Contract Staff Background Check
Date: ________________
Applicant Name:_________________________________________________________________________
Mailing Address: _______________________________________________________________________
Purpose of this check:________________________________________ ____________________________
Date of Birth:___________________________ Social Security # : _______________________________
Alaska driver’s license #:__________________
Other states applicant has resided in and the dates:______________________________________________
Prior criminal history (including the state the offense occurred in): ________________________________
Is applicant currently on probation or parole? _______If yes, where?_________________________________
Does applicant have any relatives or acquaintances presently incarcerated in Alaska or under the Dept. of Corrections supervision? _____ If yes, state the person’s name/location:
Clearance requested by (Contractor):________________________________________________________ Address:____________________________________________________ Phone:____________________
The information that I have provided is true and accurate to the best of my knowledge. I authorize the Department of Corrections to perform a background investigation for any and all prior convictions or current warrants.
Signature of applicant:__________________________________ Date:______________________
Contractor’s signature:__________________________________ Date:______________________
APSIN/WANTS: Clear:______ Wants:______ See Attached:______ NCIC/WANTS: Clear:______ Wants:______ See Attached:______ Criminal History Check (AK) No record found:______ See Attached:______ Criminal History Check (other states) No record found:______ See Attached:______
Request Granted: ______ Request Denied:______
Reason for denial:_______________________________________________________________________
Director/Superintendent (or designee): ________________________________ Date:_________________
DO NOT WRITE BELOW THIS SECTION
WWCC Building 10 Sewer Lift Station Replacement 240002935-1
STATE OF ALASKA DEPARTMENT OF CORRECTIONS
1 | P a g e
All SEXUAL BEHAVIOR IS PROHIBITED
ZERO-TOLERANCE POLICY
PRISON RAPE ELIMINATION ACT (PREA)
1. Alaska Department of Corrections Policy and Procedure 808.19 Prisoner Rights, Sexual Abuse / Sexual Assault and Reporting establishes a zero-tolerance policy toward sexual misconduct and provides guidelines and procedures consistent with the Prison
Rape Elimination Act (PREA) to reduce the risk of sexual misconduct within the correctional setting.
2. Sexual assault, sexual misconduct, and sexual harassment, or any type of sexual behaviors are PROHIBITED.
3. Types of Sexual Assault, Misconduct, and Harassment
• Prisoner-on-employee/contract worker/volunteer
• Employee/contract worker/volunteer-on-prisoner
• Prisoner on prisoner
4. Acts of Sexual Assault, Misconduct, and Harassment
• There is NO allowable consensual agreement between DOC employees, contract workers, volunteers, or offenders to engage in ANY sexual behavior or act.
• The physical act
• The attempt of the physical act, including inappropriate touching and exhibitionism.
• Threats, intimidation, and actions/communications meant to coerce or pressure another to engage in the inappropriate act.
• Retaliation against individuals reporting prohibited sexual behavior is prohibited and punishable.
5. All Department personnel, contractors or volunteers who receive information concerning prisoner sexual misconduct or have reasonable belief to suspect a prisoner is a victim of sexual misconduct or observe an incident or behavior shall immediately report the information to the most appropriate supervisory staff. The information shall be documented on an Incident Report form 809.03A.
6. Prisoners may report allegations of conduct prohibited by Policy and Procedures 808.09, including threats of sexual misconduct to any Department employee, contractor, or volunteer. The such allegation may be reported verbally, in writing, or may be made by a third party.
7. All reports of prohibited sexual behavior will be referred to a law enforcement agency for investigation and referral to the Alaska
State Troopers by the Department of Corrections.
8. Privileged communications between ordained clergy, medical or mental health staff, and clients does not extend to the matter that threatens the safety of the institution, staff, or prisoners; if it contains a threat to public safety or if it is specifically addressed by state statutes.
9. Confidentiality: All information related to a victim of sexual abuse or sexual harassment shall be considered confidential and shall be released only to those who need the information to perform their official duties.
I HAVE READ, UNDERSTOOD, AND AGREE WITH THE ABOVE RULES.
* I also acknowledge that I have been informed of my Prison Rape Elimination Act Responsibilities.*
Name (print and sign) Date
DEPARTMENT OF CORRECTIONS
PLANHOLDERS LIST
DATE NO. OF
SETS *TYPE* ADD/RPT
OTHER
POC:
PHONE: Email
POC:
PHONE: Email
POC:
PHONE: Email:
C (CONSULTANT)A (AGENCY) P (PLANROOM)
G (GENERAL)
COMPANY NAME: Chumleys Inc
SP (SUPPLIER)
Mark Cialek
MAILING ADDRESS:
COMPANY NAME: Kachemak Electric Co
PHYSICAL ADDRESS:
PHYSICAL ADDRESS:
gcodyb@gmail.com
Cody Burleson mark@kachemakelectric.com
COMPANY NAME: Superior
907-394-2390 - Cell
MAILING ADDRESS:
ADVERTISING DATE: 3/2/2024
Tony Jones
907-513-7425
PHYSICAL ADDRESS:
PROJECT NAME: WWCC Building 10 Lift Station Replacement
PROJECT MANAGER: John Gard
COMPANY/ADDRESS/PHONE/EMAIL
PROJECT NUMBER(S): 240002935-1
BID DUE DATE:
S (SUBCONTRACTOR)
MAILING ADDRESS:
907-349-6550 tjones@superiorak.com afd: G:\Group\CONTRACTS\Facilities Contracts\Forms\Planholder List.xls As of: 4/29/2025 mailto:tjones@superiorak.com mailto:tjones@superiorak.com mailto:mark@kachemakelectric.com mailto:mark@kachemakelectric.com mailto:gcodyb@gmail.com mailto:gcodyb@gmail.com mailto:gcodyb@gmail.com mailto:mark@kachemakelectric.com mailto:tjones@superiorak.com
DATE
ISSUED
NO. OF
SETS *TYPE* ADD/RPT
OTHER
POC:
PHONE: Email:
POC:
PHONE: Email
POC:
PHONE: Email
907-398-6331
A (AGENCY) C (CONSULTANT) P (PLANROOM)
G (GENERAL) S (SUBCONTRACTOR) SP (SUPPLIER)
pencon@alaska.net
Martin Oberg
PHYSICAL ADDRESS:
MAILING ADDRESS:
907-262-1609
COMPANY NAME: Peninsula Construction Inc kyle@fosterconstructionak.com
Kyle Foster
PHYSICAL ADDRESS:
MAILING ADDRESS:
COMPANY NAME: Foster Construction LLC
Ken Griner
907-953-9305-Cell keng@sccak.com
PROJECT MANAGER: John Gard ADVERTISING DATE: 3/2/2024
MAILING ADDRESS:
PHYSICAL ADDRESS:
COMPANY/ADDRESS/PHONE/EMAIL
BID DUE DATE:
PROJECT NAME: WWCC Building 10 Lift Station Replacement PROJECT NUMBER(S): 240002935-1
COMPANY NAME: Southcentral Construction Inc afd: G:\Group\CONTRACTS\Facilities Contracts\Forms\Planholder List.xls As of: 4/29/2025 mailto:keng@sccak.com mailto:keng@sccak.com mailto:kyle@fosterconstructionak.com mailto:kyle@fosterconstructionak.com mailto:pencon@alaska.net mailto:pencon@alaska.net mailto:pencon@alaska.net mailto:kyle@fosterconstructionak.com mailto:keng@sccak.com
DATE
ISSUED
NO. OF
SETS *TYPE* ADD/RPT
OTHER
POC:
PHONE: Email:
POC:
PHONE: Email:
POC:
PHONE: Email:
A (AGENCY) C (CONSULTANT) P (PLANROOM)
G (GENERAL) S (SUBCONTRACTOR) SP (SUPPLIER)
COMPANY NAME:
PHYSICAL ADDRESS:
MAILING ADDRESS:
MAILING ADDRESS:
brenda.cusack@construction.com
PHYSICAL ADDRESS:
consolidated.coneng@gmail.com
COMPANY NAME: Dodge Construction Network
MAILING ADDRESS:
COMPANY/ADDRESS/PHONE/EMAIL
COMPANY NAME: Consolidated Contracting and Engineering
Dave Nickerson
PHYSICAL ADDRESS:
PROJECT NAME: WWCC Building 10 Lift Station Replacement PROJECT NUMBER(S): 240002935-1
PROJECT MANAGER: John Gard ADVERTISING DATE: 3/2/2024 BID DUE DATE:
afd: G:\Group\CONTRACTS\Facilities Contracts\Forms\Planholder List.xls As of: 4/29/2025 mailto:consolidated.coneng@gmail.com mailto:consolidated.coneng@gmail.com mailto:brenda.cusack@construction.com mailto:brenda.cusack@construction.com mailto:brenda.cusack@construction.com mailto:consolidated.coneng@gmail.com
| ITB# 240002935-1, WWCC Building 10 Lift Station Replacement, AM#2 |
| Binder2 |
| 24 - DOC Request for Clearance-PREA Acknowledgement |
| PREA.pdf |
| 2022 Contractor Ack. with PREA.pdf |
| Binder1.pdf |
| Orientation Form for Contractors and Volunteers.pdf |
| Binder1 |
| Planholders List for ITB 240002935-1 |
| Sheet1 |
| Date: |
| Applicant Name: |
| Mailing Address: |
| Purpose of this check: |
| undefined: |
| Date of Birth: |
| Social Security: |
| Alaska drivers license: |
| Other states applicant has resided in and the dates 1: |
| Other states applicant has resided in and the dates 2: |
| Prior criminal history including the state the offense occurred in 1: |
| Prior criminal history including the state the offense occurred in 2: |
| Is applicant currently on probation or parole: |
| If yes where: |
| Corrections supervision: |
| Clearance requested by Contractor: |
| Address: |
| Phone: |
| Date_2: |
| Date_3: |
| Clear: |
| Wants: |
| See Attached: |
| Clear_2: |
| Wants_2: |
| See Attached_2: |
| Criminal History Check AK No record found: |
| See Attached_3: |
| No record found: |
| See Attached_4: |
| Request Granted: |
| Request Denied: |
| Reason for denial: |
| Date_5: |