ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf

PDF 45 MB Posted

Attached to
Russell Harber Dock Replacement State and local contract opportunity
Solicitation number
ITB-2025-06
Issued by
Florida

About this file

The file is an Invitation to Bid (ITB-2025-06) issued by the City of Milton, Florida, for the Russell Harber Dock Replacement project, a FEMA-funded infrastructure rehabilitation initiative. The project involves complete demolition and replacement of existing dock infrastructure, including removal of wooden piles and dock sections, and installation of a new 6'6" wide by 30' long dock with welded aluminum frames, fiberglass reinforced plastic piles, and expanded polystyrene flotation units. Selective salvage of the existing gangway and riprap is required for potential reuse. The bid is due on June 4, 2025, with the opportunity initially posted on May 4, 2025, and requires contractors to follow detailed technical specifications prepared by AMI Consulting Engineers.

The project demands specialized marine construction expertise, with contractors needing to demonstrate technical proficiency in dock infrastructure replacement and familiarity with FEMA-funded recovery projects. While specific budget allocations are not explicitly stated, the comprehensive nature of the project suggests a substantial investment. Contractors must adhere to ASTM International, Florida Department of Transportation, and American Welding Society guidelines, and implement strict environmental protocols including ground and surface water control, dust management, and potential hazardous material handling. The documentation does not mention specific set-aside designations or incumbent vendors, but appears to follow standard municipal bidding procedures that typically encourage diverse contractor participation.

View the file

Other files for this state and local contract opportunity

Other files attached to Russell Harber Dock Replacement, newest first.
File Type Posted
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michele Williams Typewriter

File details come from the government source that posted it. Updated .