ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf

PDF 4 MB Posted

Attached to
Russell Harber Dock Replacement State and local contract opportunity
Solicitation number
ITB-2025-06
Issued by
Florida

About this file

These construction plans detail the Russell Harber Landing project, located in Santa Rosa County, Florida, prepared by Kenneth Horne & Associates, Inc. as an "As-Built" document dated June 2002 for a section of U.S. Highway 90 (State Road #10). The comprehensive set of engineering drawings includes multiple technical plans such as existing conditions and demolition plans, site staking and utility plans, site grading plans, site lighting plans, parking and shelter/pavilion staking plans, and ramp plans with sections and details. The documents cover a curved, approximately 30-acre site featuring intricate infrastructure design including roadways, utilities, landscaping, drainage systems, and architectural elements along what appears to be a waterfront or river landing area.

The technical drawings demonstrate meticulous design considerations including detailed site grading, precise utility placement, comprehensive tree protection protocols, handicapped accessibility features, and specialized construction techniques. The plans incorporate multiple technical specifications such as pavement cross-sections, expansion and control joint details, thrust block specifications for water utilities, and specific guidelines for environmental protection. The project appears to be a public infrastructure development with significant attention to environmental preservation, accessibility, and technical precision, utilizing professional engineering standards and local municipal design requirements. The drawings were prepared using advanced civil engineering techniques, with multiple layers of technical information integrated into a cohesive site development plan.

View the file

Other files for this state and local contract opportunity

Other files attached to Russell Harber Dock Replacement, newest first.
File Type Posted
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U

S

H

I G

H

W

A

Y

S

T

A

E

R

O

D

S

H

I G

H

W

A

TREE PROTECTION NOTES:

1. DURING DEVELOPMENT ACTIVITIES, PROTECTED TREES SHALL BE PROTECTED

FROM ACTIVITIES WHICH MAY INJURE OR KILL THEM.

2. WITHIN THE DRIP LINE, THERE SHALL BE NO STORAGE OF FILL OR COMPACTION

OF THE SOIL AS FROM HEAVY EQUIPMENT, OR ANY SPILLING, STORAGE OR

DISPOSAL OF CONCRETE, MORTAR, PAINT, SOLVENTS, CHEMICALS, OR OTHER

POTENTIALLY HARMFUL SUBSTANCES.

3. ALL TREES TO BE PROTECTED SHALL BE PROTECTED BY MEANS OF A PHYSICAL

BARRIER WHICH WILL LIMIT ACCESS TO SAID TREE. SAID PROTECTIVE BARRIER

SHALL BE COMPOSED OF WOOD OR OTHER SUITABLE MATERIALS WHICH ASSURE

COMPLIANCE WITH THE INTENT OF THIS ORDINANCE. SAID PROTECTIVE BARRIERS,

WHERE REQUIRED, SHALL REMAIN UNTIL SUCH TIME AS CONSTRUCTION IS

COMPLETE. WHERE POSSIBLE, A MINIMUM OF ONE HUNDRED (100) PERCENT OF

THE AREA WITHIN THE DRIP LINE SHALL BE SO PROTECTED UNLESS A WAIVER IS

GRANTED. ALSO, DURING CONSTRUCTION, NO ATTACHMENTS OR WIRES SHALL BE

ATTACHED TO ANY PROTECTED TREE. BARRIERS WILL BE REQUIRED FOR ALL

TREES BEING PROTECTED EXCEPT IN THE FOLLOWING CASES:

A. ROAD RIGHT-OF-WAYS, UTILITY EASEMENTS, ETC. THESE AREAS MAY BE

RIBBED BY PLACING STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TAPING

RIBBON, PLASTIC TAPE, ROPE, ETC.., FROM STAKE TO STAKE ALONG THE OUTSIDE

PERIMETERS OF SUCH AREAS TO BE CLEARED.

B. LARGE PROPERTY AREAS SEPARATE FROM THE CONSTRUCTION OR LAND

CLEARING AREA INTO WHICH NO EQUIPMENT WILL VENTURE MAY ALSO BE

RIBBONED OFF.

5'

5'

S

H

I G

H

W

A

12"

S

H

I G

H

W

A

S

H

I G

H

W

A

6" PVC

#4 @ 14" O.C. (TYP)

N.T.S.

2'

NEENAH R-4999-CX (TYPE "C" GRATE

AND FRAME) OR APPROVED EQUAL

GRATE TO BE BOLTED SECURELY

TO FRAME

INV. EL (SEE PLAN)

#4 @ 14" O.C. (TYP)

2"

6"

6"

6"

INV EL. (SEE PLAN)

#4 (TYP)

8"

NEENAH R-4999-CX (TYPE "C" GRATE

AND FRAME) OR APPROVED EQUAL

GRATE TO BE BOLTED SECURELY

TO FRAME

TOP EL. (SEE PLAN)

N.T.S.

1/2"

1/4" MIN.

T/3

S

H

I G

H

W

A

Morris Text Box This sheet was imported into CAD and re-plotted for better clarity -ZM-

Inserted this pdf from documentation received from KH&A

Inserted this pdf from documentation received for permitting

Stamp

Untitled
Blank Page

File details come from the government source that posted it. Updated .