ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf

PDF 20 KB Posted

Attached to
Russell Harber Dock Replacement State and local contract opportunity
Solicitation number
ITB-2025-06
Issued by
Florida

About this file

This document is a Bid Form for the Russell Harber Landing Hurricane Sally Storm Damage Repairs project for the City of Milton, Florida, associated with FEMA Project 160536. The bid covers a comprehensive dock repair and replacement project involving the removal of existing 30-foot timber piles, clearing a driving lane, installing new 50-foot composite piles, creating pile guides, constructing a new 6.5-foot wide by 60-foot long floating dock, and reinstalling existing riprap and gangway. The project includes multiple line items such as mobilization, erosion control, dock piles, geotextile fabric installation, and riprap sizing, with quantities specified for each component.

The bid form provides a detailed breakdown of project elements without listing specific pricing, indicating that contractors will need to submit their own cost estimates. The project appears to be funded through FEMA as a Hurricane Sally storm damage recovery effort, with a focus on mitigation and restoration of the Russell Harber Landing dock facility. The document emphasizes that all costs should be considered "in-place" and include materials, hardware, shipping, fabrication, labor, equipment, insurance, bonds, permits, taxes, overhead, and profit. The bid form is dated 4/30/2025 and prepared by AMI Consulting Engineers PA, suggesting a future planned reconstruction timeline for the damaged dock infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to Russell Harber Dock Replacement, newest first.
File Type Posted
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Permitting_Exemption_Letter.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Questions_and_Answers.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_As-Builts.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Rev_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_2_Revised_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendums_Acknowledgement.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Addendum_1.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_AMI_Specs.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Main_Doc.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Bid_Form.pdf PDF
ITB-2025-06_Russell_Harber_Dock_Replacement_-_Planset.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Russell Harber Landing Hurricane Sally Storm Damage Repairs City of Milton, Florida

FEMA PROJECT 160536

System Item Type Unit Qty Cost per Unit TOTAL COST

1.01 Mobilization / Demobilization Assumes barge equipment for installation of piles LS 1.00

1.02 Payment and Performance Bonds Payment and Performance Bonds LS 1.00

1.03 Erosion and Sediment Control Silt curtain, biologs, silt fence, straw and native seed LS 1.00

1.04 Removals Removal of existing 30 foot x 10-inch diameter timber piles EA 5.00

1.05 Clearing the Driving Lane Removing obstructions and riprap from driving lane for new piling. Includes EA 6.00

1.06 Dock Piles New 50 foot by 13-in diameter composite piles EA 6.00

1.07 Pile Guides New guide pockets for piles EA 6.00

1.08 Floating Dock New floating dock 6.5 feet wide by 60 feet long SF 390.00

1.09 Aluminum Cleats 14" aluminum dock cleats EA 10.00

1.10 Salvage and Reinstall Salvage and Reinstall existing riprap and gangway LS 1.00

1.11 Fill Materials - Bedding Stone Sizing per 2025 FDOT Standard Specifications Section 530-2.1.4 CY 45.00

1.12 Geotextile Fabric High Strength Non-Woven Geotextile Fabric SY 225.00

1.13 Riprap Sizing per 2025 FDOT Standard Specifications Section 530-2.1.3 CY 150.00

Highlighted lines indicate mitigation items -$

RUSSELL HARBER PARK DOCK REPAIR/REPLACMENT BID FORM

NOTE: All costs are to be considered in-place costs. Include cost for all materials, hardware, shipping, fabrication, labor, equipment, insurance, bonds, permits state and local taxes, overhead and profit to properly install items listed under each system.

FLOATING DOCK WITH COMPOSITE PILING (MITIGATION)

PROJECT TOTALS

CONSTRUCTION COST TOTAL

AMI Consulting Engineers PA Confidential 4/30/2025 Page 1

File details come from the government source that posted it. Updated .