ITB 2023-17 Clarifying Questions 4.pdf

PDF 124 KB Posted

Attached to
ITB 2023-17 Demolition of Miles Fiberglass Building
Solicitation number
S-C01010-00005783
Issued by
Clackamas County, Hebo CDP, Oregon

About this file

This document is a response to clarifying questions for Invitation to Bid (ITB) #2023-17 for the Demolition of the Miles Fiberglass Building, issued by the Clackamas County Development Agency. The solicitation requires a full abatement survey, the use of a fast germinating seed mix for erosion control, and the provision of erosion control measures as necessary to prevent material from leaving the site. A bid bond is also required, as stated in Addendum 1.

The scope of work involves the removal or demolition of specifically identified structures and/or solid waste materials, including hazardous waste, from real property owned by the Clackamas County Development Agency in Oregon City, Oregon. No further details on pricing terms, set-asides, incumbents, funding requirements, or sources are provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2023-17

Demolition of Miles Fiberglass Building (“BID”)

RESPONSE TO CLARIFYING QUESTIONS 4

March 2, 2023

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. You had mentioned the contractor is responsible for the hazardous survey. Are you wanting a full abatement survey or are you wanting a level one site assessment?

Answer: A level one assessment has already been completed so a full abatement survey is needed.

2. Do you have a specific seed mix in mind or will any fast germinating be acceptable?

Answer: No specific seed mix is specified other than it being fast germinating.

3. Will erosion control be needed?

Answer: Erosion control should be provided as necessary to prevent material from leaving the site and onto the sidewalks or roadways.

4. Will there be a Bid Bond needed?

Answer: Yes, please see Addendum 1.

End of Clarifying Questions 4