This is Addendum #2 for Invitation to Bid (ITB-2018-0341) issued by the City of Casselberry's Finance Department and Procurement Division for the PW 1409 Casselton Drive Improvements project. The addendum, dated May 21, 2018, provides additional information and clarification for the solicitation, with the bid due date remaining May 31, 2018 at 2:00 P.M. Local Time. The addendum addresses a contractor's question regarding a 3-foot wide area along the reconstruction portion that cannot be reconstructed within the current Maintenance of Traffic (MOT) plan, referencing attached documents including a new typical section sheet for Temporary Traffic Control Plan.

The addendum requires bidders to acknowledge receipt by signing and returning the acknowledgment form or including it with their submittal, with potential disqualification for non-compliance. No changes, additions, or clarifications were noted in this addendum beyond the traffic control plan question and response. The project involves roadway improvements to Casselton Drive between SR 436 (Semoran Boulevard) and Casselwood Street, and to Greencastle Boulevard between SR 436 and Casselton Drive, with specific details about traffic management and reconstruction activities provided in the attached documents.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUR-F- 212

Rev. 11/2016

City of Casselberry | Finance Department | Procurement Division 95 Triplet Lake Drive, Casselberry, Florida 32707

Phone: 407-262-7700, extension 1142 | Fax: 407-262-7746 | Email: procurement@casselberry.org ADDENDUM #2 ITB-2018-0341 PW 1409 Casselton Drive Improvements

DATE: May 21, 2018

TO: All Bidders/Proposers

FROM: Rhonda Ulmer

City of Casselberry Procurement Division

SUBJECT: ITB-2018-0341 PW 1409 Casselton Drive Improvements

This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or answers to questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal and/or other instructions given to any bidder/proposer qualified to respond pursuant to the requirements set forth in the solicitation document.

I. DUE DATE

This Addendum does not change the solicitation due date from May 31, 2018 at 2:00 P.M. Local Time.

II. QUESTIONS AND ANSWERS (Q&A)

Q1: Upon review of the MOT plan, we have come to realize that there is on average a 3’ wide area along the reconstruction portion of the project that cannot be reconstructed within the parameters of the MOT plan. Please comment on how the city plans to address this issue?

A1: Reference the attached addendum documents, including a note on the cover sheet and the new typical section sheet 93A - TEMPORARY TRAFFIC CONTROL PLAN. Note that sheet 93 did not need to be edited, as the call out updates were included on the new sheet.

III. CHANGES, ADDITIONS AND/OR CLARIFICATIONS

CHANGES:

N/A

CLARIFICATIONS:

CHANGE NO. 1: QUESTIONS

THE REMAINDER OF THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK.

mailto:rulmer@casselberry.org

PUR-F- 212

Rev. 11/2016

City of Casselberry | Finance Department | Procurement Division 95 Triplet Lake Drive, Casselberry, Florida 32707

Phone: 407-262-7700, extension 1142 | Fax: 407-262-7746 | Email: procurement@casselberry.org ADDENDUM #2 ITB-2018-0341 PW 1409 Casselton Drive Improvements

Respondents must acknowledge receipt of this Addendum by signing this form below and returning it to the Procurement Division prior to the hour and date specified for receipt of bids/proposals or by including this Addendum with your submittal. Failure to comply may result in disqualification of your response.

Acknowledgment is hereby made of ITB-2018-0341 PW 1409 Casselton Drive Improvements

Name of Firm/Company Contact Email

Street Address City, State, Zip Code

Telephone Number Fax Number

Authorized Person Printed Name Authorized Person Title

Authorized Person Signature Date of Signature mailto:rulmer@casselberry.org

T 22 S

T 22 S

CONTRACT PLANS COMPONENTS

ROADWAY PLANS

LANDSCAPE PLANS

BEGIN PROJECT

STA. 2+24.00

END PROJECT

STA. 27+20.00

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOW

ST PETERSBURG

FT PIERCE

FT MYERS

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

FORT WALTON

BEACH

PENSACOLA

WEST PALM

BEACH

F

L

O

R

I

D

A

T

U

R

N

P

I

K

E

PANAMA

CITY

LAKE

CITY

DAYTONA

BEACH

SARASOTA -

BRADENTON

BEE LINE

EXPRESSWAY

PROJECT LOCATION

https://goo.gl/maps/q7d9tB7REq12

SHEET

NO.

FISCAL

YEAR

5/18/2018 4:11:13 PM

U:\Casselton Drive\00704.00\roadway\KEYSRD01.dwg

TBG T-4

INDEX OF ROADWAY PLANS

SHEET NO. SHEET DESCRIPTION

1 KEY SHEET

2 - 3 SUMMARY OF PAY ITEMS

4 - 13 TYPICAL SECTION

14 PROJECT LAYOUT

15 - 16 GENERAL NOTES

17 - 23 ROADWAY PLAN

24 - 29 ROADWAY PROFILE

30 - 32 SPECIAL PROFILE

33 - 36 BACK-OF-SIDEWALK PROFILE

37 - 38 INTERSECTION LAYOUT

39 - 40 DRAINAGE STRUCTURE TABLE

41 STORM PIPE TABLE

42 - 58 DRAINAGE DETAILS

59 SPECIAL DETAILS

60 - 87 CROSS SECTIONS

88 STORMWATER POLLUTION PREVENTION PLAN

89 - 90 EROSION CONTROL

91 - 106 TEMPORARY TRAFFIC CONTROL PLAN

107 - 112 WATER MAIN IMPROVEMENTS PLAN AND PROFILE

113 - 114 WATER MAIN IMPROVEMENT DETAILS

115 - 120 UTILITY ADJUSTMENTS

121 - 124 UTILITY DETAILS

125 Vvh SUMMARY

S-1 - S-7 SIGNING AND PAVEMENT MARKING PLAN

SQ-1 - SQ-7 SUMMARY OF QUANTITIES

SQ-8 TABULATION OF QUANTITIES (SIGNING AND PAVEMENT MARKING)

N

CITY OF CASSELBERRY, FLORIDA

ROADWAY

ENGINEER OF RECORD:

SHERMAN C. KLAUS II, P.E.

P.E. NO.: 58262

THE BALMORAL GROUP

165 LINCOLN AVENUE

WINTER PARK, FLORIDA 32789

CERTIFICATE OF AUTHORIZATION NO.: 26123

GOVERNING STANDARD PLANS:

Florida Department of Transportation, FY2018-19

Standard Plans for Road and Bridge Construction and applicable Interim Revisions (IRs).

GOVERNING STANDARD SPECIFICATIONS:

Florida Department of Transportation, JAN. 2018

Standard Specifications for Road and Bridge

Construction at the following website:

http://www.fdot.gov/programmanagement/Implemented/SpecBooks

R

E

R

E

T 21 S

T 22 S

T 21 S

T 22 S

TO

ORLANDO

TO

ORLANDO

TO

ALTAMONTE SPRINGS

TO

OVIEDO

R

E

R

E

R

E

R

E

R

E

R

E

ORANGE COUNTY

O R A N G E

C O U N T Y

PLANS OF PROPOSED

CASSELTON DRIVE IMPROVEMENTS

PROJECT NUMBER PW 1409

0 0.5 1

MILES

DRAINAGE

ENGINEER OF RECORD:

LEE G. MULLON, P.E.

P.E. NO.: 72414

GEOSYNTEC

1511 EAST STATE ROAD 434, SUITE 1005

WINTER SPRINGS, FLORIDA 32708

CERTIFICATE OF AUTHORIZATION NO.: 4321

Standard Plans for Road Construction and associated IRs are available at the following website:

http://www.fdot.gov/design/standardplans

REVISIONS:

ADDENDUM 2: ROADWAY SHEET 93A (SHEET ADDED)

£ CONST. CASSELTON DR

10' 10'

R W

L I N E

R W

L I N E

WORK AREA

VARIES - 2' TO 10'

2'

TEMPORARY TRAFFIC

CONTROL PLAN

CITY OF

CASSELBERRY

ROAD PROJECT NO.

DESCRIPTIONDATE DESCRIPTION DATE

REVISIONS

SHEET

NO.

U:\Casselton Drive\00704.00\roadway\TCTYRD01.dwg

TBG T-4 5/18/2018 2:56:05 PM

5/18/18

CASSELTON DR.

PW 1409

The Balmoral Group

165 Lincoln Avenue

Winter Park, FL 32789

Phone: (407) 629-2185 www.balmoralgroup.us

Certificate of Authorization No. 26123

E.O.R.: Sherman C. Klaus II, P.E. No. 58262

TYPICAL SECTIONS & PHASING NOTES

TEMPORARY TRAFFIC CONTROL PHASING NOTES

PHASE IIC: THE INTENT OF THIS PHASE IS TO PERFORM REMAINING ROADWAY PAVEMENT RECONSTRUCTION.

1) INSTALL TRAFFIC CONTROL DEVICES AND TEMPORARY SIGNS PER INDEX 102-603

AND PLACE TRAFFIC INTO ONE LANE-TWO WAY CONFIGURATION.

2) PERFORM PAVEMENT RECONSTRUCTION ACTIVITIES. MITIGATE DROP-OFFS IN

ACCORDANCE WITH INDEX 102-600, SHEET 9 OF 12, NOTE NO. 3.

3) PLACE TEMPORARY STRIPING.

LANE IDENTIFICATION + DIRECTIONAL OF TRAVEL

LEGEND

CHANNELIZING DEVICE

(SEE INDEX NO. 102-600)

TTCP TYPICAL SECTION - PHASE IIC

STA. 15+00 TO STA. 20+00

1 SHEET ADDED

93A

ITB-2018-0341 PW 1409 Casselton Drive Improvements Addendum No. 2
ITB-2018-0341 PW 1409 Casselton Drive Improvements attachment Addendum No. 2

File details come from the government source that posted it. Updated .