ITB_11-25_Addendum.pdf

PDF 689 KB Posted

Attached to
ITB 11-25 Warehouse Storage Building
Solicitation number
ITB 11-25
Issued by
Volusia County, Florida

About this file

This document is Addendum No. 1 for Invitation to Bid (ITB) 11-25 issued by New Smyrna Beach Utilities for a warehouse storage building project. The addendum provides clarifications and additional details for potential bidders, addressing 23 specific questions about the project requirements. Key points include confirmation that bidders must include costs for a geotechnical report and materials testing, provide a civil drawing package, and construct an open, three-sided structure with a minimum 1:12 roof slope. The project will require a structure with four bays, each 27 feet wide, and a building width between 108-115 feet, with a 35-foot depth and minimum bay opening height of 14 feet.

The addendum specifies that there will be no electrical requirements for the new canopy, no office space or restrooms needed, and no walk doors. New Smyrna Beach Utilities will be responsible for site preparation, including tree trimming, pole removal, and gravel removal. The structural steel will use a red iron finish with a red oxide primer, and there are no insulation requirements for the open structure. The project has no specific set-asides or incumbent vendors mentioned, and the anticipated start date is "as soon as possible". Bidders must acknowledge receipt of this addendum by signing and returning the provided form with their proposal, with the project requiring a civil drawing package and adherence to specific technical specifications.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW SMYRNA BEACH UTILITIES

200 CANAL STREET

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

WAREHOUSE STORAGE BUILDING

ITB 11-25

ADDENDUM NO 1

Page 1 ITB 11-25 Addendum No 1

DATE: 5-2-25

RE: ITB No. 11-25 ADDENDUM NO. 01

To prospective vendors:

New Smyrna Beach Utilities is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.

1. Do we need to include monies for a geotechnical report? Yes

2. Are we to include materials testing? Yes, materials testing should include compaction/density for the soil and cylinder testing for the concrete.

3. Do you have an existing TOPO you can provide? Attached is the available survey with topo information. Any additional survey information required will be the responsibility of the contractor.

4. Will there be office space or restrooms needed? No, this is a storage building only.

5. Will we be tying into any existing Utilities and are there as-builts for this? No

6. Does the building need to be sprinklered? No

7. Will there be any MEP drawings provided? No

8. Can you please provide any available previous survey and a preferred vendor for an updated survey if you have one? Please see question # 3 about the survey. We do not have a preferred Survey vendor.

9. Please provide electrical requirements for the new canopy, lighting, convenience outlets, etc. and the location of the nearest panel with available capacity. There will be no electrical requirements for the new canopy.

10. Please confirm that New Smyrna Utilities will take care of any necessary tree trimming, pole removal, equipment moving that may be required to give us a clean site to construct

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

WAREHOUSE STORAGE BUILDING

Page 2 ITB 11-25 Addendum No 1 the new canopy. NSBU will be responsible for tree trimming, pole removal and equipment removal to provide a clean site.

11. Please confirm that New Smyrna Utilities will strip all gravel from the area where the new canopy will be constructed. NSBU is responsible for the gravel removal from the area where the new canopy will be constructed.

12. Please confirm that a red iron finish is acceptable for the canopy structural steel. Red iron finish is acceptable for the canopy structural steel.

13. Will a civil drawing package be required? Yes

14. Please confirm desired elevation of slab for the new canopy, match existing adjacent.

Match existing adjacent

15. Will there be any walk doors? No

16. Is there a need for WMP outdoor insulation? No

17. Are there any drawings for the building? No

18. Is there a minimum roof slope for the roof? Minimum 1:12 Slope

19. Is the design intent for an open(high side) structure with a three sides with wall panels?

Yes

20. Are there any requirements for insulation in the ceiling, should this be an open structure? No insulation. Will be an open structure.

21. Rust Resistant coating – all our steel comes with a gray primer. Do the steel components need to be galvanized? No, Red oxide primer

22. Is there an anticipated start date for the project? As soon as possible

23. On the spec sheet provided, it calls out “Rust resistant coating over all metal” Does it need to be galvanized or is red oxide primer? Red oxide primer

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

WAREHOUSE STORAGE BUILDING

Page 3 ITB 11-25 Addendum No 1

A Copy of This Signed Form Must Accompany Your Proposal

Acknowledgment of Receipt of Addenda No. 1

Company_______________________________________

Title___________________________________________

Signature_______________________________________

File details come from the government source that posted it. Updated .