This is a fully executed Interconnection Service Agreement (ISA) involving Clean Energy Inc. (CEI) and Pentucket Regional School District in Massachusetts for a photovoltaic (PV) system installation. The agreement was executed on May 10, 2024, with Eduardo Tolosa serving as the Account Manager for CEI MA. The document establishes the terms and conditions for the interconnection of a PV system to the facility's electrical grid, detailing the technical requirements, safety standards, and operational procedures necessary for the renewable energy installation at Pentucket Middle High School.

The agreement outlines the responsibilities of both parties regarding system design, installation, testing, and ongoing maintenance of the PV system. Key provisions address the interconnection process, performance standards, equipment specifications, and operational protocols to ensure safe and efficient integration of the renewable energy system with the existing electrical infrastructure. The executed agreement confirms that all parties have accepted the terms and are prepared to proceed with the PV system project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05/10/2024

Eduardo Tolosa

Account Manager - CEI MA

05/10/2024