ISA Pentucket fully executed 5 10 24.pdf
PDF 2 MB Posted
- Attached to
- PV System for Pentucket MHS
- Solicitation number
- BD-26-2083-PUR00-PUR01-130519
- Issued by
- Essex County, Massachusetts
About this file
This is a fully executed Interconnection Service Agreement (ISA) involving Clean Energy Inc. (CEI) and Pentucket Regional School District in Massachusetts for a photovoltaic (PV) system installation. The agreement was executed on May 10, 2024, with Eduardo Tolosa serving as the Account Manager for CEI MA. The document establishes the terms and conditions for the interconnection of a PV system to the facility's electrical grid, detailing the technical requirements, safety standards, and operational procedures necessary for the renewable energy installation at Pentucket Middle High School.
The agreement outlines the responsibilities of both parties regarding system design, installation, testing, and ongoing maintenance of the PV system. Key provisions address the interconnection process, performance standards, equipment specifications, and operational protocols to ensure safe and efficient integration of the renewable energy system with the existing electrical infrastructure. The executed agreement confirms that all parties have accepted the terms and are prepared to proceed with the PV system project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pentucket MHS Roof PV Solicitation June426r SW r2.pdf | ||
| DCAMM Update Stmt.pdf | ||
| Addendum 02.pdf | ||
| 2022-0926 Pentucket Regional High School CD Set_Stamped.pdf | ||
| Solar WageSchedule_20260608164012.pdf | ||
| INSURANCE REQUIREMENTS00 08 00.docx | DOCX document | |
| Addendum 01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05/10/2024
Eduardo Tolosa
Account Manager - CEI MA
05/10/2024
File details come from the government source that posted it. Updated .