This addendum to Request for Quote S-DASOBO-00016125 issued by the State of Oregon through OregonBuys announces Round 1 evaluation results and procedures for Round 2 of the IQMS HCI Scheduling Portal procurement. The solicitation seeks quality management services for the Health Care Interpreter Scheduling Portal Project. Three proposals were received and evaluated on a total of 875 points across four criteria: Detailed Approach & Schedule (250 points), Offeror Experience & References (125 points), Personnel Qualifications & Experience (300 points), and Work Examples/DEDs (200 points). Public Knowledge advanced as the sole proposer to Round 2 evaluation with a score of 579 points, the average of all three submitted proposals. Round 2 evaluation will be conducted on a pass/fail basis and requires submission of three additional work samples, participation in a virtual interview scheduled for 90 minutes, and submission of a Best-and-Final Offer (BAFO) price proposal. All three Round 2 criteria must be satisfied for the proposer to pass overall evaluation.
The three required work samples for Round 2 include: a QC Report from Project Execution Phase identifying gaps in deliverables with actionable recommendations; a Quality Assurance Status and Improvement Report with recommendations addressing identified risks and issues; and a QC Report evaluating a proposed vendor contract. Work samples may be more than five years old if necessary. The proposer must submit work samples to the Single Point-of-Contact (SPC) Elvis Howard one week prior to the scheduled interview. Interview time slots are available on August 4th, 11th, or 18th, 2026, with proposers required to rank preferred times. Following the interview, the BAFO must be submitted within five business days. Upon successful Round 2 completion, the committee may award a Work Order Contract substantially similar to the Sample Contract and proposed Statement of Work, with potential negotiation of contract terms by the Department of Administrative Services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| iQMS RFQ No. S-44300-00016125 Questions 2026_03_31.pdf | ||
| 6217-25_IQMS RFQ HCI Scheduling Portal v_1.1.docx | DOCX document | |
| Notice of Intent to Award_6217~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
6/22/26 Page 1 of 4
OREGONBUYS BID NUMBER: S-DASOBO-00016125
IQMS HCI Scheduling Portal
ADDENDUM 1
JULY 28TH, 2026
SECTION 1: PURPOSE
The purpose of this addendum is to inform S-DASOBO-00016125 RFQ respondents of Round 1 evaluation results and the next steps in the evaluation process.
Round 1 Results:
The Evaluation Committee evaluated all responsive proposals in accordance with the RFQ. A total of 875 points were available (Note: The Price Proposal was not scored, thus the 225 points for submission, stated in the RFQ, were not included in the referenced total). The compiled proposal scores are listed below:
Table 1: Compiled Proposal Scores
Criterion Points Possible
Score 1 Score 2 Score 3
1. Detailed Approach & Schedule
250 225 222 150
2. Offeror Experience & References
125 90 75 75
3. Personnel Qualifications &
Experience
300 200 180 180
4. Work Examples / DEDs
200 100 120 120
Total 875 615 597 525 Average Score: 579
It has been determined that an additional round of evaluation is necessary. Public Knowledge will proceed to Round 2, which includes submission of additional work samples, an interview, and a Best-and-Final Offer (BAFO).
Round 2 Evaluation:
Round 2 will evaluate the proposer on a pass/fail basis through three required work samples, an interview, and submission of a BAFO Price proposal. The proposer must pass all
Proposer Average Score
Public Knowledge 579
6/22/26 Page 2 of 4 three evaluation criteria to pass round 2 evaluations. The Authorized Purchaser’s evaluation committee members will make a subjective decision whether each criteria passed or failed.
Evaluation Criterion Items to be reviewed Outcome
Work Samples 3.1 QC Report from Project Execution Phase
4.1 Quality Assurance Status
and Improvement Report from Project Execution Phase
3.1.4 QC Review of
Proposed Solution Contract
Follow-up interview
Pass / Fail
Interview Questions See four (4) questions under Table 2
Pass / Fail
Best-and-Final Offer Pass / Fail
Round 2 Outcome All three criteria must be met to pass the overall Round 2 evaluation.
Pass / Fail
Additional work examples:
For Round 2, the Evaluation Committee requests three additional work samples from past or current comparable projects where the proposer has provided quality management comparable to the Services described in the RFQ. The samples must demonstrate the proposer’s ability to deliver specific, actionable recommendations. “Actionable recommendations” means the project team can take clear, concrete steps based on the finding provided and the recommended actions are within project team’s control or are actional by leadership.
Work samples may be more than five (5) years old if necessary to fulfill this request.
Work Sample Requirements:
1. Deliverable 3.1 – QC Report from Project Execution Phase
Must include a review of deliverables such as Requirement Traceability Matrix, Implementation Plan, Technical Design Document, Test Plan, UAT Plan, Interface Control Document, etc. The QC review must identify gaps in deliverables and provide specific, actionable recommendations to address those gaps. This example must reflect QC work performed during the project’s execution phase (i.e., we would like to see a demonstration of QC activities, conducted post solution contractor onboarding).
6/22/26 Page 3 of 4
2. Deliverable 4.1 – Quality Assurance Status and Improvement Report
Must include actionable recommendations related to risks and issues identified during the execution phase. Recommendations that are within the project team’s or leadership control to implement.
3. Deliverable 3.1.4 – QC Report of Proposed Solution Contract
Must include a QC report that evaluates a project’s proposed vendor contract.
Interview:
The three work examples should be emailed to the Single Point-of-Contact (SPC) Elvis Howard one week prior to the scheduled interview. The Evaluation Committee will assess the three work examples on a Pass/Fail basis. Scores from Round 1 will not be used in the Round 2 evaluation.
During the interview, the Committee will ask follow-up questions about the work examples submitted, in addition, following questions will be asked during the interview:
Table 2: Interview Questions
Interview questions Outcome
1. In your experience, what common mistakes do project teams make when onboarding a solution implementation contractor, and what services can you provide to help project team avoid these mistakes?
Pass/Fail
2. What questions do you have about this project (e.g.
agency’s approach, stakeholders, project timeline) that you would ask at the start of IQMS engagement?
Pass/Fail
3. Based on what you already know about the project, where do you see potential gaps, and how can your services address them?
Not Scored
4. What is PK’s capacity to perform independent testing, including performance testing, UAT testing, regression testing, and security penetration testing? What level of support can you provide and what is the estimated cost of that add-on?
Pass/Fail
Round 2 Interview Outcome PASS/FAIL
Schedule Interview:
Following issuance of this Addendum, please contact the SPC to coordinate and schedule the interview. Rank the preferred interview time slots (first, second, and third choice) and notify the SPC, as soon as possible. If a Proposer’s first-choice time slot is no longer available, the SPC will assign the next available time slot based on the Proposer’s ranked preferences and will confirm the scheduled time by email.
6/22/26 Page 4 of 4
Interviews will be conducted virtually. The Proposer interview will be scheduled for 90 minutes.
Interview Time Slots to rank in Proposer’s email to SPC:
• Tuesday, August 4th, 2026, 10:30 - 12pm Pacific Time
• Tuesday, August 11th, 2026, between 2pm - 4pm Pacific Time
• Tuesday, August 18th, 2026, between 10:30am - 3pm Pacific Time
Best-and-Final Offer (BAFO):
Following the interview, the Proposer must submit a BAFO no later than five (5) business days after the interview concludes. The BAFO must be submitted by email to the SPC, with the subject line reading: Best and Final Offer, and document title: Revised Price Proposal Submission and indication of the BAFO (i.e., Revised Price Proposal – Best-and- Final Offer). At the conclusion of round 2, the committee may award a Work Order Contract (WOC) if Consultant successfully demonstrates the best work quality and value quote. The awarded WOC will be in a form substantially similar to the Sample Contract attached to the awarded Consultant’s IQMS Master Price and Services Agreement (“MPSA”) and the proposed Statement of Work (RFQ Exhibit 3). DAS may negotiate contract terms and conditions with the successful Consultant.
CONTRACT AWARD DETERMINATION IS FINAL BASED ON THE SCORES PROVIDED BY
THE EVALUATION COMMITTEE, SUBJECT TO A TIMELY, COMPLIANT AWARD PROTEST
FROM AN ADVERSELY AFFECTED OFFEROR.
The Single Point-of-Contact (SPC) for the procurement remains:
Elvis Howard Procurement and Contract Specialist Elvis.R.Howard@odhsoha.oregon.gov 503-798-2469
Prospective Proposers have until 3:00 PM Pacific Time on the Friday before the meeting to submit written concerns or questions via email only to the SPC regarding the content in Addendum 1 to the RFQ.