This is a Statement of Objectives (SOO) that describes the performance and program objectives for the Integrated Personnel and Pay System - Army (IPPS-A) Project Management Office (PMO) to obtain recommended approaches from industry partners. Key objectives include maintaining the IPPS-A Increment II baseline, supporting functional enhancements, identifying new capabilities, enabling continuous integration/delivery, subsumimg legacy systems, reducing interfaces, improving data architecture, achieving audit compliance, and automating testing and training. The SOO is related to a pre-solicitation for the Managing Army's Human Capital - Innovation, Integration, and Implementation (MAHC III) contract opportunity, which is seeking interested vendors to inform requirements and support continuous IPPS-A development and delivery. The anticipated contract award is set for Q4 FY25, with a one-year base period and six one-year option periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IPPS-A CS BRIDGE PWS V9.0 (REV 20241024).pdf | ||
| IPPS-A MAHC III RFI 20241114.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Army HR & System Support SOO 20241108 i
Integrated Personnel and Pay System – Army
(IPPS-A)
Managing Army’s Human Capital - Innovation, Integration, and Implementation (MAHC III)
Statement of Objectives
Draft 08 November 2024
IPPS-A Project Management Office (PMO) / Product Manager (PdM) IPPS-A Inc II ii
Table of Contents
1.0 Purpose
2.0 Overview
3.0 Current State: Existing/Legacy Environment
3.1 Maintaining the Baseline
3.2 Working the Prioritized Backlog:
3.3 Integration to the Baseline:
4.0 Future State
5.0 Objectives
6.0 Period of Performance
7.0 Place of Performance
1.0 Purpose
This Statement of Objectives (SOO) describes the performance and program objectives for Program Executive Office Enterprise (PEO Enterprise) IPPS-A Project Management Office (PMO) for a continuing requirement for System Integration and Solution Delivery to support Product Manager IPPS-A Increment II (IPPS-A Inc II).
2.0 Overview
The IPPS-A Enterprise Resource Planning (ERP) software suite integrates over 1.1 million Soldiers into a multi-component (Active Army, Army National Guard and U.S.
Army Reserve) personnel and pay system to deliver Total Force visibility to support Readiness, Talent Management, and Auditability. IPPS-A was developed from ORACLE PeopleSoft Suite. IPPS-A will fully integrate more than 30 current systems; eliminating more than 300 interfaces; ensuring secure, consistent processes and data of the military personnel and pay functions for Active Army, Army National Guard, U.S. Army Reserve, West Point Cadets, Reserve Officer Training Corps and Health Professional Scholarship Students into a single system to enhance Army Readiness.
3.0 Current State: Existing/Legacy Environment
The IPPS-A solution and all environments are hosted on premise with the Defense Information Systems Agency (DISA). The program will follow DoDI 5000.87 Operation of the Software Acquisition Pathway. The program uses Oracle PeopleSoft Enterprise Resource Planning commercial-off-the-shelf software to deliver functionality, consisting of the following applications:
• PeopleSoft Human Capital Management (HCM) 9.2
• PeopleSoft HCM 9.2 PeopleSoft Update Manager (PUM) Image 32 (or higher)
• PeopleSoft Customer Relationship Management (CRM) 9.2 PUM Image 16 (or higher)
• PeopleSoft Enterprise Learning Management (ELM) 9.2 PUM Image 17 (or higher)
• People Tools version 8.58 (or higher)
• Oracle database 19c version 12.2.0.3 (or higher)
• Oracle Business Intelligence Enterprise Edition (OBIEE)
The Program environment is comprised of three (3) main elements:
3.1 Maintaining the Baseline
• Includes maintaining the integrity of capabilities and interfaces in the production baseline across all developmental, test, training, and production environments.
• Includes ongoing maintenance, break/fixes, and regression testing as enhancements and new capabilities are added.
• Includes development, integration, and deployment of HR enhancements to complete HR functionality.
3.2 Working the Prioritized Backlog:
• Includes developing innovative and enhanced capabilities and interfaces to deliver continuous value.
• Includes developmental work to subsume 30+ legacy systems.
3.3 Integration to the Baseline:
• Includes integrating innovative and enhanced capabilities, interfaces, and legacy system data that require work, to include new/modified code into the baseline for the release of value-added capabilities.
• Includes integration actions that will add capability to the IPPS-A baseline, including Archive, Talent and Strength Management, Audit, Sponsorship, User Security / Audit Trail, and current Army Military Payroll.
4.0 Future State
At full deployment, the future state total system should provide:
• Single Comprehensive Personnel and Pay Records
• Self-Service Access
• Data Standardization
• Integrated Personnel and Pay
• Strength Management and Accountability
• Personnel Asset Visibility
• Efficiencies Gained by Workflow
• Cross-Component Support
• Business Process Standardization
• Network Integration with Cross-Domain Support.
5.0 Objectives
The objective of this SOO is to obtain recommended approaches from Industry partners on the following:
1) Maintaining the deployed IPPS-A Inc II baseline.
2) Supporting major and minor functional enhancements.
3) Identifying new or enhanced capabilities to integrate into the baseline.
4) Addressing challenges to software code being integrated into the development of mission deployment plans and strategies.
5) Allowing for Continuous Integration / Continuous Delivery (CI/CD), and compliance with Continuous Risk Management Framework (cRMF) using Agile or a recommend improved methodology.
6) Functional and technical development teams and the Army collaborating most efficiently.
7) Executing incremental releases using automated CI/CD pipelines, aligned with the baseline architecture and processes.
8) Preventive and corrective cybersecurity and information assurance to comply with the Continuous Risk Management Framework (cRMF) to provide robust and innovative defense of soldier data.
9) Subsuming applicable legacy systems and eliminating interfaces.
10) Reducing point-to-point interfaces.
11) Simplifying application integration and open application data to enable collaboration and provide innovation via techniques such as Application Programming Interfaces (APIs).
12) Using modern data architecture best practices to improve accessibility, increase high data velocity, increase data throughput for low latency, and reduces reliance on any single technology or vendor.
13) Allowing future Artificial Intelligence and Machine Language utilization.
14) Delivering full audit compliance per the Federal Information Systems Control Audit
Manual and National Institute of Standards and Technology guidelines.
15) Complying with the seven data-centric DoD Data Strategy VAULTIS goals, i.e., making data (1) Visible, (2) Accessible, (3) Understandable, (4) Linked, (5) Trustworthy, (6) Interoperable, and (7) Secure.
16) Developing task automation to reduce or eliminate manual effort while increasing innovation and creativity in problem-solving.
17) Applying Human Centered Design techniques to improve user experience.
18) How to collaborate with functional communities to develop epics, features, and user stories most efficiently.
19) How to provide quality metrics most efficiently for reporting.
20) Integrating testing throughout the entire software development life cycle.
21) Fully automating testing.
22) How to produce training materials and conduct user training most efficiently.
6.0 Period of Performance
The base Period of Performance will be one year from date of award with six, one-year options totaling seven years. The anticipated contract award is set to be in Q4FY25.
7.0 Place of Performance
Contractor performance of work is at the Government’s IPPS-A Program Management Office (PMO) facility and other Continental United States (CONUS) and Outside the Contiguous United States (OCONUS) Government designated facilities.
| 1.0 Purpose |
| 2.0 Overview |
| 3.0 Current State: Existing/Legacy Environment |
| 3.1 Maintaining the Baseline |
| 3.2 Working the Prioritized Backlog: |
| 3.3 Integration to the Baseline: |
| 4.0 Future State |
| 5.0 Objectives |
| 6.0 Period of Performance |
| 7.0 Place of Performance |
File details come from the government source that posted it. Updated .