Intent to Award~27.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Re-bid K21683 I-84 (Westbound) over Union Pacific Railroad Early Geotechnical Drilling
Solicitation number
S-73000-00009939
Issued by
Hood River County, Oregon

About this file

This document appears to be a bid tabulation sheet serving as a notice of intent to award a contract to Western States Soil Conservation Inc. for the I-84 (Westbound) over Union Pacific Railroad bridge replacement project in Hood River, Oregon. The contract requires geotechnical investigation services, including drilling up to ten geotechnical borings. The bid items include administration, mobilization/demobilization, temporary protection and direction of traffic, hollow-stem auger/mud rotary drilling, rock core drilling, undisturbed soil sampling, geotechnical reporting, and standby time. The bid closing date was April 4, 2024.

The total bid amount for Western States Soil Conservation Inc. is $159,150. The contract appears to be funded by the Oregon Department of Transportation, as this is a state-level project. No information is provided about set-asides, incumbents, or funding sources and amounts.

View the file

Other files

File Type Posted
Bid Coversheet~22.docx DOCX document
Bid.Pricing.Form (11)~1.xlsx XLSX spreadsheet
Exhibit A - Specifications~1.pdf PDF
245019 Bid Tabulation.pdf PDF
00009939_Invitation to Bid.docx DOCX document
Sample Contract~39.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:4/4/24
ITB No.S-73000-00009939BIDDER
NAME:Western States Soil Conservation Inc
Bid Closing:April 4, 2024CITY/STATE:
Description:Western States Soil Conservation IncCCB#:
This bid tabulation shall serve as ODOT's notice of intent to award a contract to Western States Soil Conservation Inc.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL

PRICE

1Administration1Lump Sum$0.00$ - 0
2Mobilization/Demobilization1Lump Sum$ 80,000.00$ 80,000.00
3Temporary Protection and Direction of Traffic (TP-DT)4Day$ 2,500.00$ 10,000.00
4Hollow-Stem Auger/Mud Rotary Drilling860Feet$ 75.00$ 64,500.00
5Rock Core Drilling40Feet$ 75.00$ 3,000.00
63” Undisturbed Samples (Shelby Tubes)16Each$ 50.00$ 800.00
7OWRD Geotechnical Hole Reports10Each$ 45.00$ 450.00
8Drums4Each$ 100.00$ 400.00
9Standby4Hours$0.00$ - 0
TOTAL$ 159,150.00