Intent to Award~27.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- S-73000-00009939
- Issued by
- Hood River County, Oregon
About this file
This document appears to be a bid tabulation sheet serving as a notice of intent to award a contract to Western States Soil Conservation Inc. for the I-84 (Westbound) over Union Pacific Railroad bridge replacement project in Hood River, Oregon. The contract requires geotechnical investigation services, including drilling up to ten geotechnical borings. The bid items include administration, mobilization/demobilization, temporary protection and direction of traffic, hollow-stem auger/mud rotary drilling, rock core drilling, undisturbed soil sampling, geotechnical reporting, and standby time. The bid closing date was April 4, 2024.
The total bid amount for Western States Soil Conservation Inc. is $159,150. The contract appears to be funded by the Oregon Department of Transportation, as this is a state-level project. No information is provided about set-asides, incumbents, or funding sources and amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Coversheet~22.docx | DOCX document | |
| Bid.Pricing.Form (11)~1.xlsx | XLSX spreadsheet | |
| Exhibit A - Specifications~1.pdf | ||
| 245019 Bid Tabulation.pdf | ||
| 00009939_Invitation to Bid.docx | DOCX document | |
| Sample Contract~39.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 4/4/24 | ||
| ITB No. | S-73000-00009939 | BIDDER | |
| NAME: | Western States Soil Conservation Inc | ||
| Bid Closing: | April 4, 2024 | CITY/STATE: | |
| Description: | Western States Soil Conservation Inc | CCB#: | |
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to Western States Soil Conservation Inc. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL |
PRICE
| 1 | Administration | 1 | Lump Sum | $0.00 | $ - 0 |
| 2 | Mobilization/Demobilization | 1 | Lump Sum | $ 80,000.00 | $ 80,000.00 |
| 3 | Temporary Protection and Direction of Traffic (TP-DT) | 4 | Day | $ 2,500.00 | $ 10,000.00 |
| 4 | Hollow-Stem Auger/Mud Rotary Drilling | 860 | Feet | $ 75.00 | $ 64,500.00 |
| 5 | Rock Core Drilling | 40 | Feet | $ 75.00 | $ 3,000.00 |
| 6 | 3” Undisturbed Samples (Shelby Tubes) | 16 | Each | $ 50.00 | $ 800.00 |
| 7 | OWRD Geotechnical Hole Reports | 10 | Each | $ 45.00 | $ 450.00 |
| 8 | Drums | 4 | Each | $ 100.00 | $ 400.00 |
| 9 | Standby | 4 | Hours | $0.00 | $ - 0 |
| TOTAL | $ 159,150.00 |