This is an Instructions to Offerors and Evaluation Criteria document for a competitive solicitation for grounds maintenance services at Miramar National Cemetery in San Diego, California (Solicitation 36C78626R50138). The Department of Veterans Affairs National Cemetery Administration is seeking a single contractor through a best value source selection to provide headstone services, turfgrass management, and irrigation management. Offerors must submit complete proposals by July 13, 2026, at 5:00 PM PST to Ralph.Crum@va.gov, including a signed SF 1449, completed price schedule with unit prices entered in column J, acknowledgment of any amendments, and the VAAR 852.219-75 VA Notice of Limitations on Subcontracting certificate. A mandatory vendor site visit is scheduled for June 24, 2026, at 8:30 AM PST at Miramar National Cemetery (5795 Nobel Drive, San Diego, CA 92122), with RSVP required by June 23, 2026, at 3:00 PM PST. All questions must be submitted in writing by June 26, 2026, at 5:00 PM PST.
Proposals will be evaluated using three primary factors: Technical Capability (equal weight), Past Performance (equal weight), with these two non-price factors combined being more important than Price. Technical Capability requires detailed work plans (maximum 20 pages each) addressing headstone services, turfgrass management, and irrigation management, including staffing plans, equipment lists, methodology, key personnel resumes, and relevant licenses and insurance. Past Performance requires submission of at least two completed questionnaires for comparable work performed within the last five years, with federal government contracts weighted more favorably. Offerors must demonstrate minimum staffing of one full-time equivalent per 10.37 acres to meet National Shrine Standards. Pricing offers must remain firm for 60 calendar days from the solicitation closing date, and proposals exceeding available funding for the base period may be rejected. A post-award pre-performance conference will be held prior to work commencement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P07 SCA WD 2015-5635 Rev 30 05132026.pdf | ||
| Solicitation.pdf | ||
| DIGNITY CLAUSE.docx | DOCX document | |
| P07 DBA WD CA20260001 mod 3 05172026.pdf | ||
| Contract Guaranteed Minimum and Maximum Value.docx | DOCX document | |
| PWS 06072026.docx | DOCX document | |
| MIRAMAR NC PriceSched.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E.1 ADDENDUM TO FAR 52.212-1 – INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
Provisions that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation.
A. GENERAL INSTRUCTIONS: This section provides general guidance for preparing the proposal, as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested and must be submitted in accordance with these instructions. Any Offeror who submits an incomplete package may have its proposal considered to be unacceptable and removed from consideration for contract award. The offer shall be compliant with the requirements as stated in the Solicitation. Non-compliance with the instructions to the Solicitation may result in an unfavorable proposal evaluation and may be grounds to eliminate the proposal from consideration for contract award.
Offeror should thoroughly review the specifications and become familiar with the requirement prior to submitting a proposal. Failure to understand the contract shall not relieve the successful Offeror from performing in accordance with the strict meaning and intent of the specifications. In addition, the use of Artificial Intelligence (AI) software to interpret the requirement is strongly discouraged.
Submission of Offerors. Offeror must complete and return a complete package of all items required prior to the time specified in the Solicitation to be considered for award.
Please review the following items before submitting your proposal:
[ ] Have you completed and sign the 1449?
[ ] Have you completed the Price Schedule (Miramar NC_PriceSched)?
[ ] Have you acknowledged any amendment (s), if applicable?
[ ] Have you included the requested information required for responding to the non-price and price evaluation factors?
[ ] Have you completed and signed the VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OFCOMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)?
[ ] Have you submitted two or more completed Past Performance Questionnaires?
B. TYPE OF ACQUISITION: This acquisition is a competitive solicitation. Award will be made to the offeror who represents the best value to the Government.
C. PERIOD OF ACCEPTANCE OF OFFERS: The Offeror agrees to hold prices in its offer firm for a period of sixty (60) calendar days from the closing date of the solicitation.
D. PAST PERFORMANCE: The Government reserves the right to obtain past performance information from any available source and may contact references other than those identified by the Offeror when determining responsibility.
E. POST-AWARD/PRE-PERFORMANCE CONFERENCE: A post-award/pre-performance conference will be scheduled by the Contracting Officer (CO) and held prior to the commencement of any work. The Offeror and/or their duly authorized representative(s) is/are required to attend the post-award/pre-performance conference. The CO and COR shall meet with the Contractor to discuss details of the contract, the Guards sites and schedules, emergency contact information, handbook, and any other information pertinent to the performance of the contract.
F. POINTS OF CONTACT (POC): Written requests for clarification, questions, and/or concerns may be sent to the following:
Ralph Crum Contracting Officer Ralph.Crum@va.gov
G. VENDOR SITE VISIT
A Vendor Site Visit will be held at the Miramar National Cemetery, 5795 Nobel Drive, San Diego, CA 92122.
The Vendor Site Visit will be held in the Cemetery Admin Office on June 24, 2026, at 830AM Pacific Standard Time (PST).
RSVP: Due to the room size limitations, Offerors are encouraged to notify the Contracting Officer of their plan to attend. Notification should include Company Name, Address, Names of Attendees, and Phone No. Attendance Notification should be received by the Contracting Officer and COR via e-mail ralph.crum@va.gov and william.richardson9@va.gov no later than June 23, 2026, at 3PM PST.
Any questions must be submitted via email by June 26, 2026, 5:00 PM PST to: Ralph.Crum@va.gov. All questions shall be addressed via an amendment to the Solicitation.
Safety and Privacy Concerns: Participants should dress in comfortable clothing suited for indoor and outdoor conditions. Closed-toe shoes are encouraged for safety reasons.
NOTE 1: Questions raised during the site visit must be written and will be provided to the Contracting Officer for dissemination to all potential bidders. All questions raised after the site visit must be provided to the Contracting Officer in writing.
H. PROPOSAL SUBMISSION INSTRUCTIONS:
Submission via email to: Ralph.Crum@va.gov Subject line: 36C78626R50138_Company Name Submission deadline: July 13, 2026, 5:00 PM PST
Do not make any changes to the files or the format of the files of the Solicitation and any attachments. Offerors who make any changes without prior written consent from the CO may be eliminated from further consideration.
· It is the Offeror’s responsibility to ensure that documents are complete, and submission is viewable/ readable and arrives to the CO/CS by the date and time required.
· Please complete both the price schedule in the solicitation document as well as the Price Schedule (MIRAMAR NC_PriceSched) (attachment). Please enter your proposed unit prices in column J. A formula will calculate the extended price in column M as well as the totals. Stated period of performance stated on spreadsheet will vary based on date of award.
· Any questions must be submitted via email by June 26, 2026, 5:00 PM PST, to: Ralph.Crum@va.gov. All questions shall be addressed via an amendment to the Solicitation.
· If any required documents are omitted with submission, the offer may be precluded from further consideration.
(End of Addendum to 52.212-1)
E.2 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)
(A) BASIS OF AWARD: This procurement is a best value source selection and is being conducted pursuant to FAR Part 15.103-1 procedures. The Government intends to award a single contract as a result of this solicitation, based on the evaluation factors listed below and whose offer represents the best value to the Government. A contract may be awarded to the offeror whose offer conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required in the Performance Work Statement of this solicitation) and is judged by an overall assessment of the evaluation factors to represent the most advantageous to the Government. As part of making the assessment, a tradeoff analysis will be performed to determine whether exceeding the minimum requirements at an associated price provides the best value to the Government. The Government intends to evaluate offers and award a contract without discussions with offerors. However, the Government reserves the right to conduct discussions at any time if determined by the contracting officer to be in the Government’s interest.
(B) AWARD FOR ALL OF THE WORK. The Government intends to award a single award contract as a result of this solicitation. Offers received for less than the stated number of items listed in the schedule may be considered ineligible for award.
(C) EVALUATION PROCESS: Evaluation Factors. Evaluation of offers will be made using procedures under RFO FAR Part 15.104. Offers will be evaluated in accordance with the following factors and sub-factors:
Factor 1: Technical Capability Factor 2: Past Performance Factor 3: Price
Relative Importance of Evaluation Factors:
Factor (1), Technical Capability, is equal to Factor (2), Past Performance. When combined, the two non-price factors are more important than Factor (3), Price.
FACTOR 1 – Technical Capability: The Offeror shall demonstrate understanding of the requirements of the Performance Work Statement and produce an offer that will meet those objectives. The offer will be evaluated based on the proposed approach to performing the work as listed in the subfactors below. Please provide documentation evidencing:
Subfactor 1a. Headstone Services. In twenty (20) pages or less, Reference PWS 5.1.
1. Provide Work Plan including a clear definitive process on how the Contractor intends to complete the work involved in the Performance Work Statement in accordance with PWS 5.1.
1. Work Plan must include plans for setting and re-setting upright marble headstones.
1. Provide a list of subcontractors and work they will perform. Also include Schedule of Work, staffing plan, and list of equipment/vehicles, methodology /proposed man hours and mitigation of environment issues.
1. Identify mandatory Site Manager to be present whenever work/services are being rendered. Include a 1-page resume with experience, qualifications, certifications, training, roles, and responsibilities for all key personnel.
List the number of employees and their titles/positions that will be on site on any given day and the work they will be assigned. GMC Staffing levels should be at a minimum of 1 full time equivalent (FTE) per 10.37 acres to achieve National Shrine Standards. Include copies of relevant, current licenses, permits, and insurance information.
Subfactor 1b. Turfgrass Management Plan. In twenty (20) pages or less, Reference PWS 5.3.
1. Provide Turfgrass Management Plan showing all turf maintenance operations and application over the course of one year to maintain the turf health and appearance to National Shrine standards in accordance with PWS 5.3.
1. Must include plans for turf renovation, fertilization, mowing, trimming, edging, aerification, and pest control.
1. Turfgrass Management Plan must include plans for vegetation removal, sod preparation, soil amendment, fine grading and sodding and seeding. Provide a detailed description of how the operations are to be performed and rationale for each procedure in the plan.
1. Must include pesticides, herbicides, and fertilizing application schedule, with product Safety Data Sheets (SDS).
Subfactor 1c. Irrigation Management Plan. In twenty (20) pages or less, Reference PWS 5.6.
1. Provide Irrigation Management Plan describing overall experience of the company in performing this work, and qualifications of technical personnel, training, experience, certifications, licenses in accordance with PWS 5.6.
1. Irrigation Management Plan must include plans for irrigation system maintenance and repair.
1. Plan must describe methodologies for water conservation measures utilizing existing irrigation control system and equipment to ensure that irrigation water will be efficiently applied in correct amounts to ensure plant health while reducing water waste.
FACTOR 2 - Past Performance: The Government will evaluate the Past Performance of the Prime vendor (i.e. the offeror) proposed to perform a major portion of the requirement. The past performance evaluation factor assesses the degree of confidence the Government has in an offeror’s ability to supply products and services that meet users’ needs, based on a demonstrated record of performance. For evaluation of Past Performance, the Government may use information from any sources available to it including, but not limited to, other contracting officer’s knowledge of performance, the Contract Performance Assessment Reporting System (CPARS) and the attached Past Performance Questionnaire.
Past performance questionnaire (see attachment in solicitation). Offerors shall provide no less than two (2) relevant past performance information for work performed comparable to the Miramar National Cemetery under contracts completed during the last five (5) years. The Government reserves the right to verify statements and representations made in an offeror's proposal. The offeror may include Federal, State and Local Government and private sector contracts. However, the Government will evaluate contract(s) the offeror has/had with a Federal Government Agency more favorably.
To obtain information, the Government may contact the points of contact listed by offerors, however, the Government is not required to contact the points of contact provided by offerors and may limit the number of references it decides to contact. The Government is also free to contact references other than those provided by the offeror to evaluate past performance of offerors.
Factor 3 – Price. This factor shall be used to assess the reasonableness of the Offeror’s proposed price. For this factor, Offerors shall submit their Price Schedule of Services of this. Offerors are advised that if their proposed price exceeds the amount of funding available for this procurement for the base period of performance, their proposal may be rejected on that basis and be removed from further consideration for contract award.
(D) OPTIONS: The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced or if the proposed price for the basic requirement or any option exceeds the amount of funding available for any of those requirements. Evaluation of options shall not obligate the Government to exercise the option(s).
(End of provision)
File details come from the government source that posted it. Updated .