This document is an instructional guide from Palm Beach County, Florida, detailing the requirements for completing Subcontractor/Subconsultant Schedules 1 through 4 in response to solicitations and during contract performance. The instructions apply to all respondents on projects with an Aspirational Program for Inclusion (API) goal and govern the submission of documentation both at the bid stage and throughout the contract execution period. Prime contractors must submit Schedule 1 with their bids, identifying all subcontractors and subconsultants and confirming their Small Business Enterprise (SBE) certification status, along with the total dollar amount or percentage of work allocated to SBEs. Schedule 2 must accompany the bid for each listed subcontractor or subconsultant, specifying the detailed work to be performed, materials to be supplied, and corresponding costs. These initial schedules establish the baseline subcontracting plan and are mandatory for bids to be considered responsive.

Following contract award, prime contractors must submit Schedule 3 with each payment request, documenting the names of subcontractors, contracted amounts, approved change orders, revised contract amounts, work-period payments, cumulative payments, and subcontractor certification categories. For professional services contracts, Schedule 3(a) is required instead, with the prime indicating the percentage of work performed by its own workforce and listing all sub-consultants with their contract amounts, start dates, cumulative payments, and work completion percentages. Schedule 4, provided as a fillable PDF by the user department, documents actual payments made to each subcontractor or subconsultant and must be signed and notarized by the payee, with separate forms required for each subcontractor and each payment disbursement. These post-award schedules ensure ongoing documentation of subcontractor participation and payment compliance throughout the project lifecycle.

View the file

Other files

File Type Posted
RFP - 26-044-DJ_2-6-3-26.pdf PDF
RFP - 26-044-DJ_1-5-13-26.pdf PDF
RFP_26-044-DJ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev.: 6.17.2025, pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025

INSTRUCTIONS ON COMPLETING

SUBCONTRACTOR/SUBCONSULTANT SCHEDULES 1 – 4*

Respondents must complete and correctly execute the required OEBO Schedules when responding to a solicitation and submitting payment requests after contract award. As long as there is a required API goal, Schedules 1 and 2 must be submitted with all bids or proposals from subcontractors and subconsultants in order to be considered responsive to the solicitation. Following award of the contract, Schedules 3, 3(a), and 4 must be sent along with requests for payment or invoices.

Important Points to Remember

A. Schedule 1 must be completed by the Prime Contractor and submitted with their bid or proposal.

1. All Prime Contractors/Consultants must fully complete Section "A" of this form, regardless of their certification status (Small Business Enterprise (SBE) or Non-SBE).Include the company name, address, contact person, and information, as well as the dollar amount or percentage of work that the prime is responsible for completing.

2. Section “B” of this form must list all Subcontractor(s)/Subconsultant(s) to be utilized on this project. Please check the appropriate box if the Subcontractor(s)/subconsultant(s) is certified as a PBC-OEBO SBE, or if they are Non-SBE.

3. At the very bottom of the Schedule, write down the total bid amount or percentage of work that will be completed by SBE.

4. The Prime or authorized individual must print, sign and date the form.

B. Schedule 2 must be properly executed and submitted with the bid/proposal for all subcontractors/subconsultants listed on Schedule 1.

1. Specify in detail the work to be performed or material supplied, along with the dollar amount or percentage of work for each item and corresponding line item number(s), when available.

2. If there is a portion of the work that will not be performed by the subcontractor/subconsultant, a separate, properly executed Schedule 2 must be submitted for all 2nd and 3rd tier Subcontractors/subconsultants. The original subcontractor/subconsultant must indicate that information in the “red box” located in the middle of the form.

3. All subcontractors/subconsultants must print, sign, and date the form.

C. Schedule 3 is completed by the Prime and submitted with each payment request made to Palm Beach County.

1. In the subcontracting Information section, list the Name(s) of each subcontractor on the project and the total contracted amount for each subcontractor.

2. As the project proceeds, complete each column under the subcontracting Information section accordingly to show, approved change orders, revised contract amounts, amounts drawn this pay period, amounts drawn to date, amounts paid to date and the starting date of the subcontractors.

3. In the Subcontractor Category section, check the appropriate category the represents the type of certification each subcontractor has with Palm Beach County.

4. The Schedule 3 must be signed by the Prime’s designated individual and must include the person's title.

D. Schedule 3(a) is used for professional services contracts only. This Schedule is completed by the Prime and submitted with each payment request made to Palm Beach County.

1. The Prime must complete all of the necessary information, which includes the project name, CSA name and number, contract amounts (original and amended, if applicable), and the Pay Application number.

Rev.: 6.17.2025, pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025

2. The Prime must indicate the percentage of work performed with their own workforce and the amount paid to date.

3. In the “Sub-Consultants” section of the Schedule, the Prime must list the firms’ name and their contract amount. The date when that sub begins their work, the amount paid to date, when applicable, and the percentage of work they have completed by the date of the payment request.

4. The Schedule 3(a) must be signed by the Prime’s designated individual and must include the person's title.

E. Schedule 4 is supplied in a fillable PDF form that allows the Prime to enter the requested information, which is then submitted by the Prime to reflect actual payments made to each subcontractor/subconsultant.

1. The Prime is not to request signature from a Subcontractor/subconsultant unless it has made payment to the Subcontractor/subconsultant.

2. A separate Schedule 4 is required for each Subcontractor/sub consultant.

3. A separate Schedule 4 is required for each contract and payment request in which a disbursement has been made to a subcontractor or sub consultant.

4. A fillable pdf Schedule 4 will be emailed to the prime contractor by the user department. The user department will pre-fill the spaces on the form that pertain to the Department number, project number, and Prime contractor’s vendor code.

5. The Prime will type in the Subcontractor/sub consultant name, payment amount, work order number, if applicable, payment date, and Subcontractor/sub consultant vendor code in the fillable form fields.

Subcontractor/sub consultant vendor codes can be found through the OEBO website at Error!

Hyperlink reference not valid..

6. The Prime will either print the form for the Subcontractor/subconsultant to sign and have notarized, or send the form electronically for digital signature and notarization, if possible, verifying that the information is correct. The Subcontractor/subconsultant must provide information as to whether a portion of the payment received will be disbursed to another Subcontractors/sub consultant. If the Subcontractor/subconsultants indicates that a portion of their payment will be disbursed to 2nd or 3rd tier sub, a separate Schedule 2 must be submitted for the Subcontractor/sub consultant listed.

7. The original completed Schedule 4 is submitted to Palm Beach County with the Prime's payment request documents.

http://www.pbcgov.com/osba/vendordirectory.htm http://www.pbcgov.com/osba/vendordirectory.htm

INSTRUCTIONS ON COMPLETING
SUBCONTRACTOR/SUBCONSULTANT SCHEDULES 1 – 4*
Important Points to Remember