Installation SOW - TSM Spectrum Protect Storage Hardware.docx
DOCX document 22 KB Posted
- Solicitation number
- BPM029501
- Issued by
- Baltimore County, Washington County, Point of Rocks CDP, Maryland
About this file
This document is a Scope of Work for the installation and configuration of IBM Spectrum Protect storage hardware at two Department of Public Safety and Correctional Services (DPSCS) facilities in Pikesville and Hagerstown, Maryland. The Contractor shall provide up to 150 hours of installation and configuration services at each location, including physical hardware installation, Spectrum Protect SAN storage configuration, data migration, and data replication between sites. The Contractor must be an IBM Premier Business Partner with at least 10 years of experience with IBM storage systems and certifications in IBM Spectrum Protect and Spectrum Protect Plus.
This is a designated Small Business Reserve (SBR) solicitation with a 10% Minority Business Enterprise (MBE) goal, open only to DOIT Hardware 2012 Master Contractors for IBM. The contract will be awarded to a single bidder. No information is provided regarding pricing terms, incumbent contractors, funding sources, or renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Master Contractors.xlsx | XLSX spreadsheet | |
| TSM Spectrum - Hardware PORFP.pdf | ||
| PORFP Q00P2602836 Bid Sheet.xlsx | XLSX spreadsheet | |
| Amendment 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK - INSTALLATION
3.1 Background and Purpose
The State is issuing this solicitation for the purpose of upgrading the IBM storage hardware at two facilities (Pikesville data center - 6776 Reisterstown Road, Suite 209 Baltimore, MD 21215 and Hagerstown disaster recovery site - 8601 Roxbury Road, Hagerstown, MD 21746) for the Department of Public Safety and Correctional Services. Services to be rendered are described in detail in this specification.
3.2 Requirements
The Contractor shall provide all labor, materials, supplies, services, permits, equipment, devices and any and all other items necessary for or incidental to the installation, configuration, and data migration, of IBM Spectrum Protect storage hardware, as needed.
1) Contractor must currently be an IBM Premier Business Partner
2) Contractor must have a minimum ten (10) years of experience with the following:
a. Provisioning, configuring, administering and troubleshooting IBM storage systems.
b. Provisioning, configuring, administering and troubleshooting IBM Spectrum Protect and IBM Spectrum Protect Plus
3) Service provider must have the following technical certifications from IBM:
a. IBM Business Partner Storage – Enterprise Storage – Technical Advocate v1
b. IBM Certified Deployment Professional – Spectrum Protect v8.1.6
c. IBM Certified Deployment Professional - Spectrum Protect Plus v10.1.5
3.3 Scope of Work
3.3.1 The Contractor shall provide up to 150 hours of installation and configuration services for all of the IBM components listed in Exhibit A at the Pikesville location.
3.3.2 The Contractor shall provide up to 150 hours of installation and configuration services for all of the IBM components listed in Exhibit A at the Hagerstown location.
3.3.3 The Contractor shall install the physical hardware listed in Exhibit A at Pikesville data center and Hagerstown disaster recovery site.
3.3.4 The Contractor shall configure the Spectrum Protect SAN Storage at Pikesville and Hagerstown locations.
3.3.5 The Contractor shall be responsible for the data migration from temporary network storage devices (NAS) to the newly installed Spectrum SAN Storage.
3.3.6 The Contractor shall configure data replication from Pikesville location to the Hagerstown disaster recovery location. Contractor shall remove tape library from offsite tape process. All data and TSM backups shall be configured to send to the Hagerstown disaster recovery site.
3.3.7 The Contractor shall work with DPSCS Server Team staff during all phases from physical installation through final configurations to turn over critical install and support information. Contractor shall provide knowledge transfer of the systems and system documentation.
3.4 Security Requirements
3.4.1 Employee Identification
(a) Each person who is an employee or agent of the Contractor or subcontractor shall display his or her company ID badge at all times while on State premises. Upon request of authorized State personnel, each such employee or agent shall provide additional photo identification.
(b) At all times at any facility, the Contractor’s personnel shall cooperate with State site requirements that include but are not limited to being prepared to be escorted at all times, providing information for badge issuance, and wearing the badge in a visual location at all times.
3.4.2 Information Technology
(a) Contractors shall comply with and adhere to the State IT Security Policy and Standards. These policies may be revised from time to time and the Contractor shall comply with all such revisions. Updated and revised versions of the State IT Policy and Standards are available online at: https://doit.maryland.gov/policies/Pages/20-07-IT-Security-Policy.aspx.
(b) The Contractor shall not connect any of its own equipment to a State LAN/WAN without prior written approval by the State. The Contractor shall complete any necessary paperwork as directed and coordinated with the Contract Monitor to obtain approval by the State to connect contractor-owned equipment to a State LAN/WAN.
Exhibit A - Equipment list
IBM Storage Hardware (Pikesville)
2072-3N4 #2 : FlashSystem 5035 SFF Control Enclosure
| FS 5035 SFF Control |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-0000 |
| 1 |
| FS50X5 FLASH COPY UPGRADE |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1852 |
| 1 |
| FS50X5 REMOTE MIRRORING FEAT |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1853 |
| 1 |
| FS50X5 EASYTIER FEATURE |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1854 |
| 1 |
| Power Cord - PDU Connection |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-9730 |
| 1 |
| Order Type 1 - CTO |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ADN1 |
| 1 |
| AC Power Supply High Efficiency (Pair) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AHPA |
| 1 |
| Hybrid Flash Indicator |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AHZE |
| 1 |
| 1.92TB 12 Gb SAS 2.5 Inch Flash Drive |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AL80 |
| 4 |
| 16 Gb FC 4 Port Adapter Cards (Pair) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALBB |
| 1 |
| Encryption Enablement |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALE1 |
| 1 |
| Encryption USB Flash Drives (Four Pack) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALEC |
| 1 |
| Storwize V5000E Cache Upgrade |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALGA |
| 1 |
2072-3N4 #1: 2072-92G #2:FlashSystem 5000 HD LFF Expansion Enclosure
| 5000 HD LFF Expansion |
| IBM FlashSystem 5000 equipment |
| 2072-92G-0000 |
| 1 |
| 3m 12 Gb SAS Cable (mSAS HD to mSAS HD) |
| IBM FlashSystem 5000 equipment |
| 2072-92G-ACUC |
| 2 |
| Order Type 1 - CTO |
| IBM FlashSystem 5000 equipment |
| 2072-92G-ADN1 |
| 1 |
| Power Cord - PDU High Density Expansion |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AHP5 |
| 1 |
| Hybrid Flash Indicator |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AHZE |
| 1 |
| 8 TB 7,200 rpm 12 Gb SAS NL 3.5 Inch HDD |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AL48 |
| 92 |
IBM Storage Hardware (Hagerstown)
2072-3N4 #2 : FlashSystem 5035 SFF Control Enclosure
| FS 5035 SFF Control |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-0000 |
| 1 |
| FS50X5 FLASH COPY UPGRADE |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1852 |
| 1 |
| FS50X5 REMOTE MIRRORING FEAT |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1853 |
| 1 |
| FS50X5 EASYTIER FEATURE |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-8S1854 |
| 1 |
| Power Cord - PDU Connection |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-9730 |
| 1 |
| Order Type 1 - CTO |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ADN1 |
| 1 |
| AC Power Supply High Efficiency (Pair) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AHPA |
| 1 |
| Hybrid Flash Indicator |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AHZE |
| 1 |
| 1.92TB 12 Gb SAS 2.5 Inch Flash Drive |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-AL80 |
| 8 |
| 16 Gb FC 4 Port Adapter Cards (Pair) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALBB |
| 1 |
| Encryption Enablement |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALE1 |
| 1 |
| Encryption USB Flash Drives (Four Pack) |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALEC |
| 1 |
| Storwize V5000E Cache Upgrade |
| IBM FlashSystem 5035 equipment |
| 2072-3N4-ALGA |
| 1 |
2072-3N4 #1: 2072-92G #2:FlashSystem 5000 HD LFF Expansion Enclosure
| 5000 HD LFF Expansion |
| IBM FlashSystem 5000 equipment |
| 2072-92G-0000 |
| 1 |
| 3m 12 Gb SAS Cable (mSAS HD to mSAS HD) |
| IBM FlashSystem 5000 equipment |
| 2072-92G-ACUC |
| 2 |
| Order Type 1 - CTO |
| IBM FlashSystem 5000 equipment |
| 2072-92G-ADN1 |
| 1 |
| Power Cord - PDU High Density Expansion |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AHP5 |
| 1 |
| Hybrid Flash Indicator |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AHZE |
| 1 |
| 8 TB 7,200 rpm 12 Gb SAS NL 3.5 Inch HDD |
| IBM FlashSystem 5000 equipment |
| 2072-92G-AL48 |
| 92 |
File details come from the government source that posted it. Updated .