Infrastructure BPA Price List.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Infrastructure Services Hill AFB, UT - Blanket Purchase Agreement (BPA)
Solicitation number
FA8201-26-R-0008
Issued by

About this file

This is a pricing template for an Infrastructure BPA at Hill Air Force Base, Utah. The document establishes a Not To Exceed (NTE) price list structure for a three-year Blanket Purchase Agreement covering communications infrastructure support services. All prices must comply with Service Contract Labor Standards and prevailing wage rates applicable to the work location.

The price list includes labor categories for Project Manager, Supervisor, Technician I, and Technician II, with separate hourly and overtime rates for the base year and two option years. Materials and equipment pricing covers data and communications infrastructure components including copper and fiber optic cabling (Cat 6 unshielded and shielded twisted pair, fiber optic riser cable), cable management systems (cable tray, equipment racks, patch panels), grounding equipment, underground duct systems, and installation services such as concrete core drilling, asphalt and concrete cutting and resurfacing, trenching, cable splicing, and firestop sealing. The template provides columns for unit pricing in various measurement formats (each, hourly, square foot, and linear foot) across the base year and two option years. All pricing cells are currently blank and marked as "PROTECTED," indicating this is a template awaiting contractor cost submissions. Contractors responding to solicitation FA8201-26-R-0008 are expected to populate this price list with fully burdened costs for consideration in the multiple award BPA evaluation for Hill AFB, Little Mountain, and Utah Test & Training Range locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 All prices must be in compliance with the Service Contract Labor Standards and prevailing wage rates. All Wage rates must be in compliance based on the area in which work is being performed. All prices on this list are Not To Execede Prices (NTE) and are fully burdened.

ENTER COSTS HEREPROTECTED
Price ListBase Year 1Year 2Year 3
LaborHourlyOvertimeHourlyOvertimeHourlyOvertime
Project Manager$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Supervisor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
materialsUnitHourlyEachSq footLinear footHourlyEachSq FtLinear FootHourlyEachSq FtLinear Foot
1000' Box Cat 6 unshielded twisted pairEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1000' Box Cat 6 shielded twisted pair$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Tray (12" wide)LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Data: Equipment Rack 19"EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Backboard 4 X 8 X 3/4"EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
EMT(2) 1" W/ HardwareLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ground Rod and ConnectionEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Block: 110 Type, 100 PREA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grounding Busbar, Stand off Isolators, Crimp ConnectorsEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
66 M150 Block$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FO SC Patch PNL 12 SM W/CPLRSEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FO SC Patch PNL 48 SM W/CPLRSEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FOC-SM Riser Cable: 12 StrandLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Firestop Sealant Per 4" HoleEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Outlet: Dual RJ45EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Outlet: Dual RJ45 W/FO(SC)EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Patch PNL, RJ45 CAT 6, 48 PortEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Protected Terminal: 25 PREA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Protected Terminal: 50 PREA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riser: 25 PR Inside Plant CableLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
STA Cable: CAT 6 UTP (4 PR)LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
STA Cable: Fiber Optic (2 MM Strand)LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Concrete Core Drill 1" DiameterEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Concrete Core Drill 4" DiameterEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cut & Resurface Asphalt 4"SF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cut & Resurface Concrete 4"SFSF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabric-Mesh Inner Duct, 3 X 3-CellLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handhole Precast 4 X4 X4EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
InnerDuct 1-1"LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
InnerDuct 4-1"LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Trench Backhoe 24"X 36"LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UG Duct 1 WayLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UG Duct 2 WayLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UG Duct 4 WayLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UG Duct 4 Way Concrete ENCLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Trenched: 12 PR, 22 AWGLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Trenched: 25 PR, 22 AWGLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Trenched: 200 PR, 22 AWGLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable UG Pairs SplicedPR$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable UG Splice Case stainless steelEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FOC UG Splice: 12 StrandEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FOC UG Splice: 24 StrandEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .