INF Mammoth Janitorial RFQ SOI EF SOW Ps Cs (For GPoE).docx

DOCX document 989 KB Posted

Attached to
Inyo National Forest, Mammoth Ranger Station Janitorial Services
Solicitation number
127EAS24Q0024
Issued by

About this file

This is a request for quotation (RFQ) for janitorial services at the Inyo National Forest's Mammoth District Office in California. The solicitation seeks cleaning of restrooms, floors, offices, break rooms and other spaces totaling approximately 8,400 square feet. Required services include cleaning restrooms, floors, windows, mini blinds and an auditorium on various schedules. The performance period is one base year with four optional one-year periods. The solicitation is set aside for small businesses and provides pricing schedules to submit fixed unit prices for cleaning tasks. Quotes are due by February 23, 2024. The award will be a firm fixed price contract to the responsible offeror providing the best value based on technical approach, past performance and price factors.

View the file

Other files

File Type Posted
Q and A doc.docx DOCX document
INF Mammoth Janitorial RFQ SOI EF SOW Ps Cs A00003 (For GPoE).docx DOCX document
INF Mammoth Janitorial RFQ SOI EF SOW Ps Cs V2 (For GPoE).docx DOCX document
Capability Questionnaire.docx DOCX document
SAM WD INYO 15-5669.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

127EAS24Q0024

Southwestern Region Inyo National Forest, Mammoth Ranger Station Janitorial Services

This is a combined synopsis/solicitation for commercial services prepared in accordance with (IAW) the format prescribed in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

Solicitation 127EAS24Q0024 is issued as a request for quote (RFQ).

This procurement is being issued as a 100% SMALL BUSINESS SET ASIDE.

North American Industrial Classification Standard (NAICS) 561720, Size standard of $22 Million.

This solicitation document incorporates provisions and clauses of those in effect through Federal Acquisition Circular 2024-01 and Agriculture Acquisition Regulation (AGAR) last updated 11 March 2021. The result of this requirement will be a firm fixed priced (FFP) contract.

ATTACHMENTS:

1. Schedule of Items (SOI)

2. Evaluation Criteria

3. SOW

4. RFQ Provisions and Clauses

5. Wage Determination

6. Capability Questionnaire

CONTRACTOR MUST SUBMIT:

1. Completed and Signed SOI

2. Capability Questionnaire

3. Reps and Certs

· Please see evaluation criteria attachment for further information.

There will be a site visit for this requirement on 16 February 2024 at 1000 PST. All wishing to attend the site visit will meet at the Inyo National Forest’s Mammoth District Office 2510 Main Street, Mammoth Lakes, CA 93546. Please RSVP for the site visit by emailing perry.rinato@usda.gov.

All questions pertaining to this acquisition shall be asked no later than, 19 February 2024 at 10:00AM, PST. Questions shall be sent to Perry Rinato via email at perry.rinato@usda.gov. Email must be titled, “127EAS24Q0024 – RFQ Question”.

It is the responsibility of the offeror to view the website for any changes or amendments to this RFQ.

Quotes are due to Perry Rinato via email at perry.rinato@usda.gov no later than, 23 February 2024 at 10:00AM, PST. Quote emails must be titled, “127EAS24Q0024 – RFQ Submission”.

Schedule of Items/Price Schedule

SCHEDULE OF ITEMS

PROJECT
INF, Mammoth Ranger Station Janitorial
UNIT
Southwest Zone
SOL #
127EAS24Q0024
ITEM NO.
DESCRIPTION
UNIT of ISSUE
UNIT QTY
UNIT PRICE
TOTAL PRICE
0001
Public Restroom Tasks

Memorial Day weekend (May) through Columbus Day weekend (October)

Month
12
$_________
$_________________
0002
Public Restroom Tasks

Columbus Day weekend (October) to Memorial Day weekend (May)

Month
12
$_________
$_________________
0003
Unisex Restrooms Regular Tasks.
Month
12
$_________
$_________________
0004
Unisex Restrooms: Strip And Wax Floor
Year
1
$_________
$_________________
0005
General Office Tasks
Month
12
$_________
$_________________
0006
Window Cleaning
Quarter
4
$_________
$_________________
0007
Mini Blinds Cleaning
Semi- annually
2
$_________
$_________________
0008
Auditorium

Memorial Day Weekend (May) Through Columbus Day Weekend (October)

Month
12
$_________
$_________________
0009
Auditorium

Columbus Day Weekend (October) To Memorial Day Weekend (May)

Month
12
$_________
$_________________
0010
AUDITORIUMVacuum Stage, Sweep And Mop Auditorium Floor.
Month
12
$_________
$_________________
Base Year Total:
$_________________
1001
Public Restroom Tasks

Memorial Day weekend (May) through Columbus Day weekend (October)

Month
12
$_________
$_________________
1002
Public Restroom Tasks

Columbus Day weekend (October) to Memorial Day weekend (May)

Month
12
$_________
$_________________
1003
Unisex Restrooms Regular Tasks.
Month
12
$_________
$_________________
1004
Unisex Restrooms: Strip And Wax Floor
Year
1
$_________
$_________________
1005
General Office Tasks
Month
12
$_________
$_________________
1006
Window Cleaning
Quarter
4
$_________
$_________________
1007
Mini Blinds Cleaning
Semi- annually
2
$_________
$_________________
1008
Auditorium

Memorial Day Weekend (May) Through Columbus Day Weekend (October)

Month
12
$_________
$_________________
1009
Auditorium

Columbus Day Weekend (October) To Memorial Day Weekend (May)

Month
12
$_________
$_________________
1010
AUDITORIUMVacuum Stage, Sweep And Mop Auditorium Floor.
Month
12
$_________
$_________________
Option Period - One Total
$_________________
2001
Public Restroom Tasks

Memorial Day weekend (May) through Columbus Day weekend (October)

Month
12
$_________
$_________________
2002
Public Restroom Tasks

Columbus Day weekend (October) to Memorial Day weekend (May)

Month
12
$_________
$_________________
2003
Unisex Restrooms Regular Tasks.
Month
12
$_________
$_________________
2004
Unisex Restrooms: Strip And Wax Floor
Year
1
$_________
$_________________
2005
General Office Tasks
Month
12
$_________
$_________________
2006
Window Cleaning
Quarter
4
$_________
$_________________
2007
Mini Blinds Cleaning
Semi- annually
2
$_________
$_________________
2008
Auditorium

Memorial Day Weekend (May) Through Columbus Day Weekend (October)

Month
12
$_________
$_________________
2009
Auditorium

Columbus Day Weekend (October) To Memorial Day Weekend (May)

Month
12
$_________
$_________________
2010
AUDITORIUMVacuum Stage, Sweep And Mop Auditorium Floor.
Month
12
$_________
$_________________
Option Period - Two Total
$_________________
3001
Public Restroom Tasks

Memorial Day weekend (May) through Columbus Day weekend (October)

Month
12
$_________
$_________________
3002
Public Restroom Tasks

Columbus Day weekend (October) to Memorial Day weekend (May)

Month
12
$_________
$_________________
3003
Unisex Restrooms Regular Tasks.
Month
12
$_________
$_________________
3004
Unisex Restrooms: Strip And Wax Floor
Year
1
$_________
$_________________
3005
General Office Tasks
Month
12
$_________
$_________________
3006
Window Cleaning
Quarter
4
$_________
$_________________
3007
Mini Blinds Cleaning
Semi- annually
2
$_________
$_________________
3008
Auditorium

Memorial Day Weekend (May) Through Columbus Day Weekend (October)

Month
12
$_________
$_________________
3009
Auditorium

Columbus Day Weekend (October) To Memorial Day Weekend (May)

Month
12
$_________
$_________________
3010
AUDITORIUMVacuum Stage, Sweep And Mop Auditorium Floor.
Month
12
$_________
$_________________
Option Period - Three Total
$_________________
4001
Public Restroom Tasks

Memorial Day weekend (May) through Columbus Day weekend (October)

Month
12
$_________
$_________________
4002
Public Restroom Tasks

Columbus Day weekend (October) to Memorial Day weekend (May)

Month
12
$_________
$_________________
4003
Unisex Restrooms Regular Tasks.
Month
12
$_________
$_________________
4004
Unisex Restrooms: Strip And Wax Floor
Year
1
$_________
$_________________
4005
General Office Tasks
Month
12
$_________
$_________________
4006
Window Cleaning
Quarter
4
$_________
$_________________
4007
Mini Blinds Cleaning
Semi- annually
2
$_________
$_________________
4008
Auditorium

Memorial Day Weekend (May) Through Columbus Day Weekend (October)

Month
12
$_________
$_________________
4009
Auditorium

Columbus Day Weekend (October) To Memorial Day Weekend (May)

Month
12
$_________
$_________________
4010
AUDITORIUMVacuum Stage, Sweep And Mop Auditorium Floor.
Month
12
$_________
$_________________
Option Period - Four Total
$_________________
Base +4 OY TOTAL
$_________________
NOTES
1. Responses for quantities less than those listed in the numbered items may be rejected

2. Responses without prices for each item and sub-item may be rejected.

PRICE SUBMITTED BY

Signature

Phone:

Vendor

Fax:

Address

Email:

Cage Code

POC:

UEI

Evaluation Criteria and Instructions for Quote Submission

The Government intends to award a firm fixed price contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

The Government will evaluate proposals using a tradeoff process to determine the best value to the Government. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to determine a quote the most advantageous based upon the evaluation factors specified in the solicitation.

The evaluation factors for this acquisition are: (1) Technical capability, (2) Past Performance, and (3) Price. The Government may perform a comparative evaluation (comparing offers to each other) to select the contractor that provides the best value, considering the evaluation factors in this solicitation.

The Government will evaluate quotes based on the perceived value of the proposed technical capability and past performance, as well as the proposed price.

The Technical Capability factor will be evaluated based on the offeror’s understanding of the requirements, the soundness of the proposed approach, and the feasibility of successfully completing the contract within the required timeframe. The contractor shall identify the methods for completing work identifying and explaining how the contractor will develop the required outcomes of the SOW.

The Past Performance factor will be evaluated based on the offeror’s recent and relevant experience providing similar services to those required by this solicitation. To rate past performance, the contractor shall provide a list of no more than 3 projects of a similar nature that they have completed, and provide points of contact and contract information for the end users of the projects.

The Government reserves the right to make an award to other than the lowest priced quote or other than the highest technically rated offeror if it is determined to be in the best interest of the Government. The Government will make a best value determination by considering the relative importance of price and non-price factors, as well as any tradeoffs made among those factors.

Offerors that do not submit all sections of evaluation factors may not be considered for contract award. Responses should be submitted on the most favorable terms that the offeror could make to the Government.

The Government reserves the right to reject any or all offers or to make award without conducting negotiations.

Evaluation of Options Exercised at Time of Contract Award.

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

Statement of Work Inyo National Forest, Mammoth Ranger Station Janitorial Services

Scope:

Description of Work: The intent of this contract is to secure janitorial services and supplies, including, but not limited to, the cleaning of restrooms, floors, office areas, break rooms, and other office spaces at the Inyo National Forest’s Mammoth District Office. The district office building is approximately 8,400 square feet and includes the following spaces:

· one unisex restroom with one lavatory, one toilet, and one urinal on the second floor

· one unisex restroom with two lavatories and two toilets on the first floor

· one public men’s restroom with three lavatories, two toilets, and 2 urinals

· one public women’s restroom with three lavatories and three toilets

· a break room

· a conference room

· three water fountains

· an auditorium

· three staircases

· one covered breezeway

Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

The contractor must be able to respond to emergency call back within 1 hour for any health and safety issues.

Frequency and Method of performance will be determined by the contractor based on the needs of the Government. Performance measurements will be based on the Governments evaluation of results, not the frequency or method of performance. The evaluation of results will be based on tenant satisfaction, surveys, inspections, quality control review, and best trade practices.

Project Location & Description:

Location: The project is located on the Inyo National Forest, Mammoth Lakes District Office located at 2510 Main Street, Mammoth Lakes, CA 93546.

Description: This office is located in Mammoth Lakes, CA. From the intersection of Main Street (CA State Highway 203) and Old Mammoth Road proceed east on Main Street for approximately 0.5 miles. The Mammoth District Office is located next to the Mammoth Lakes Welcome Center and is opposite of the Mammoth Mountain RV Park. The address is 2510 Main Street, Mammoth Lakes, CA 93546.

Exclusions (Non-Work Areas): Areas that the contractor is not granted access to include the IT network room.

Accessibility: The building is accessible by passenger car. The building is divided into two floors, ADA lift access is available to the second floor.

Any prospective contractor desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Maps:

Any maps included are general in nature and are not to be considered as definitively identifying locations.

Estimated Start Date & Contract Time:

Estimated Start Date: 1 March 2024 through 28 February 2025. Three (3) optional 12-month periods running consecutively from 1 March 2025 through 28 February 2029 are included as option items.

Number of Calendar Days Required: 365 days between 1 March 2024 through 28 February 2029. The four option years have 365 days each (except option year 3 with 366 days).

Cleaning Schedule will be determined by contractor, but cleaning expectations are to enter a clean building daily. (Excluding Federal holidays.) Submission of Schedule to the Contracting Officer’s Representative (COR) for approval prior to commencement of work is required.

Restrictions on Work:

Work may be performed at any time during the period of the contract, except as outlined here. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:

1. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

2. Work shall not be performed between the business operation hours of 8 A.M. and 5 P.M.

3. Acceptable hours to perform work are between 5 P.M. and 8 A.M.

Expectation of Performance:

The building and its occupants value a professional appearance and the environment provided by having a high level of cleanliness reflects on the wellbeing of the occupants. Basic requirements for all applicable areas are described below. Following each task is the Government’s quality standards, which define the expectation of performance. Each task is to be performed utilizing best industry practices. Throughout the course of the regular services the Contractor or their representatives should take note of the building maintenance and security issues and report them the Contracting Officer or Contracting Officer Representative.

General Conduct:

All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the Contractor to remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment or any Government-owned property.

The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance and integrity, and shall be responsible for taking such disciplinary action with respect to the employee(s) as may be necessary.

The Contractor shall prohibit his/her employees from disturbing papers on desks, opening desk drawers or cabinets, or using telephones or office equipment provided for official Government use.

The Contractor will be notified of non-compliance and will be requested to correct the condition at the Contractor’s expense.

Camping and Housing: Camping is not permitted in US Forest Service campgrounds. Contractor will not be permitted to camp elsewhere on US Forest Service land.

Specific Conduct:

The following restrictions apply to the Contractor and his/her employees:

a. Smoking: The Mammoth Ranger District office is a non-smoking building. The Contractor shall not smoke inside the building.

b. Gambling: The Contractor shall not participate in games for money or personal property while on Government property.

c. Alcoholic Beverages and Narcotics: The Contractor shall not be under the influence of, use, or be in possession of any narcotic drug, hallucinogenic, marijuana, barbiturate, amphetamine or alcohol while entering on or on Government property. This prohibition shall not apply in cases where the drug is being used as prescribed for a patient by a licensed physician.

d. Soliciting or Vending: The Contractor shall not solicit or sell any items while on Government property.

e. Firearms: The Contractor shall not be in possession of any firearms.

Security of Premises:

Contractor shall be responsible for securing premises upon completion of each service. Contractor shall take the necessary precautions to assure that his/her employees do not leave exterior doors or windows open upon entry to, during performance of services, and/or exiting from the building. (Only contractor and employees are allowed in the building outside of normal business hours.)

Contractor shall report to the Contracting Officer any instance (by specific locations) of having to perform lockup, to turn on exterior lights or to shut windows.

Contractor shall also report any plugged toilets, sinks, or drinking fountains to the Contracting Officer and to place an “Out of Order” sign on broken facilities.

Lights shall be turned off after each room or area has been serviced.

Licenses and Insurance:

Worker's Compensation Insurance: The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

Technical Requirements:

Special care shall be taken in cleaning the marmoleum tile surfaces, located on both floors of the District Office. The contractor is required to clean the marmoleum floors with a pH neutral cleaner. The use of ammonia, harsh alkalis, or high pH agents is forbidden. Appropriate cleaners are still required to meet the Green seal products standards (https://www.greenseal.org/products-services/).

Environmentally Preferable Products:

The Inyo requires the use of environmentally preferable products and services in order to comply with federally mandated programs and USDA’s Agriculture Acquisition Regulation (AGAR 723.703) that direct USDA Agencies to actively promote a preference for Environmentally Preferable products: alternative fuels and fuel efficiency, bio-based products; non-ozone depleting substances; priority chemicals; and environmentally preferable products. The products are described on the Office of the Federal Environment Executive website (http://www.ofee.gov/gp/gp.asp)

Products and Materials:

Custodial cleaning products required in the performance of the SOW shall meet as a minimum, Green seal Products Standards (http://www.greenseal.org/certification/environmental.cfm ). If it is determined that a product does not meet Government performance requirements, the contractor shall submit a proposed alternative that would meet the performance requirements, the contractor shall submit a proposed alternative that would meet the performance requirements with the lowest environmental impact for evaluation and acceptance.

Follow this link to see a current list of cleaning products that currently meet the EPA requirements. http://www.greenseal.org/findaproduct/index.cfm

Products that full under the EPA comprehensive Procurement Guidelines (CPG) (http://www.epa.gov/cpg) shall meet the minimum recovered (recycled) content.

Bio-based products shall be used upon issuance of the bio-based product listing from the United States Department of Energy’s Federal Energy Management Program (FEMP) Product Energy Efficiency Recommendations product list. Supplements of amendments to listed publications for many organizational level may be issued during the life of the contract.

Conduct:

All work under this contract shall be performed in a skillful and workman like manner. The contracting officer may, in writing, require the contractor to remove from the work any employee they deem incompetent and/or careless, find in unauthorized possession of materials, supplies, equipment, or any government owned property.

The contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity, and shall be responsible for taking such disciplinary action with respect to the employee(s) as may be necessary.

The contractor shall prohibit his/her employees from disturbing papers on desks, opening desk drawers or cabinets, or using telephones or office equipment provided for official government use.

The contractor will be notified of non-compliance and will be requested to correct the condition at the contractor's expense.

The contractor will not be allowed to have any persons (family members or otherwise) under the age of 16 years on the premises to either work or accompany the contractor or his/her employees during performance of the contract.

The specifications and performance objectives are described below along with the schedule for work. Cleaning tasks haven been scheduled either daily, weekly, monthly, quarterly, or semiannually.

The contractor shall place an "out of order'' sign on any plugged or otherwise inoperable toilets, sinks or drinking fountains and report it to the contracting officer.

Security of Premises:

a. The contractor shall be responsible for securing premises upon completion of each service. The contractor shall take the necessary precautions to assure that his/her employees do not leave exterior doors open during performance of services and/or exiting from the building. Only the contractor and the contractor's employees are allowed in the building outside of normal business hours.

i. Turn off lights in all rooms upon exiting.

ii. Before leaving buildings, check all exterior entrance/exit doors. If doors are not locked, the Contractor shall lock them.

iii. Once a week (as determined by the COR) turn into the COR a signed checklist of duties performed.

Specifications and Performance Objectives/Required Results:

This is a performance-based contract that expresses the Governments requirements in the form of minimum quality standards to be met. The Contractor must determine the optimal work schedule, frequency, resource allocations and performance methods (not standards). The contractor’s performance will be evaluated based upon the Governments Quality Assurance Plan (QAP), which includes the written inspections, customer surveys, service call logs, contractor/tenant meetings, and review of reports and logs. The QAP will service as a guide for all parties involved ensuring that tenants and the Government receive the service paid for and specified in this contract.

This schedule for estimating purposes based on past history of what has occurred and assist in Government inspections of the work. In some cases, the frequency of required cleaning may be more or less based on use and other factors. This is for Government inspection purposes to guide the Quality Assurance Program. The frequencies do not relive the contractor of the responsibility from additional cleaning if necessary.

CLIN
AREA
DESCRIPTION OF WORK
PERFORMANCE MEASURE
DAILY
WEEKLY
MONTHLY
OTHER
PUBLIC RESTROOMS
Includes all restrooms – two (2) total: one public men’s restroom, and one public women’s restroom.
0001
PUBLIC RESTROOMS

Memorial Day weekend (May) through Columbus Day weekend (October)

Sweep and wet mop floors utilizing a disinfectant cleaner.
SWEEPING, WET MOPPNG, AND OR SCRUBBING: The floors shall be kept clean and free of dirt, water streaks, mop marks, string, gum, grease, tar, etc. There shall be an overall appearance of cleanliness. All surfaces shall be dry and the corners clean. Water shall be poured into the slop sink in the janitor’s closet.
X
0001
PUBLIC RESTROOMS

Memorial Day weekend (May) through Columbus Day weekend (October)

Clean all fixtures including metal and chrome, water closets, urinals, stalls, lavatories, mirrors, waste receptacles, floor baseboards, soap and towel dispensers, and surfaces utilizing a germicide disinfectant cleaner.
FIXTURE CLEANING: Porcelain and metal surfaces and fixtures (lavatories, urinals, toilets, mirrors, stalls, etc.) shall be clean and bright. There shall be no dust, spots, stains, rust, mold, mineral deposits, soap scum, excess moisture, or other deposits.
X
0001
PUBLIC RESTROOMS

Memorial Day weekend (May) through Columbus Day weekend (October)

Service all product dispensers including paper towels, soap, toilet paper, and seat covers. Service waste receptacles.
SERVICING: Empty, clean, and disinfect all waste paper receptacles and sanitary napkin receptacles with a germicidal disinfectant. Collect and dispose of soiled bags. Replace liners in receptacles with new ones. Refill supply dispensers for paper towels, toilet paper, paper seat covers, and soap so that a sufficient supply is available at all times.
X
0001
PUBLIC RESTROOMS

Memorial Day weekend (May) through Columbus Day weekend (October)

Spot clean other surfaces and dust horizontal surfaces.
SPOT CLEANING: Smudges, marks, or spots shall be removed without causing damage to surfaces.
X
0001
PUBLIC RESTROOMS

Memorial Day weekend (May) through Columbus Day weekend (October)

Damp mop, spray buff, and maintain all vinyl and tile floors.
DAMP MOPPING AND SPRAY BUFFING: Floors shall be free of streaks, mop strand marks, and skipping areas. Walls, baseboards, and other surfaces shall be free of splashing and markings from the equipment. The finished surface shall have a uniform luster.
X
0002
PUBLIC RESTROOMS

Columbus Day weekend (October) to Memorial Day weekend (May)

Sweep and wet mop floors utilizing a disinfectant cleaner.
SWEEPING, WET MOPPNG, AND OR SCRUBBING: The floors shall be kept clean and free of dirt, water streaks, mop marks, string, gum, grease, tar, etc. There shall be an overall appearance of cleanliness. All surfaces shall be dry and the corners clean. Water shall be poured into the slop sink in the janitor’s closet.

Two (2) non-consecutive days per week.

0002
PUBLIC RESTROOMS

Columbus Day weekend (October) to Memorial Day weekend (May)

Clean all fixtures including metal and chrome, water closets, urinals, stalls, lavatories, mirrors, waste receptacles, floor baseboards, soap and towel dispensers, and surfaces utilizing a germicide disinfectant cleaner.
FIXTURE CLEANING: Porcelain and metal surfaces and fixtures (lavatories, urinals, toilets, mirrors, stalls, etc.) shall be clean and bright. There shall be no dust, spots, stains, rust, mold, mineral deposits, soap scum, excess moisture, or other deposits.

Two (2) non-consecutive days per week.

0002
PUBLIC RESTROOMS

Columbus Day weekend (October) to Memorial Day weekend (May)

Service all product dispensers including paper towels, soap, toilet paper, and seat covers. Service waste receptacles.
SERVICING: Empty, clean, and disinfect all waste paper receptacles and sanitary napkin receptacles with a germicidal disinfectant. Collect and dispose of soiled bags. Replace liners in receptacles with new ones. Refill supply dispensers for paper towels, toilet paper, paper seat covers, and soap so that a sufficient supply is available at all times.

Two (2) non-consecutive days per week.

0002
PUBLIC RESTROOMS

Columbus Day weekend (October) to Memorial Day weekend (May)

Spot clean other surfaces and dust horizontal surfaces.
SPOT CLEANING: Smudges, marks, or spots shall be removed without causing damage to surfaces.

Two (2) non-consecutive days per week.

0002
PUBLIC RESTROOMS

Columbus Day weekend (October) to Memorial Day weekend (May)

Damp mop, spray buff, and maintain all vinyl and tile floors.
DAMP MOPPING AND SPRAY BUFFING: Floors shall be free of streaks, mop strand marks, and skipping areas. Walls, baseboards, and other surfaces shall be free of splashing and markings from the equipment. The finished surface shall have a uniform luster.

Two (2) non-consecutive days per week.

UNISEX RESTROOMS
Includes all restrooms in Ranger Station—two (2) total: staff bathrooms, one urinal, three sinks, three toilets.
0003
UNISEX RESTROOMS
Sweep and wet mop floors utilizing a disinfectant cleaner.
SWEEPING, WET MOPPNG, AND OR SCRUBBING: The floors shall be kept clean and free of dirt, water streaks, mop marks, string, gum, grease, tar, etc. There shall be an overall appearance of cleanliness. All surfaces shall be dry and the corners clean. Water shall be poured into the slop sink in the janitor’s closet.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Clean all fixtures including metal and chrome, water closets, urinals, stalls, lavatories, mirrors, waste receptacles, floor baseboards, soap and towel dispensers, and surfaces utilizing a germicide disinfectant cleaner.
FIXTURE CLEANING: Porcelain and metal surfaces and fixtures (lavatories, urinals, toilets, mirrors, stalls, etc.) shall be clean and bright. There shall be no dust, spots, stains, rust, mold, mineral deposits, soap scum, excess moisture or other deposits.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Service all product dispensers including paper towels, soap, toilet paper, and seat covers. Service waste receptacles.
SERVICING: Empty, clean, and disinfect all wastepaper receptacles and sanitary napkin receptacles with a germicidal disinfectant. Collect and dispose of soiled bags. Replace liners in receptacles with new ones. Refill supply dispensers for paper towels, toilet paper, paper seat covers, and soap so that a sufficient supply is available at all times.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Spot clean other surfaces and dust horizontal surfaces.
SPOT CLEANING: Smudges, marks, or spots shall be removed without causing damage to surfaces.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Damp mop, spray buff, and maintain all vinyl and tile floors.
DAMP MOPPING AND SPRAY BUFFING: Floors shall be free of streaks, mop strand marks, and skipping areas. Walls, baseboards, and other surfaces shall be free of splashing and markings from the equipment. The finished surface shall have a uniform luster.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Damp wipe the full surface area of all stall partitions, doors, and waste receptacles utilizing a multipurpose (disinfectant deodorizer) cleaner.
DAMP WIPING: All dirt, dust, water stains, spots, streaks, and smudges shall be removed from the surfaces and waste receptacles.

Two (2) non-consecutive days per week.

0003
UNISEX RESTROOMS
Clean all restroom floors and, including grout to remove accumulated dirt and residue.
CLEANING FLOORS: All Floors shall be cleaned to remove accumulated grout, dirt, and residue.

Two (2) non-consecutive days per week.

0004
UNISEX RESTROOMS
Strip and wax all tile floors.
STRIPPING AND WAXING: All floor areas will be stripped of wax and a new coat applied.

Once a year

GENERAL OFFICE
Includes all open office areas, private offices, cubicles, storage rooms, the conference room, stairways, hallways, and mail room.
0005
GENERAL OFFICE
Empty wastebaskets, replace liner as needed to keep clean and remove trash to a designated area.
SOLID WASTE COLLECTION: All solid waste generated in the building shall be collected in trash bags and removed to outdoor trash receptacles. Liners shall not be torn, worn, or contain residue.

Two (2) non-consecutive days per week.

0005
GENERAL OFFICE
Sweeping traffic patterned areas.
SWEEPING: All areas shall be swept and shall be free of obvious dirt, debris, or spillage.

Extend the sweep to remove obvious dirt from around or under furniture.

Two (2) non-consecutive days per week.

0005
GENERAL OFFICE
Dust work surfaces and tops of bookshelves and storage units.
DUSTING: dust or wipe down surfaces using a duster that picks dust up, rather than pushing it around. Dust exposed horizontal/flat surfaces that collect dust such as desks, bookshelves, storage cabinets, and computers.

X

0005
GENERAL OFFICE
Wash or damp wipe the inside and outside of wastebaskets.
CLEANING WASTEBASKETS: At least semi-annually but more frequently if necessary wash or damp wipe wastebaskets to keep them in an acceptable condition. Wastebaskets shall be free of dust, debris, and residue. Plastic liners shall not be worn, torn, or contain residue. Liners are to be replaced at least monthly but more frequently as necessary to maintain a clean appearance.

X

0005
OFFICE RECYCLE CONTAINERS
Empty office recycle containers to larger outside pick up containers.
Empty and remove material: Desk, battery, and bottle containers are excluded.

Two (2) non-consecutive days per week.

0005
ENTRANCES, LIFT, MAIN LOBBY
Sweep floor area including all stairways. Sweep the front and rear entrances.
SWEEPING: All areas shall be swept and shall be free of obvious dirt, debris, or spillage.

Extend the sweep to remove obvious dirt from around or under furniture.

Two (2) non-consecutive days per week.

0005
ENTRANCES, LIFT, MAIN LOBBY
Clean and polish all interior and exterior metal doors, door handles, push bars, kick plates, and other metal surfaces including lift interior.
METAL POLISHING: Metal surfaces shall be free of smears, stains, and finger marks. They shall be clean, bright, and polished to uniform luster.

Two (2) non-consecutive days per week.

0005
ENTRANCES, LIFT, MAIN LOBBY
Clean inside and outside surfaces of all entry glass doors, entrance windows and frames. Remove cobwebs.
GLASS AND WALL CLEANING: All glass in the doors, windows and window frames shall be cleaned and free of smudges, streaks, etc.

X

0005
ENTRANCES, LIFT, MAIN LOBBY

COBWEBS: All cobwebs within and around the entrances and hallway windows and doors shall be removed.

0005
EXTERIOR CLEANING
Clean ash receptacles and discard materials.
Ash, cigarette butts, matches and other material shall be removed from the receptacles and the receptacles wiped so they are free of dust, ashes, odors, tar, and streaks.

Two (2) non-consecutive days per week.

0005
DRINKING FOUNTAINS
Clean drinking fountain.
CLEANING DRINKING FOUNTAIN: The stainless steel surfaces shall be clean and bright. They shall be kept free of dust, spots, stains, and streaks. Drinking fountains shall be kept free of trash, ink, coffee grounds, etc. The nozzle should be free of mineral deposits or other debris. Drinking fountain trays and drains must be clean and non-grimy.

Two (2) non-consecutive days per week.

0005
BREAK ROOM
Sweep and spot mop floor area.
SWEEPING: Sweep floor. Floor shall be kept clean and free of trash and debris. No dirt shall be left in corners or behind doors. Spot mop any spills.

Two (2) non-consecutive days per week.

0005
BREAK ROOM
Clean counter tops, microwave, and glass surfaces.
Area shall be free of all paper, trash, empty bottles and cans, and other discarded materials. The counter, and microwave shall be wiped down and kept free of dust, spots, stains, and streaks, present a clean appearance.

Two (2) non-consecutive days per week.

0005
BREAK ROOM
Wipe down and clean microwave interior.
DISINFECTANT CLEANING: A Disinfectant cleaning solution shall be used to clean the interior of the microwave.

X

0005
MARMOLEUM FLOORS Both Floors
Maintain all marmoleum floors.
CLEANING AND MOPPING: Sweep and wet mop the Marmoleum floors with a pH neutral cleaner.

Two (2) non-consecutive days per week.

0005
Luxury Vinyl Plank (LVP) Both Floors
Maintain all LVP
CLEANING AND MOPPING: Sweep and wet mop the LVP with

Two (2) non-consecutive days per week.

0006
WINDOW CLEANING
Window cleaning for both interior and exterior of all windows.
Windows shall be kept free of streaks and no water spots on sill or frames.

Quarterly

0007
MINI-BLINDS
Vacuum and wipe down mini blinds.
Vacuum and damp wipe blinds.

Semi-annually

0005
REPLACE LIGHT BULBS
Maintain the lighting both inside and outside of the facility.
All light fixtures and lights for the facility will be maintained to provide adequate lighting and will include replacing light bulbs that are burned out.

Two (2) non-consecutive days per week.

AUDITORIUM
Includes the auditorium and breezeway/hallway connecting the auditorium and District Office.
0008
AUDITORIUM

Memorial Day weekend (May) through Columbus Day weekend (October)

Sweep and maintain breezeway at the entrance to the District Office and auditorium.
SWEEPING: Breezeway area shall be swept and shall be free of obvious dirt, debris, or spillage.
X
0009
AUDITORIUM

Columbus Day weekend (October) to Memorial Day weekend.

Sweep and maintain breezeway at the entrance to the District Office and auditorium.
SWEEPING: Breezeway area shall be swept and shall be free of obvious dirt, debris, or spillage.

two (2) non-consecutive days per week.

0010
AUDITORIUM
Vacuum stage, sweep and mop auditorium floor.
VACUUMING, SWEEPING, MOPPING: Carpeted areas will be vacuumed and shall be free of obvious dirt, dust, and other debris.

X

Quality Control Plan:

The Contractor shall conduct inspections on all units in accordance with his/her Quality Control Plan (QCP). The Contractor’s Quality Control Plan shall be submitted and accepted by the Government prior to any work starting.

Government Inspections:

Government inspections are for the purpose of satisfying the Government that the services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control.

The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections. Summary results will be made available on request.

Inspections will be conducted daily, weekly, monthly, quarterly, and semiannually. The inspections will be conducted by inspectors visually inspecting as well has physically checking dispensers. Tenant participation in performance evaluation includes, compliments or complaints of service or lack of service. These compliments or complaints will result in an unscheduled inspection. Unscheduled visual inspections will also occur in any area at least twice monthly.

Acceptance will be for fully completed work in accordance performance requirements.

Deductions due to unacceptable service.

The COR may recommend to the Contracting Officer deductions based on poor or unacceptable performance or no service provided by the contract. If possible, the Contracting Officer will ask the contractor to re-work the deficient areas. The railing inspection forms will be provided along with the notice of non-compliance to the contractor for a prompt response.

Contractor-Furnished Equipment:

The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

Government-Furnished Equipment:

Toilet paper, paper towels, toilet seat covers, light bulbs, urinal deodorant screens, and hand soap.

Contract Administration Data:

Pre-work: Pre-work conference. No pre-work conference will be held. Please contact Yaney MacIver, 760-965-9764 to arrange for a site visit.

Notice to Proceed: No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed.

Payment: Payment will be made for fully acceptable work at the prices bid in the schedule of items. Payment will be made monthly.

Deductions: In accordance with the inspection clause, payment may be made for less than fully acceptable work at a reduced price.

The standards of clean deficiencies are for major daily deficiencies where the contractor is clearly not in compliance with the specifications. Contractor after being notified of deficiencies may have the opportunity to rework the areas. If the problem is reoccurring (more than three times in a month) the deductions may be made without opportunity to rework the areas and daily deductions may be made until the deficiencies are resolved.

1. 10 documented minor standards of clean deficiencies in a category in a week may result in a deduction at daily rate for that category as stated in #1 above. 30 documented minor deficiencies in a 30 day period may result in deduction equal to the full daily rate.

2. Major deficiencies are defined as the large percentage (20 %+) of the work in the category was not acceptable. The contractor clearly did not adhere to the specifications and results of completing the objective/task listed. Examples are 3 of 8 bathrooms have several deficiencies Floors not mopped, towels and soap not refilled, mirrors dirty. 10 or more offices did not have trash emptied or were vacuumed. After being notified of leaves in the entry hallway the problem persists.

3. Minor deficiencies are defined as a small % of work required but items do not meet the stand. Examples are a couple of trash cans not emptied or overlooked. Restroom runs out of supplies. Dust buildup between dustings.

Contract Release: The following supplements the Payments clause: Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically accepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15).

Invoices: Payment will be made from Contractor's invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury. Information is available at this website: https://www.ipp.gov/index.htm. There is no pre-award registration. After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. The one-time enrollment in IPP means a series of emails will be sent to the point of contact (POC) established in your System for Award Management (SAM) account at www.sam.gov. Please verify that the POC’s email address is up to date in your company’s SAM account PRIOR to starting the IPP enrollment process. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.

Emergencies:

Fire Plan. Contractors are required to comply with State law during fire season.

Designation of Contracting Officer’s Representative:

The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

Contractor Representatives:

The Government may deal officially and directly only with the contract signer, with corporate officers with legal contractual authority, or with persons specifically designated by the contractor to act as official representatives.

Loss Damage or Destruction Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage or destruction resulting from the negligent or wrongful act(s) of the government employee(s) while acting within the scope of their employment.

Invoices:

Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.

After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.

Contract Provisions and Clauses 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services (SEP 2023) (Provision) Addenda to provision 52.212-1:

Addenda to Provision 52.212-1:

For simplified acquisitions, the word quote or quoter is substituted in provision 52.212-1 for the word offer or offeror.

Addenda to Provision 52.212-1 paragraph (b) Submission of Offers:

1) Offerors must have an active entity registration in the System for Award Management in order to submit an offer. https://www.sam.gov/SAM/

2) Offers submitted in response to this solicitation shall include a technical approach document, a price quote within the completed SOI, a Past Performance document and contractor representations and certifications.

a. Technical Approach Document – The technical approach document shall address the evaluation factors in 52.212-2. At a minimum technical proposal shall include the contractor’s proposed plan of accomplishing the required work by detailing the steps, equipment, manpower, or any other relevant factors the contractor plans to use for this project. The document shall not be longer than 6 pages in total length.

b. Past Performance – The Past Performance factor will be evaluated based on the offeror’s recent and relevant experience providing similar services to those required by this solicitation. To rate past performance, the contractor shall provide a list of no more than 3 projects of a similar nature that they have completed, and provide points of contact and contract information for the end users of the projects. The government may use past performance information from any available source. If a company does not have past performance information available, information may be provided for predecessor companies, key personnel, or subcontractors. In the event that there is no past performance information available, the offeror will receive a neutral rating in this factor.

c. Price Proposal – Include the following: 1) the completed Schedule of Items from Section B of this solicitation, and 2) acknowledgement of any amendments to this solicitation by following the instructions that accompany the amendment(s).

3) Submit offer by email to Perry.rinato@usda.gov so that it is delivered into this inbox by the due date and time. Emails attachments should be in Microsoft Word, Excel, or Adobe PDF format. Be aware that large attachments may increase the time required to deliver an email. It is the offerors responsibility to confirm receipt of the offer.

4) Address questions about this solicitation to Perry Rinato at perry.rinato@usda.gov.

Addenda to Provision 52.212-1 paragraph (f) Late submissions:

Replace (f)(2)(i) with the following:

Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition. Delete 52.212-1 (f)(2)(i) paragraphs A, B, & C.

52.212-2 Evaluation – Commercial Products and Commercial Services (NOV 2021) (Provision)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

The evaluation factors for this acquisition are: (1) Technical Approach, (2) Past Performance, and (3) Price. The Government may perform a comparative evaluation (comparing offers to each other) to select the contractor that provides the best value, considering the evaluation factors in this solicitation.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .