India Range Projectile Removal drawings.pdf
PDF 5 MB Posted
- Solicitation number
- BD-27-1069-MILDV-30000-132375
- Issued by
- Barnstable County, Massachusetts
About this file
This document consists of technical drawings related to the India Range Projectile Removal project in Massachusetts, which supports a state and local contract opportunity for environmental remediation work at the India Range facility. The drawings provide detailed specifications and site plans for the removal and replacement of munitions-impacted soils on the India Range Berm. The project scope includes removal of the top layer of loam and soil fill down to the inner liner mat, containment and disposal of removed materials, restoration and replacement of the fabric liner, installation of new 1/4" minus soils across the entire berm, placement of jute matting, and hydroseeding. All work must commence after October 1, 2026, with 100 percent completion required by December 30, 2026, establishing a compressed timeline of approximately three months for project execution.
The drawings serve as technical reference materials for bidders to understand site conditions, dimensional requirements, and installation specifications necessary to submit accurate proposals for this environmental remediation contract. These technical documents are essential for contractors to assess the scope of work, quantities involved, and the complexity of the restoration effort, which includes both removal operations and site restoration activities within the specified performance window.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
LIMITS OF DISTURBANCE ---
C
'b
B
A
2 3
TOP EXIST. BERM
-----i---------,.----------t�-a�
-- L EXIST
. BERM __ ....._.,
I - - l �, - - - - - - - -� � - - /_
DRAINAGE SWALf____ - - -------
HUf3 I ND b, TA �K ;"4
2:1
I >I I '
I, I I >
5.0,!:!..0'--1----1--1
�- LIMITS OF DISTURBANCE
n 1 �1 ill �...-l-1'1111 l!.!--+-ttt �- OM FIRING LINE UJI1\ 11; 1.,1 11: 111 � � CT'. IFil ll!lU.1I 11.! Jjll
I ill :ID f9 ii01 1W 111
9 I I> a_ I
I
1 ,, 13. f ;, • /IL FIRING LANE MARKER�/. 262.48' --------- - -i-_,1 / l4M) ----------
EJ��-----�1�10�.o�o�·--------�
--- - - --- - - TBM-CHISE:LED S:.i. AT ' L--- - -
CONCRETE: FOOT/;._,
LOOKOUT TOWER � �-�,,-,
ELE:V.=100.00 (ASSUMED)
I
CONCRETE: PAD _j
(TJ 07J
E:OP
I
I
I
I
I
N
(9 20' 10' 0 20'
SCALE: 1 • =20' -o•
LEGEND
CJ PROPOSED 6" THICK AGGREGATE SURFACE
CJ EXISTING ASPHALT SURFACE
EXISTING GRAVEL SURFACE
[X] COORDINATE POINT
X l �
I � I
0 ;§
"' "' 0 .0 � oo ;; I
"' •o "ll (.) m 00 I �N
V ;; I X � E 0X e N e 0 IX) � I .2" Ll') ·;; e
15X m Ii) e • � ex i'l "' c:, il: N
� � U X
"- � ��� ii- � j!l m � e "E'.2" X e X -� � m X " X -" � /'l X , c:, X °' X V)
I ;
;1;§:li9 1;j i:! c!i;:
0::: i� JI[" <( 8 ,-e
G� __J w
!::!1 z ::::> oI -U l;;;i: <( z�
::::;;; ::::;;; 0:::
z a::
::::> � O z rnw. ::::;;;
C/JW
O>a:: 0 < a:: 3:: a...
o:::;;w-a... w ::::;;; C) < z
VJ< W-
C)O zZ <-a::
�J
WJ
111 ei] a> V z
:5 w I- (J)
Sheet reference number:
iii .E '-' m <i Cl) .E
C-102
NOTE: DRAWINGS PROVIDED FROM ORIGINAL BERM CONSTRUCTION
I
I
I
I
I
I
I
I
I
I
I
I
N
C) 20' 10' 0 20'
SCALE: l 11 =20' -0
I
I
I
I
\ '.9. '- - -97-
,,- \' <5'" I --.... �'"'
I --....,, I,, I \' -I"
,, I
" I \ \
I I \ \ I J I \ I 'f I ) LIMITS OF DISTUR�ANC --,-.....,_ I
/ I I �
I
I I I J I I
/ I I / I I " I I I I r/ I /Oj
/ I / I
I
I
I I
I
I
I
I
I I
SHED
ij
PAVEMENT
TREEtRIIE�
TBM-DUPLEX NAIL SET
IN 18" PINE TREE
ELEV.=100.13 (ASSUMED)
PK #1
ELECTRIC BOX
ON WOOD POST
WOOD POST P.
----- �VfM£Nr
"TR
Hlk
TACK
.I
RANGE I
NO i ll.
l;3
3/8" IRON PIN
I
I
I t,,.. ,,..
I I
I
• I I
I
HUB AN
(/ TACK#
�;,� I j
I
I
I ,:;.,,.""''"'"'
LEGEND
-SF- SILT FENCE
I �'"" STRAW BALES
'MJ,�/
I I I
N
C) 30' 15' 0 3(
SCALE: 1" =30' -0'
INSTALL NEW EROSION CONTROL MAT AFTER SOIL
REMOVAL AND PRIOR TO SOILS RESTORATION.
AREAS TO BE REMOVED, DISPOSED
AND REBUILT
NOTE: DRAWINGS PROVIDED FROM ORIGINAL BERM CONSTRUCTION
1291737923.NFG
Line
1291737923.NFG
Line
1291737923.NFG
Line
1291737923.NFG
Line
EXISTING
GROUND
:::cI-- Clo� 3:
GEOTEXTILE
CLASS 'C'
OR BETTER
CONSTRUCTION SPECIFICATIONS
1. LENGTH - MINIMUM OF 50'
50' MINIMUM
PLAN
50' MINIMUM
MIN. 6 11 OF 2"-3" AGGREGATE
OVER LENGTH AND WIDTH OF STRUCTURE
PROFILE
2. WIDTH - 101 MINIMUM, SHOULD BE FLARED AT THE EXISTING ROAD TO PROVIDE A TURNING RADIUS.
3. GEOTEXTILE FABRIC (FILTER CLOTH) SHALL BE PLACED OVER THE EXISTING GROUND PRIOR TO
PLACING STONE.
4. STONE - CRUSHED AGGREGATE (2" TO 3") OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT SHALL BE Pl.ACED AT LEAST 6" DEEP OVER THE LENGTH AND WIDTH OF THE ENTRANCE.
5. SURFACE WATER - ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARD CONSTRUCTION
ENTRANCES SHALL BE PIPED THROUGH THE ENTRANCE, MAINTAINING POSITIVE DRAINAGE. PIPE
INSTALLED THROUGH THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROTECTED WITH A
MOUNTABLE BERM WITH 5:1 SLOPES AND A MINIMUM OF 61
1 OF STONE OVER THE PIPE. PIPE HAS TO
BE SIZED ACCORDING TO THE DRAINAGE. WHEN THE SCE IS LOCATED AT A HIGH SPOT AND HAS NO DRAINAGE TO CONVEY A PIPE WILL NOT BE NECESSARY. PIPE SHOULD BE SIZED ACCORDING TO THE
AMOUNT OF RUNOFF TO BE CONVEYED. A 611 MINIMUM WILL BE REQUIRED.
6. LOCATION - A STABILIZED CONSTRUCTION ENTRANCE SHALL BE LOCATED AT EVERY POINT WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES A CONSTRUCTION SITE. VEHICLES LEAVING THE SITE
MUST TRAVEL OVER THE ENTIRE LENGTH OF THE STABILIZED CONSTRUCTION ENTRANCE.
@ �A�iklZED CONSTRUCTION ENTRACE
WOOD POST
� WOOD POST
'!.:t-
EXTRA STRENGTH FILTER
FABRIC NEEDED WITHOUT
WIRE MESH SUPPORT
RUNOFF
9" MAX
(RECOMMENDED)
==II
� -11 1-
STORAGE HT.
z :::E
RUNOFF
ANGLE FIRST STAKE
TOWARD PREVIOUSLY
WOODEN
PICKETS OR 2"X2"
STAKES DRIVEN 18" MIN.
IN THE GROUND ----..
FLOW
LAID BALE-�
WIRE OR NYLON
BOUND BALES
PLACED ON THE
CONTOUR
SUPPORT STAKES*
(2 PER BALE)
11 1�-111- -111�
N �
I
-,II
1------r---
I I I
I=
GRAVEL BALE
BINDING
COMPACTED
FILL
STANDARD DETAIL
TRENCH WITH NATIVE BACKFILL
NOTES:
...,___ __ '!.:= 1_ 11-
ALTERNATIVE DETAIL
TRENCH WITH GRAVEL
1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY.
2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
'!.:t-
NOTES:
fLO'N �Sil�G GROl.l�D
U.,.----11_ 111=-1 I I w
*USE 2''X2" WOOD
1. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY WOODEN STAKES DRIVEN THROUGH THE BALES.
THE FIRST STAKE IN EACH BALE SHALL BE ANGLED TOWARD PREVIOUSLY LAID BALE TO FORCE BALES
TOGETHER.
4. INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED.
5. BALES SHALL BE REMOVED BY THE CONTRACTOR WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS
NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE.
6. STRAW BALE DIKE MUST BE INSTALLED AS EXISTING LEVEL GRADE. BOTH ENDS OF EACH BALE DIKE SECTION MUST BE EXTENDED AT LEAST 8 FEET UPSLOPE AS 45 DEGREES TO THE MAIN DIKE ALIGNMENT.
7. SEDIMENT MUST BE REMOVED WHERE ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF THE
BALE.
8. ANY SECTION OF THE BALE DIKE WHICH HAS BEEN UNDERMINED OR TOPPED MUST BE IMMEDIATELY
REPLACED.
@ �R��- BALE DIKE DETAIL
File details come from the government source that posted it. Updated .