BERM CROSS SECTION.pdf
PDF 348 KB Posted
- Solicitation number
- BD-27-1069-MILDV-30000-132375
- Issued by
- Barnstable County, Massachusetts
About this file
This is a technical cross-section drawing document for the India Range Berm project in Massachusetts, which involves the removal and replacement of munitions-impacted soils. The project requires removal of the top 40 inches of existing vegetation and soils down to the inner liner mat, followed by installation of select sand fill material and erosion control systems across the entire berm. Key specifications include screening soil to a maximum particle size of 1/8 inch for select sand fill, placement of 4 inches of topsoil on all disturbed areas, and installation of Tensar-SC-150 BN erosion control matting on all slopes. The berm cross-section indicates varying widths and heights, with detailed specifications for material placement, compaction, and slope configurations. All work must commence after October 1, 2026, and be 100 percent complete by December 30, 2026.
The technical specifications outline the material composition and installation requirements for berm restoration, including the removal and proper screening of existing materials, placement of core fill and select sand fill layers, and application of erosion control fabric and topsoil to prevent erosion on slopes steeper than 2:1. The project involves both site preparation through debris and rock removal and final restoration through hydro seeding. No pricing information, bidding timeline, site visit schedules, or other commercial terms are detailed in this technical drawing document.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
EXISTING BERM
C
B
A
5'
TOPSOIL &
EROSION
CONTROL
FABRIC
VARIES 8'
(1YP.)
6.56
20.4'
TOP SOIL
SELECT SAND FILL
BACKSTOP CORE FILL�
4' lYPICAL SECTION
@ �MN.T.;:- ZERO RANGE
TOPSOIL
SC-150 BN
EROSION CONTROL MATTING
ON STEEPER THAN 2:1 SLOPES
FINISHED GRADE
SELECT SAND FILL
@ rYf J_f.5
AL SELECT SAND FILL SECTION
18' w :::;; _J lD 1 N w :z: t:;:;
0 a::
4' 1 Q'
82' (25M) w :z:
_J a::
LI..
VARIES
EXISTING GROUND 10: 1
NOTES:
1. REMOVE THE TOP 40 INCHES OF EXISTING VEGETATION AND SOILS
BEFORE INSTALLING THE SELECT MATERIAL.
2. THE SOISL SHALL BE SCREENED TO A MAXIMUM PARTICLE SIZE OF
½" AND ON TOP OF THECORE FILL..
3. THE TOPSOIL SHALL HAVE ALL DEBRIS AND ROCK REMOVED AND
SHALL BE SCREENED TO A MAXIMUM PARTICLE SIZE OF ½"
BEFORE BEING PLACED ON THE SELECT SAND FILL.
4. THE MAXIMUM SIZE GRADATION FOR SELECT SAND FILL MATERIAL
SHALL BE 1 /8"
5. INSTALL EROSION CONTROL MATTING ON ALL SLOPES OVER THE
CORE LAYER AND ON TOP OF THE SELECT FILL LAYER BELOW
THE TOPSOIL. EROSION CONTROL MATTING SHALL BE
TENSAR-SC-150 BN OR AN APPROVED EQUAL.
6. PLACE 4" OF TOPSOIL ON ALL DISTURBED AREAS BEFORE
SEEDING.
7.
X l �
I � I
0 ;§
.0 I')
0 oo ;; I "' •o "ll (.) m 00 I
�N V ;; IX � E 0 X e N e 0
IX) � I .2" Ll') ·;; e 15X m Ii) e • � ex i'l "' c:, il: N
� � U X ii-j!l m �e "E'.2" X e X -� � m X " X -" � /'l X , c:, X °' X V)
I ;
;1;§:li9 1;j i:! c!i;:
0::: i� JI[" <( 8 "" G� -' w
!::!1 z ::::> oI -U l;;;i: <( z�
0:::
a::
::::> �O:z: rnw . ::::;;;(/) wO> a:: 0 < a:: ;;::a..
o:::;;
w-a.. w < :z:
(/) <W-c., 0 z:z:
:z:
�J
WJ
Ill ei] a, V
CJ)
z
I-u w
CJ)
Sheet reference number:
iii .E '-' m <i Cl) .E
C-301