Improvement_Plan_for_Baumberg_(Scope_of_Work_is_clouded).pdf

PDF 724 KB Posted

Attached to
DOT #749913P (Baumberg Avenue) Railroad Sidewalk Construction
Solicitation number
26-043
Issued by
Alameda County, California

About this file

This is a street improvement plan document prepared by Kier & Wright Civil Engineers & Surveyors, Inc. for the City of Hayward, California, detailing the improvement plan for Baumberg Avenue. The plan covers Station 7+00 to Station 12+50 and includes profile views with horizontal scale of 1"=20' and vertical scale of 1"=4'. The project, identified as Job No. A14500-11, was originally dated August 2016 with a permit set dated December 15, 2017. The plan has undergone multiple revisions, with revised permit sets issued on March 29, 2018, and April 30, 2018. The scope of work includes street lighting and support structures, water and sewer crossings, accessible ramp redesign, and pedestrian bridge approach modifications. Design elements specified in the plan include 6-inch thick Hot Mix Asphalt (HMA) pavement, Portland Cement Concrete (PCC) sidewalk with curb and gutter, removal of K-rail and asphalt berm, and various measurement annotations including areas of 214.84 square feet and 110.08 square feet.

The document serves as the technical foundation for the City of Hayward's DOT #749913P (Baumberg Avenue) Railroad Sidewalk Construction project, with sealed proposals due to the City's eProcurement Portal by 2:00 PM on Tuesday, April 14, 2026. This improvement plan establishes the design specifications and construction standards that qualifying contractors must follow in their proposals. The plan identifies key work areas including intersections with Julia Street and Industrial Boulevard, coordination with Union Pacific Railroad, and integration with existing public infrastructure. All submitted proposals must be clearly identified with the RFP title, number, company name, and due date, with late submissions deemed nonresponsive. The engineering drawings and specifications contained in this plan document form the basis for contractor evaluation and project execution.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROFILE

1" = 20' HORIZ.

1" = 4' VERT.

CURVE TABLE

IP3.2

1"=20' H. 1"=4'V.

BA

UM

BE

RG

A

VE

(P

UB

LI

C)

SCALE: 1"= 20'

PLAN

ST

AT

IO

N

T

O S

TA

TI

O N

2+

PERMIT SET 12-15-2017

ST

RE

ET

IM

PR

O

VE

M

EN

T

PL

AN

H

AY

W

AR

D

AUGUST, 2016

SHEET

DATE

SCALE

DESIGNER

JOB NO. A14500-11

CRM

N O

RE

VI

SI

O N

N O

BY

RE

VI

SI

O

N

BY

CA

LI

FO

RN

IA

KI

ER

W

RI

G

H T

CI

VI

L

EN

G

IN

EE

RS

S

UR

VE

YO

RS

, I N

C.

C ol lie r Ca ny on

R oa d

P ho ne

(9

) 2

-8

Li ve rm or e, C al ifo rn ia

Fa x (9

) 2

-8

W

EB

ER

/T

RA

CT

OF 11 SHEETS

Revised Permit Set 03-29-2018 Revised Permit Set 04-30-2018

BAUMBERG AVENUE

JU

LI

A

ST

RE

ET

(P

UB

LI

C)

(PUBLIC)

KEY NOTES

M

AT

CH

L

IN

E

7+

S

EE

S H

EE

T

IP

3.

N O

RTH

SIGNING AND STRIPING KEY NOTES

IN

D

US

TR

IA

L

BO

UL

EV

AR

D

UN

IO

N P

AC

IF

IC

RA

IL

RO

AD

CR

M

-3 1-

S

TR

EE

T

LIG

HT

S & C

B #2

ALTERNATIVE CONSTRUCTION

-0 3-

"W

SD

C

RO

SS

IN

G

CR

M

-0 8-

A

CC

ES

SIB

LE

RA

MP

RE

DE

SIG

N

CR

M

-3 0-

P

ED

ES

TR

IAN

BR

ID

GE

A

PP

RO

AC

H

CR

M

Dave.Hung Length Measurement 10'-0"

Dave.Hung Area Measurement

214.84 sf

Dave.Hung Area Measurement

110.08 sf

Dave.Hung Polygon

Dave.Hung Polygon

Dave.Hung Callout HMA assume 6" thick

Dave.Hung Callout PCC sidewalk and curb and gutter

Dave.Hung Text Box remove k-rail and ac berm

Dave.Hung Rectangle

Dave.Hung Line

Dave.Hung Rectangle

Dave.Hung Line

Kevin.Yoshiki Length Measurement 21'-3 3/4"

Kevin.Yoshiki Length Measurement 22'-6 1/2"

Kevin.Yoshiki Cloud

File details come from the government source that posted it. Updated .