ILDOT 68J61-050.pdf
PDF 1 MB Posted
- Solicitation number
- 68J61
- Issued by
- Lawrence County, Illinois
About this file
This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 68J61, a milling and resurfacing project in Knox County. The project encompasses approximately 10.03 miles of work across Interstate 74 (6.17 miles from 0.3 mile west of East Main Street in Galesburg to east of the Illinois Route 97 interchange), Main Street (0.40 miles from 0.2 mile east of Michigan Avenue to 0.1 mile east of Soangetaha Road), and US Route 150/Illinois Route 97 (1.19 miles). The scope of work includes hot-mix asphalt milling and resurfacing at depths ranging from 0.5 inches to 3 inches, partial depth patching, guardrail removal and replacement with new steel plate beam guardrail, drainage inlet adjustments and cleaning, ditch grading and shaping, seeding of disturbed areas, linear delineator panel installation, spray-applied pipe liner installation for culvert rehabilitation, and comprehensive traffic control measures. Electronic bids must be submitted to the iCX system prior to 12:00 p.m. on September 18, 2026, at which time bids will be publicly opened. The contract is funded through National Highway Performance Program (NHPP) and Surface Transportation Program (STP) federal construction funds and is administered by IDOT District 4.
The contract will be awarded to the lowest responsive and responsible bidder based on conformity with terms and conditions established by IDOT. Payment is structured on unit prices for various work items including hot-mix asphalt surface removal (per square yard by depth), hot-mix asphalt placement and shoulder resurfacing (per ton), guardrail work (per foot or each), inlet adjustments (per each), grading and shaping (per foot), linear delineator panels (per each), spray-applied pipe liner (per foot by diameter), and traffic control and protection (lump sum). Critical project requirements include maintaining at least one lane of traffic in each direction at all times with no permanent lane closures, weekend ramp closures limited to 6:00 p.m. Friday through 5:00 a.m. Monday with Engineer approval, roadway opening to traffic by end of each day, and placement of all 4.25-inch hot-mix asphalt shoulders on US Route 150/Illinois Route 97 the same day as shoulder grading. Special provisions address Equal Employment Opportunity compliance, subletting restrictions, Disadvantaged Business Enterprise (DBE) participation, quality control and assurance testing requirements for Portland cement concrete and hot-mix asphalt, pavement smoothness testing (IRI), labor compliance and prevailing wage requirements, and performance specifications for linear delineator panels including a 180-day winter performance inspection period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IDOT 68J61-090.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting September 18, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 68J61 KNOX County Section 48(26RS-4;27RS-5;28RS-6) Various Routes Project NHPP-STP-YR8Q(914) District 4 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
September 18, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 68J61 KNOX County Section 48(26RS-4;27RS-5;28RS-6) Project NHPP-STP-YR8Q(914) Various Routes District 4 Construction Funds
Milling and resurfacing on Interstate 74, interchange ramps, Main Street, and US Route 150 guardrail replacement, and other related collateral work. Net length of the project is approximately 10.03 miles.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
Section 48(26RS-4;27RS-5;28RS-6) Knox County
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
Section 48(26RS-4;27RS-5;28RS-6)
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 X Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays
Section 48(26RS-4;27RS-5;28RS-6) i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
CONSTRUCTION STATION LAYOUT
UTILITIES – LOCATIONS/INFORMATION ON PLANS
LOCATION OF UNDERGROUND STATE MAINTAINED FACILITIES
SEEDING, MINOR AREAS
PARTIAL DEPTH PATCHING
HOT-MIX ASPHALT SURFACE REMOVAL, ½", ¾", 1½", 2" AND 3¾"
HOT-MIX ASPHALT JOINT TRIMMING
HOT-MIX ASPHALT SHOULDER RESURFACING REQUIRED TO BE CONSTRUCTED
SIMULTANEOUSLY WITH MAINLINE PAVING
HOT-MIX ASPHALT SHOULDER RESURFACING CONSTRUCTED SIMULTANEOUSLY WITH
MAINLINE PAVING
GUARDRAIL AGGREGATE EROSION CONTROL
TRAFFIC CONTROL PLAN
TRAFFIC CONTROL AND PROTECTION (SPECIAL)
DETOUR SIGNING
HOT-MIX ASPHALT SHOULDER, 4¼"
GRADING AND SHAPING SHOULDERS (SPECIAL)
HOT-MIX ASPHALT DRIVEWAY PAVEMENT REMOVAL
CURB REMOVAL (SPECIAL)
CONCRETE CURB (SPECIAL)
REMOVAL AND REPLACEMENT OF STEEL PLATE BEAM GUARDRAIL, RAIL ELEMENT ..17
GUARDRAIL BLOCKS
STEEL PLATE BEAM GUARDRAIL (SHORT RADIUS)
GRADING AND SHAPING DITCHES (SPECIAL)
RESET GRATE
REPLACE MEDIAN GRATE
CLEAN EXISTING END SECTIONS
INLETS TO BE ADJUSTED
CLEANING EXISTING INLETS
REMOVEL AND RELAY END SECTIONS
Section 48(26RS-4;27RS-5;28RS-6) ii
LINEAR DELINEATOR PANELS, 4 INCH
AGGREGATE QUALITY
PCC QMP ELECTRONIC REPORT SUBMITTALS
PCC AUTOMATIC BATCHING EQUIPMENT
DELINEATORS (SPECIAL)
CONCRETE MEDIAN SURFACE REMOVAL
CONCRETE MEDIAN REMOVAL
SPRAY-APPLIED PIPE LINER
CLEANING UNDERDRAIN OUTLETS
RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)
REQUIREMENTS WHEN WORKING WITH THE RAILROAD COMPANY
AGGREGATE SUBGRADE IMPROVEMENT (BDE)
AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)
BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
CONCRETE BARRIER (BDE)
DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)
FUEL COST ADJUSTMENT (BDE)
GUARDRAIL (BDE)
HOT-MIX ASPHALT (BDE)
PAVEMENT MARKING (BDE)
PAVEMENT PATCHING (BDE)
PERFORMANCE GRADED ASPHALT BINDER (BDE)
RAISED REFLECTIVE PAVEMENT MARKERS (BDE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SINUSOIDAL RUMBLE STRIPS (BDE)
SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)
SPEED DISPLAY TRAILER (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
Section 48(26RS-4;27RS-5;28RS-6) iii
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)
SURFACE TESTING OF PAVEMENTS – IRI (BDE)
SURVEYING SERVICES (BDE)
TEMPORARY CONCRETE BARRIER (BDE)
TRAINING SPECIAL PROVISIONS (BDE)
IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION ...92
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WEEKLY DBE TRUCKING REPORTS (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORKING DAYS (BDE)
WORK ZONE WIDTH RESTRICTION (BDE)
PROJECT LABOR AGREEMENT
Section 48(26RS-4;27RS-5;28RS-6)
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022 (revised January 1, 2026), the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of Various Routes, Project NHPP-STP-YR8Q(914), Section 48(26RS-4;27RS-5;28RS-6), Knox County, Contract No. 68J61 and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
LOCATION OF PROJECT
This project is on Interstate 74 (FAI 74) from 0.3 mile west of East Main Street in Galesburg to East of the Illinois Route 97 interchange, on Main Street from 0.2 mile East of Michigan Avenue to 0.1 mile East of Soangetaha Road, and on US Route 150 from 0.2 mile East of Interstate 74 Westbound ramp to 0.1 mile West of Junction Illinois Route 97 South on Illinois Route 97 in Knox County. The total distance on Interstate 74 is 32,600 feet (6.17 miles).
DESCRIPTION OF PROJECT
The proposed project consists of milling and resurfacing on Interstate 74, interchange ramps, Main Street, and US Route 150 guardrail replacement, and other related collateral work necessary to complete the work in the plans and as described herein.
Section 48(26RS-4;27RS-5;28RS-6)
CONSTRUCTION STATION LAYOUT
Effective: July 30, 2010
This work shall consist of all labor, materials, and equipment necessary to temporarily stake, maintain, and remove the roadway stationing for all mainline and ramp pavements to be overlaid within the project limits.
Prior to any cold milling or other operations that will destroy the existing stationing stamped in the existing pavement, the Contractor shall have the stationing temporarily marked beyond the edge of shoulder or as directed by the Engineer. Unless otherwise allowed, the stationing shall be legibly written on wooden lathe marked with a ribbon and driven into the ground at 200′ (100 meter) intervals. On 2, 3, and 5 lane pavements, the stationing shall be marked on the right edge of pavement in the direction of increasing stationing. On ramp pavements, the stationing shall be marked along the baseline. On multi-lane divided roadways, the stationing shall be marked along the outside edge of shoulder in both directions. The stationing to be used shall be as shown on the plans. The beginning and ending station and location shall be confirmed with the Engineer prior to staking. Once the surface course has been stamped, the lathe shall be removed and disposed of in accordance with the Standard Specifications.
This work will be paid for at the contract unit price per Lump Sum for CONSTRUCTION STATION LAYOUT and no other compensation will be allowed.
UTILITIES – LOCATIONS/INFORMATION ON PLANS
Effective: November 8, 2013
The locations of existing water mains, gas mains, sewers, electric power lines, telephone lines, and other utilities as shown on the plans are based on field investigation and locations provided by the utility companies, but they are not guaranteed. Unless elevations are shown, all utility locations shown on the cross sections are based on the approximate depth supplied by the utility company. It shall be the Contractor’s responsibility to ascertain their exact location from the utility companies and by field inspection.
LOCATION OF UNDERGROUND STATE MAINTAINED FACILITIES
Effective: August 3, 2007 Revised: July 31, 2009
The Contractor shall be responsible for locating existing and proposed IDOT electrical facilities (traffic signal, overhead lighting, Intelligent Transportation System, etc.) prior to performing any work at his/her own expense if required. The Contractor shall also be liable for any damage to IDOT facilities resulting from inaccurate locating.
The Contractor may obtain, on request, plans for existing electrical facilities from the Department.
Section 48(26RS-4;27RS-5;28RS-6)
The Contractor shall also be responsible for locating and providing protection for IDOT facilities during all phases of construction. If at any time the facilities are damaged, the Contractor shall immediately notify the Department and make all necessary arrangements for repair to the satisfaction of the Engineer. This work will not be paid for separately, but shall be included in the contract bid price.
SEEDING, MINOR AREAS
Effective July 1, 1990 Revised April 1, 2019
Seeding, fertilizing, and mulching shall be done in accordance with Article 250 of the Standard Specifications except for the following revisions:
All areas disturbed by the work performed shall be seeded, fertilized, and mulched in accordance with Article 251.03(a). The materials may be purchased locally and placed as directed by the Engineer.
The estimated area is approximately 0.07 acre (0.028 hectare). The seed mixture shall be applied at 100 pounds/acre (110 kg/ha). The mixture shall be one that contains Turf Type Tall Fescue, Creeping Red Fescue, and Kentucky Blue Grass. The Kentucky Blue Grass shall not exceed 50% of the mixture. All seeds shall meet the purity and noxious weed requirements of Article
1081.04 of the Standard Specifications, and be approved by the Engineer.
The fertilizer nutrients shall be applied at a rate of 270 lbs. (300 kg) of actual nutrients per acre (hectare). The fertilizer furnished shall be ready mixed material having a ratio of (1-1-1).
The Contractor shall provide the Engineer with the test results from the seed container and the chemical analysis of the fertilizer nutrients.
The seed, fertilizer, and mulch will not be measured for payment but will be considered included in the cost of GRADING AND SHAPING DITCHES (SPECIAL).
PARTIAL DEPTH PATCHING
Effective: April 26, 2013 Revised: November 6, 2020
This work shall consist of partial depth patching of the existing pavement structure and replacement with Hot-Mix Asphalt (HMA) material at the locations shown in the plans or as directed by the Engineer. This work will be performed before completion of the cold milling operation and prior to the placement of the HMA overlay, if applicable.
Section 48(26RS-4;27RS-5;28RS-6)
This work shall include all labor, equipment, and materials necessary to remove the existing HMA overlay to a depth of 5" and 2". The removal shall be performed with a cold milling machine of sufficient size and weight to remove the existing HMA. The milling machine must be operated longitudinally with the flow of traffic and will not be permitted to cut transversely across the lane.
Disposal of waste materials for the work described herein shall be in accordance with Article
202.03 of the Standard Specifications. After cold milling the patch, all loose material shall be removed and the area air-blast cleaned to the satisfaction of the Engineer. Replacement HMA material shall be as shown in the Mixture Requirements Table in the plans.
Prior to placement of the HMA material, the bottom and sides of the patch shall be primed in accordance with Article 406.05 of the Standard Specifications using an SS-1hP bituminous material. The prime shall be applied at a residual rate of 0.08 lbs./Sq. Ft. by means of a mechanical distributor and shall be placed on all surfaces of the milled trench.
The HMA material shall be placed a maximum of 3" lifts and shall match the elevation of the surrounding pavement after final compaction. Bumps greater than ¼", measured with a 16' straight edge, left after compaction shall be removed with pavement surface grinding equipment in accordance with Article 1101.04 of the Standard Specifications.
The HMA mixture and density control limits shall conform to Article 1030 of the Standard Specifications. Compaction shall be accomplished using a vibrating roller that conforms to the applicable sections of Article 1101.01 of the Standard Specifications.
The Contractor shall fill all patches with the HMA material in the same day they are milled. No open patches will be allowed to remain overnight.
Removal of the existing HMA will be measured for payment in place, and the area computed in Square Yards. The limits will be the area of the patch that measures at least 2" or 5" in depth, and shall not include the rounded transition at the beginning and end of the patch.
If after milling, it’s determined by the Resident Engineer that damage to the existing pavement structure still exists and must be addressed by means of a full-depth patch, the additional labor and materials required shall be paid in accordance to Article 109.04 of the Standard Specifications for "Road and Bridge Construction."
Replacement with HMA will be measured in Tons placed to fill the full depth milled area (PARTIAL
DEPTH PATCHING).
Basis of Payment: Partial depth removal and cleaning of the pavement will be paid for at the contract unit price per Square Yard for PARTIAL DEPTH PATCHING (SPECIAL). The HMA placement and the priming of the partial depth patches will be paid for at the contract unit price per Ton for PARTIAL DEPTH PATCHING.
Section 48(26RS-4;27RS-5;28RS-6)
HOT-MIX ASPHALT SURFACE REMOVAL, ½", ¾", 1½", 2" AND 3¾"
Effective: March 1, 1993 Revised: January 1, 2022
Description: This work shall consist of removing a portion of the existing hot-mix asphalt concrete surface course in accordance with the applicable portions of Section 440 and 1101 of the Standard Specifications, this special provision, details in the plans and as directed by the Engineer. The cold milled salvaged aggregate resulting from this operation shall become the property of the Contractor.
Equipment: The machine used for milling and planing shall be a self-propelled grinding machine having a minimum 12' (3.6 m) wide drum at least 28" (710 mm) in diameter. When a milling width in excess of 12' is required and the Contractor’s milling machine is less than the required width shown in the plans, the remaining area shall be milled with a machine capable of meeting the requirements of this special provision. Milling attachments used with skid steer tractors will not be allowed for longitudinal areas to mill additional widths.
When the teeth become worn so that they do not produce a uniform surface texture, they shall all be changed at the same time (as a unit). Occasionally, individual teeth may be changed if they lock up or break, but this method shall not be used to avoid changing the set of teeth as a unit.
Occasional gouges, due to deteriorated pavement condition, or separation of lifts will not be cause to replace all teeth. The Engineer will be the sole judge of the cause of the pavement gouging and the corrective work required. Corrective work due to negligence or poor workmanship shall be at the Contractor’s expense.
The moldboard is critical in obtaining the desired surface texture. It shall be straight, true, and free of excessive nicks or wear, and it shall be replaced as necessary to uniformly produce the required surface texture. Gouging of the pavement by more than 1/4 inch (6 mm) shall be sufficient cause to require replacement of all teeth.
Add the following after the third sentence of Article 406.05 (c)(1):
"Vacuum sweeping shall be accomplished with a regenerative air sweeper."
Construction Requirements
General: Weather conditions, when milling work is performed, must be such that short term or temporary pavement markings can be placed the day the surface is milled in accordance with Section 703 "Work Zone Pavement Markings".
An automatic grade control device shall be used when milling mainline pavement and shall be capable of controlling the elevation of the drum relative to either a preset grade control stringline or a grade reference device traveling on the adjacent pavement surface. The automatic grade control device may be utilized only on one side of the machine with a automatic slope control device controlling the opposite side. The traveling grade reference device shall not be less than 30 feet (9 m) in length. When milling cross roads, turn lanes, intersections, crossovers, or other miscellaneous areas, the Engineer may permit the matching shoe. The Contractor, at his option, may also substitute an approved 6' wide (1.8 m) machine for areas other than mainline pavement.
Section 48(26RS-4;27RS-5;28RS-6)
The Contractor shall mill ½", ¾", 1½", 2" and 3¾" at the centerline and project the proposed cross slope to the edge of pavement. In the event the milling at the outer edge of the lane would exceed ½", ¾", 1½", 2" and 3¾"; then the Contractor shall reduce the cut at the centerline to provide the maximum cut of ½", ¾", 1½", 2" and 3¾" at the edge of pavement. If deemed necessary, the Contractor may reduce the cross slope from normal 1.5% to 1%.
Surface tests will be performed in accordance with Article 406.11 of the Standard Specifications.
The longitudinal profile will be taken 3 ft. (0.9 m) from and parallel to each edge of pavement and 3 ft. (0.9 m) from and parallel to the centerline on each side. If a shadow area is found at the 3 ft.
(0.9 m) points the pavement smoothness tester will be moved sufficient distance either side to measure the Contractor’s milling efforts. Any surface variations exceeding the tolerance in Article
406.11 shall be corrected by reprofiling at no additional expense to the Department. In addition, the Contractor shall be responsible for refilling with approved hot-mix asphalt mixtures any area that lowered the pavement profile as a result of faulty milling operations if directed by the Engineer. The Contractor shall be responsible for providing the pavement smoothness tester described elsewhere to retest the pavement profile obtained.
If the milling depth is intended to expose the original concrete pavement, then additional hand or machine work may be necessary to remove any remaining veneer of bituminous pavement which may be left in place behind the milling machine. Such work will be at the direction of the Engineer and at no extra cost to the Department.
The Contractor shall provide a 10-foot (3 m) straightedge equipped with a carpenter’s level or a 7-foot (2.1 m) electronic straightedge to check the cross slope of the roadway at regular intervals as directed by the Engineer.
Surface Texture: Each tooth on the cutting drum shall produce a series of discontinuous longitudinal striations. There shall be 16 to 20 striations (tooth marks) for each tooth for each 6 feet (1.8 m) in the longitudinal direction, and each striation shall be 1.7 inches ±0.2 inch (43 ±5 mm) in length after the area is planed by the moldboard. Thus, the planed length between each pair of striations shall be 2.3 inches ±0.2 inch (58 ±5 mm). There shall be 80 to 96 rows of discontinuous longitudinal striations for each 5 feet (1.5 m) in the transverse dimension. The areas between the striations in both the longitudinal and transverse directions shall be flat topped and coplaner. The moldboard shall be used to cut this plane; and any time the operation fails to produce this flat plane interspersed with a uniform pattern of discontinuous longitudinal striations, the operation shall be stopped and the cause determined and corrected before recommencing.
Other similar patterns of uniform discontinuous longitudinal striations interspersed on a flat plane may be approved by the Engineer. The drawing titled "Hot-Mix Asphalt Surface Removal" showing the desired surface texture is included in the plans.
The start-up milling speed shall be limited to a maximum of 50-foot (15 m) per minute. The Contractor shall limit his operations to this speed to demonstrate his ability to obtain the striations and ride ability as described above. If the Contractor is able to demonstrate that he can consistently obtain the desired striations and ride ability at a greater speed he will be permitted to run at the increased speed.
Cleanup: After cold milling a traffic lane and before opening the lane to traffic, the pavement shall be swept by a regenerative air sweeper to prevent compaction of the cuttings onto the pavement. All loose material shall be removed from the roadway. Before the prime coat is placed, the pavement shall be cleaned of all foreign material to the satisfaction of the Engineer.
Section 48(26RS-4;27RS-5;28RS-6)
This cleanup work shall be considered included in the contract unit price per Square Meter (Square Yard) for HOT-MIX ASPHALT SURFACE REMOVAL of the depth specified, and no additional compensation will be allowed.
Method of Measurement:
(a) Contract Quantities. The requirements for the use of Contract Quantities shall be Article
202.07(a) of the Standard Specifications.
(b) Measured Quantities. Cold milling and planing will be measured and the area computed in Square Yards (Square Meters) of surface.
Areas not milled (shadowed areas) due to rutting in the existing pavement surface will be included in the area measured for payment.
Basis of Payment: The cold milling and planing will be paid for at the contract unit price per Square Yard (Square Meter) for HOT-MIX ASPHALT SURFACE REMOVAL of the depth specified. Payment as specified will include variations in depth of cuts due to rutting, superelevations, and pavement crown and no additional compensation will be allowed.
HOT-MIX ASPHALT JOINT TRIMMING
Effective: August 5, 2022
When specified in the plans, unconfined hot mix asphalt (HMA) edges will be placed and trimmed per the following guidelines:
1. Place the HMA tack coat and HMA pavement/shoulder 6" wider than the designated lane line (centerline or edge of pavement).
2. When the joint is trimmed as an independent operation, mill the excess 6" of the unconfined HMA to the lane line. The milling equipment must be capable of producing a straight line. The depth of the milling must be controlled so as not to gouge the underlying lift. The intent is to create a vertical face at the lane line and provide a lateral confinement for the adjacent mat. Skid-steer mounted mills will not be allowed.
Milling and cleaning must be done prior to tacking of the adjacent HMA paving. Milling the same day as HMA placement will not be allowed. If the Engineer determines excessive raveling of the milled face is occurring, the contractor shall make adjustments to the operation such as slowing the mill speed, replacing mill teeth, or adjustment of mill box side plates.
3. When the joint is trimmed as part of the adjacent mat milling, milling the same day as
HMA placement will not be allowed. If the Engineer determines excessive raveling of the milled face is occurring, the contractor shall make adjustments to the operation such as slowing the mill speed, replacing mill teeth, or adjustment of mill box side plates.
Section 48(26RS-4;27RS-5;28RS-6)
4. Clean and prepare the surface of the adjacent mat as per Article 406.05 of the Standard
Specification prior to the placement of the HMA. The HMA Tack Coat shall be sprayed the full width of the lane/shoulder and also lapped onto the adjacent mat a distance not to exceed 4". In addition, the vertical face of the adjacent mat shall be thoroughly tacked by means of a dedicated spray nozzle, mounted at a 45 degree angle, aimed toward the face.
5. Placement of this HMA mat shall require the use of a joint-matching device in lieu of a longitudinal averaging ski. The compacted height of this mat shall be exactly flush, or not more than 1/32" higher, to the adjacent mat to ensure the joint has sufficient material for adequate compaction. During placement, the side plate of the screed shall not exceed 1/2" overlap onto the adjacent mat.
When milled independently, the 6" extra width at the lane line will be paid for at the contract unit price per Square Yard for HOT-MIX ASPHALT SURFACE REMOVAL – SPECIAL. When milled with the adjacent mat, the 6" extra width at the lane line will be paid for at the contract unit price for HOT-MIX ASPHALT SURFACE REMOVAL of the depth specified. The extra HMA tack coat will be paid for at the contract unit price per Pound for the tack coat specified in the plans. The extra trimmed HMA will be paid for at the contract unit price per Ton or Square Yard, as specified in the plans. All other extra work will not be paid for separately but shall be included in the unit bid price of the various pay items and no other compensation will be allowed.
HOT-MIX ASPHALT SHOULDER RESURFACING REQUIRED TO BE CONSTRUCTED
SIMULTANEOUSLY WITH MAINLINE PAVING
Effective April 23, 2010 Revised August 4, 2017
When the top lift of the shoulders are specified to be placed simultaneously with the mainline surface course and a Material Transfer Device is required for the mainline surface course, the shoulder will be placed with the Material Transfer Device and both the mainline and shoulder tonnage will be paid for at the contract unit price for Material Transfer Device.
A roller meeting the requirements of Article 1101.01 shall be required. This roller will be in addition to any rollers required for compaction of the mainline roadway resurfacing. This additional roller will not be paid for separately, but shall be included in the contract unit price bid for the Hot-Mix Asphalt surface course material being placed.
The various HMA mixtures placed with the material transfer device will be paid for as specified in their respective specifications.
Section 48(26RS-4;27RS-5;28RS-6)
HOT-MIX ASPHALT SHOULDER RESURFACING CONSTRUCTED SIMULTANEOUSLY
WITH MAINLINE PAVING
Effective: January 22, 2001 Revised: January 1, 2007
If the Department allows resurfacing hot-mix asphalt shoulders simultaneously with the mainline pavement resurfacing, a roller meeting the requirements of Article 1101.01 shall be required. This roller will be in addition to any rollers required for compaction of the mainline roadway resurfacing.
This additional roller will not be paid for separately but shall be included in the contract unit price bid for the mainline bituminous material being placed.
GUARDRAIL AGGREGATE EROSION CONTROL
Effective: February 1, 1993 Revised: January 1, 2007
This work shall consist of furnishing, placing, and shaping crushed aggregate placed around and behind guardrail posts in accordance with plan details.
Method of Measurement: The aggregate for constructing the Guardrail Aggregate Erosion Control will be measured in Tons (Metric Tons).
The Geotextile Fabric will not be measured for payment.
Basis of Payment: Guardrail Aggregate Erosion Control will be paid for at the contract unit price per Ton (Metric Ton) for GUARDRAIL AGGREGATE EROSION CONTROL measured as specified herein. The Geotextile Fabric will not be measured for payment, but shall be included in the cost per Ton (Metric Ton) for GUARDRAIL AGGREGATE EROSION CONTROL.
TRAFFIC CONTROL PLAN
Effective: March 27, 2026
Traffic control shall be in accordance with the applicable sections of the "Standard Specifications for Road and Bridge Construction," the applicable guidelines contained in the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways," these Special Provisions, and any special details and Highway Standards contained herein and in the plans.
Special attention is called to Section 701 and Articles 107.09 and 107.14 of the "Standard Specifications for Road and Bridge Construction" and the following Highway Standards relating to traffic control:
701006 701011 701101 701201 701301 701306
701311 701326 701336 701400 701401 701402
701406 701411 701427 701451 701456 701501
701601 701701 701901 780001 781001
Section 48(26RS-4;27RS-5;28RS-6)
WORKING RESTRICTIONS & TRAFFIC CONTROL NOTES
• The Contractor must notify the IDOT Resident Engineer two (2) weeks prior to commencement of the construction project.
• Proposed guardrail must be installed within seven (7) Calendar Days of existing guardrail removal.
• The road must be open to traffic at the end of each day. No permanent lane closures allowed.
• Weekend closure of ramps will be allowed between 6:00 p.m. Central Time on Friday until 5:00 a.m. Central Time on the following Monday and must be approved by the Resident Engineer.
• Detour routes are presented in the plans.
Only one ramp at each interchange can be closed at a time and is limited to the period from 6:00 P.M. Friday to 5:00 A.M. Monday. Simultaneous closure of ramps is specified in the following table:
Allowed Simultaneous Ramp Closures Ramp Closed Ramps to Remain Open
East Main Street A A @ Knox Hwy 9 C EB US 34 to WB I-74 @ US 34 D A @ Knox Hwy 9 E EB I-74 to WB US 34 @ US 34 H D @ Knox Hwy 9
Knox Highway 9
A C @ US 150
B C @ E. Main St.
C E @ E. Main St.
D D @ US 150
US 150
A C @ Knox Hwy 9 B B @ Knox Hwy 9 C A @ Knox Hwy 9 D D @ Knox Hwy 9
The Contractor is responsible for determining the sequence and timing of the closures to perform the various proposed work items on the ramps. Approval from the Resident is required prior to any ramp closures or before any work begins. Daytime only partial ramp closures may be allowed outside of the one-time full closure duration.
Section 48(26RS-4;27RS-5;28RS-6)
• On US 150 /IL 97 the Contractor must place all 4.25" HMA shoulders in the same day the Grading and Shaping Shoulders (Special) is removed.
• Place Portable Changeable Message Signs (PCMS):
o In each direction along I-74 and in each direction along the local roadways a minimum of seven (7) days prior to weekend ramp closures. This is in effort to provide motorists the opportunity to take alternative routes and reduce the expected back-ups due to the lane closures.
o Two boards must be placed at the CH 9 and US 150/IL 97 interchange job limits, seven (7) days in advance of any construction work beginning, warning motorists of the upcoming construction work. This is in effort to provide motorists the opportunity to take alternative routes and reduce the expected back-ups due to the lane closures.
o Messages must be approved by the IDOT Resident Engineer.
• Flaggers should be considered while striping ramps. The additional cost is considered included in the Traffic Control and Protection (Special) pay item.
• Additional barrels are to be used to tighten spacing at ramp closure locations to further impede the possibility of motorists entering the ramp. The additional cost is considered included in the Traffic Control and Protection (Special) pay item.
• Sideroads may be closed for short durations with the approval of the Resident Engineer, but no two adjacent sideroads may be closed at the same time.
• Drop-offs must follow Article 701.07 of the Standard Specifications.
• Contractor must place all 4.25" HMA shoulders in the same day the Grading and Shaping Shoulders (Special) is removed.
• Short-term pavement markings must be paint.
SUGGESTED SEQUENCE OF OPERATIONS:
I-74 MAINLINE EASTBOUND AND WESTBOUND
1. Perform any patching.
2. Close lane one to traffic and maintain a single lane of traffic on lane two using Highway
Standards 701401, 701406, or 701411 as applicable for the location.
3. Traffic will not be permitted on milled surfaces. The Contractor must plan operations accordingly.
Section 48(26RS-4;27RS-5;28RS-6)
4. Mill 2" across the inside shoulder and lane one extending 6" past centerline.
5. Place 2" base binder course across the inside shoulder and lane one extending 6" past centerline.
6. Place 2" surface course across the inside shoulder and lane one extending 6" past centerline.
7. Close lane two to traffic and maintain a single lane of traffic on lane one using Highway Standards 701401, 701406, or 701411 as applicable for the location.
8. Mill 2" at the centerline on lane two extending 6" past the outside shoulder joint to provide a clean edge for paving. Placement of leveling binder must take place before opening lane two to avoid a drop off in excess of 4".
9. Place 2" base binder course lane two extending 6" onto the outside shoulder.
10. Place 2" surface course on lane two extending 6" onto the outside shoulder.
11. Mill 1.5" on outside shoulder including the 6" previously placed past the edge of lane two to provide a clean edge for paving.
12. Place 1.75" HMA shoulder binder course on outside shoulder.
13. Place 2" HMA shoulder surface course on outside shoulder.
I-74 RAMPS
It is anticipated that construction on ramps will take place under complete weekend closure using Highway Standard 701451, detours and ramp closure restrictions shown on the plans, and as described below:
1. Mill 1.5" across inside shoulder and ramp.
2. Place 1.75" HMA binder course across inside shoulder and ramp extending 6" past outside shoulder joint.
3. Place 2" surface course across inside shoulder and ramp 6" past outside shoulder joint.
4. Mill 1.5" on outside shoulder including the 6" previously placed past the outside shoulder joint to provide a clean edge for paving.
5. Place 1.75" HMA shoulders base course on outside shoulder.
6. Place 2" HMA shoulder surface course on outside shoulder.
Section 48(26RS-4;27RS-5;28RS-6)
EAST MAIN STREET – FOUR-LANE SECTION
1. Perform HMA surface removal, 3.75” on inside lanes and 0.5' past centerline.
2. Perform patching, curb and gutter replacement, and median repairs.
3. Place binder on inside lanes and 0.5' past centerline.
4. Place binder course in left turn lanes and median crossovers.
5. Place surface course on inside lanes and 0.5' past centerline.
6. Joint trim surface course along left turn lanes, and in median crossovers.
7. Place surface course in left turn lanes and median crossovers.
8. Move traffic to inside lanes and close outside lanes and shoulders.
9. Perform HMA surface removal, 3.75" on outside lanes to centerline and HMA surface removal, 2.75" on outside shoulders.
10. Place binder course on outside lanes 0.5' past edge of pavement.
11. Place surface course on outside lanes 0.5' past edge of pavement.
12. Joint trim 0.5' of binder and surface on shoulder back to edge of pavement.
13. Place bottom lift of HMA shoulders.
14. Place top lift of HMA shoulders.
15. Install rumble strips, pavement markings, and RRPM’s.
US 150/IL 97 – TWO-LANE & THREE-LANE SECTIONS
1. Perform partial depth patching and curb repairs.
2. Perform HMA surface removal 1,5".
3. Perform Grade and Shape Shoulders (Special) and Install HMA shoulder 4.25" at locations shown on plans.
4. Place HMA Binder Course on lanes and shoulders monolithically (where shoulders are 6’ or less) in one direction.
5. Place HMA Binder Course on lanes and shoulders monolithically (where shoulders are 6' or less) in opposing direction.
6. Perform HMA surface removal 0.5" on existing HMA shoulders from Sta. 35+00± to Sta. 51+00±.
Section 48(26RS-4;27RS-5;28RS-6)
7. Place HMA surface course on lanes and shoulders monolithically (where shoulders are 6' or less) in one direction.
8. Joint trim HMA Surface Course.
9. Place HMA Surface Course on lanes and shoulders monolithically (where shoulders are 6' or less) in opposing direction.
10. Install guardrail and erosion control aggregate.
11. Place aggregate shoulder wedge.
12. Install centerline and shoulder Rumble Strips, pavement markings, and RRPM’s.
TRAFFIC CONTROL AND PROTECTION (SPECIAL)
No Specific Traffic Control Plan details have been prepared for this contract. The Traffic Control and Protection Standards and details listed in the Traffic Control Plan and Sequence of Operations on the Plans are to serve as a guide for minimum traffic control and protection for the various situations encountered during the construction of the improvement.
This work must be performed in accordance with Article 107.14 of the Standard Specifications for Road and Bridge Construction, the Highway Standards, the Special Provisions, and as specified herein. This work includes all labor, materials, transportation, handling and incidental work necessary to furnish, install, maintain, monitor, relocate, and completely remove all traffic control devices required as indicated in the plans, Special Provisions, and as approved by the Engineer.
The plans do not attempt to detail or define all construction conditions which may require additional installation of traffic control items to meet unforeseen needs, Standard installations may be modified to improve their effectiveness and to better fit certain situations and applications that may arise, including reasonable adjustment of sign spacing. In some instances, one or more Traffic Control and Protection Standard may be used within the same overall area of construction covered by another standard. Modifications, including those not shown on the plans, of these standards are subject to the approval of the Engineer and will not be measured for payment, but the cost will be considered as included in the cost of the TRAFFIC CONTROL AND PROTECTION, (SPECIAL) pay item. The following paragraphs further describe certain work that it to be considered included in the cost of the TRAFFIC CONTROL AND PROTECTION, (SPECIAL) pay item:
The implementation of all Highway Standards listed in the Traffic Control Plan, including any additional deemed necessary, which may not be listed.
All traffic control necessary to transition between stages.
All materials, labor, and equipment associated with the lane closures. This includes furnishing, erecting, removing, and adjusting any Traffic Control installation during any stage.
Section 48(26RS-4;27RS-5;28RS-6)
The cost of furnishing, installation, maintenance, relocation, and removal of all barricades or drums, warning lights, posts, pavement markings, and signs (including temporary) as shown or described in the plans and specifications, and not part of any highway standard for traffic control listed in the Traffic Control Plan, will not be measured for payment, but will be considered as included in the cost of the TRAFFIC CONTROL AND PROTECTION, (SPECIAL) pay item.
Existing regulatory traffic signing must be removed or covered as needed for each stage of construction. The Contractor will furnish, install, and maintain all temporary signing as specified in the plans and Highway Standards. The cost of this work will not be paid for separately but will be governed by Article 107.25 of the Standard Specifications and will be considered as included in the cost of the TRAFFIC CONTROL AND PROTECTION, (SPECIAL) pay item.
The cost of furnishing, installation, relocation, and removal of, and not limited to, extra temporary traffic signal heads, temporary signing, signing adjustments, Type III barricades, and channelizers per the Standard Specifications for Road and Bridge Construction; the IDOT Highway Standards;
and the staging details in the plans will not be paid for separately but will be included in this bid item.
Method of Measurement: All traffic control and protection required by this Special Provisions will be measured for payment on a Lump Sum basis. This includes all traffic control necessary to construct the work as shown in the plans and provide for traffic control for any alterations, modifications, or additions necessary to accommodate the traffic control for any alterations, modifications or additions necessary to accommodate the traffic control to construction the various work items shown in the plans as described herein.
All changeable message signs, speed display trailers, pavement markings that are not part of a Highway Standard, short-term pavement marking installation and removal, temporary guardrail, temporary concrete barrier, temporary impact attenuators, temporary rumble strips, temporary bridge traffic signals, and traffic control surveillance will be measured for payment separately as shown in the plans.
Basis of Payment. This work will be paid for at the contract Lump Sum unit price for TRAFFIC
CONTROL AND PROTECTION, (SPECIAL).
DETOUR SIGNING
This work consists of furnishing, erecting, relocating, and removing all detour route and associated advisory signing as specified in the various ramp closure/detour details.
Basis of Payment: This work will be paid for at the contract Lump Sum price for DETOUR
SIGNING.
Section 48(26RS-4;27RS-5;28RS-6)
HOT-MIX ASPHALT SHOULDER, 4¼"
This work shall include the placement of the bottom lift of Hot-mix Asphalt Shoulders, 4¼" at the locations shown on the plans. The shoulders shall be placed the same day as Grading and Shaping Shoulders (Special) to prevent an overnight drop off and allow access to driveways.
GRADING AND SHAPING SHOULDERS (SPECIAL)
Description. This work consists of the removal and disposal of existing aggregate shoulder material in the locations shown in the plans. This work must be performed in accordance with Section 202 of the Standard Specifications. The shoulder material must be removed to a depth of 5 3/4"± below existing surface elevation at 4' wide to allow the placement of the bottom lift of HMA shoulders.
Method of Measurement. This work will be measured for payment in Feet.
Basis of Payment. This work will be paid for at the contract unit price per Foot for GRADING AND
SHAPING DITCHES (SPECIAL).
HOT-MIX ASPHALT DRIVEWAY PAVEMENT REMOVAL
This work consists of the removal and disposal of existing HMA driveway pavement at the locations shown in the plans. This work will be performed in accordance with Section 440 of the Standard Specifications. No adjustments of quantities will be made for variation in thickness.
This work will be paid for at the contract unit price per Square Yard for HOT-MIX ASPHALT
DRIVEWAY PAVEMENT REMOVAL.
CURB REMOVAL (SPECIAL)
This work consists of furnishing all labor, equipment, and material for the removal of the existing curb attached to the PCC approach pavement at the locations shown in the plans in accordance with Section 440 of the Standard Specifications. The curb removal consists of saw cutting the full depth of the concrete curb. Any reinforcement bars protruding from the PCC pavement must be cut flush with the surface of the approach pavement.
This work will be paid for at the contract unit price per Foot for CURB REMOVAL (SPECIAL) and no additional compensation will be allowed.
Section 48(26RS-4;27RS-5;28RS-6)
CONCRETE CURB (SPECIAL)
This work consists of furnishing all labor, equipment, and material for the construction of Concrete Curb (Special) in accordance with Section 606 of the Standard Specifications and the details in the plans. Reinforcement bars are to be installed as shown in the District 4 Detail No. 630101 and the cost is to be included in the unit bid price for this item.
This work will be paid for at the contract unit price per Foot for CONCRETE CURB (SPECIAL), and no additional compensation will be allowed.
REMOVAL AND REPLACEMENT OF STEEL PLATE BEAM GUARDRAIL, RAIL ELEMENT
This work consists of removing and disposing of all sections of damaged or conflicting rail element plates and all bolts, nuts, washers, blockouts, and other hardware connected with the damaged rail element, and furnishing and installing new 12-gauge guardrail element plates, bolts, nuts, washers, blockouts, and other hardware necessary to repair a damaged guardrail installation.
Elements, plates, nuts, bolts, washers, blockouts, and other hardware are to match the original and adjacent installation as to type and design and are to be galvanized to match the original and adjacent installation.
The Contractor shall make any necessary adjustments to realign existing rail element plates adjacent to rail elements replaced as directed by the Engineer. Unbolting, bolting, adjusting, realigning or any other work necessary to accomplish the desired realignment shall be considered included in the unit price per Foot for Removal and Replacement of Steel Plate Beam Guardrail, Rail Element.
The furnishing and installing of all bolts, nuts, washers, blockouts, and other hardware, necessary to comply with the above, will not be paid for separately. Removing and disposing of damaged rail element plates will not be paid for separately. Rail element plates will be measured for payment in units measured along the top of rail elements, continuously through laps and splices.
This work will be paid for at the contract unit price per Foot for REMOVAL AND REPLACEMENT OF STEEL PLATE BEAM GUARDRAIL, RAIL ELEMENT, and no additional compensation will be allowed.
GUARDRAIL BLOCKS
This work consists of removing and disposing of all sections of damaged guardrail blockouts and all bolts, nuts, washers, and other hardware connected with the damaged blockouts, and furnishing and installing new guardrail blockouts, bolts, nuts, washers, and other hardware necessary to repair a damaged guardrail installation. Blockouts, nuts, bolts, washers, and other hardware are to match the original and adjacent installation as to type and design.
The furnishing and installing of all bolts, nuts, washers, blockouts, and other hardware, necessary to comply with the above, will not be paid for separately. Removing and disposing of blockouts will not be paid for separately. Guardrail Blocks will be measured for payment per Each. One blockout equals one Each.
Section 48(26RS-4;27RS-5;28RS-6)
The Contractor shall make any necessary adjustments to realign existing rail element plates adjacent to blockouts replaced as directed by the Engineer. Unbolting, bolting, adjusting, realigning or any other work necessary to accomplish the desired realignment shall be considered included in the unit price per Each for Guardrail Blocks.
This work will be paid for at the contract unit price per Each for GUARDRAIL BLOCKS, and no additional compensation will be allowed.
STEEL PLATE BEAM GUARDRAIL (SHORT RADIUS)
This…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .