ildot 66P69.065.pdf

PDF 8 MB Posted

Attached to
HMA Milling and Resurfacing, Pavement Marking, Raised Reflective Markers, and ADA Ramps
Solicitation number
66P69
Issued by
Lasalle County, Illinois

About this file

This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 66P69, a highway construction project in Livingston County. The project involves pavement rehabilitation resurfacing work on FAP Route 68 (Illinois Route 23) spanning approximately 15.58 miles from the Vermillion River Bridge south of Streator to the East County Line in Cornell, and on FAS Route 370 (Long Point Road) from Illinois Route 23 to Main Street in Long Point. The work scope includes HMA milling and resurfacing at 1 inch (SMART overlay) for IL-23 and 3 inches (design overlay) for Long Point Road, pavement marking, raised reflective markers, and Americans with Disabilities Act (ADA) compliant ramps. Electronic bids must be submitted through the iCX-Integrated Contractors Exchange system by 12:00 p.m. on November 6, 2026, when bids will be publicly opened. The contract will be awarded to the lowest responsive and responsible bidder, and the IDOT reserves the right to reject any or all proposals, re-advertise, and waive technicalities.

The project is funded with Federal-aid construction funds under Project STP-QNLV(440) in IDOT District 1. The contract includes extensive supplemental specifications, recurring special provisions, and numerous project-specific provisions addressing utility adjustments (including active and abandoned pipelines, electrical, communications, and water facilities), ADA construction layout, traffic control, pavement marking materials, drainage structure repair, environmental remediation for regulated substances at multiple documented sites, and performance requirements for linear delineator panels with mandatory winter performance inspections. No specific pricing, set-asides, or contract duration are detailed in this Notice to Bidders document, which serves primarily to establish bidding procedures and project specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting November 6, 2026

Notice to Bidders, Specifications and Proposal

Contract No. 66P69 LIVINGSTON County Section (101,102)RS-4 & (102)RS-2 Route FAP 68, FAS 370 Project STP-QNLV(440) District 1 Construction Funds

Prepared by F

Checked by

(Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

November 6, 2026 at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

Contract No. 66P69 LIVINGSTON County Section (101,102)RS-4 & (102)RS-2 Project STP-QNLV(440) Route FAP 68, FAS 370 District 1 Construction Funds

This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at the Vermillion River Bridge_south of Streator to ECL in Cornell. The work consists of HMA milling and resurfacing (SMART overlay), pavement marking, raised reflective markers, and ADA ramps. Long Point Rd begins from IL-23 to Main St in Long Point. The work consists of HMA milling and resurfacing (design overlay), pavment marking, raised reflective markers, and ADA ramps. Approximately 15.58 miles gross length.

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAP Route 68 (IL 23) & FAS Route 370 (Long Point Road)

Section (101,102)RS-4 & (102)RS--2 Livingston County

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

Section (101,102)RS-4 & (102)RS--2

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays

Section (101,102)RS-4 & (102)RS--2 i

TABLE OF CONTENTS

LOCATION OF PROJECT

DESCRIPTION OF PROJECT

STATUS OF UTILITIES TO BE ADJUSTED:

CONSTRUCTION LAYOUT SPECIAL (ADA)

FURNISHED EXCAVATION (SPECIAL)

PREPARATION AND RESTORATION OF SIDEWALK WORK AREAS

AGGREGATE SURFACE COURSE, TYPE B

SURFACE COURSE PAVING SEQUENCE

VIBRATORY ROLLER RESTRICTION

CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE

DRAINAGE STRUCTURE REPAIR

DRAINAGE MITIGATION ON MILLING AND RESURFACING PROJECTS

TACK COAT

FILLING EXISTING CULVERTS

REMOVE AND RELAY END SECTIONS

RELOCATE EXISTING MAILBOX

GRATES (SPECIAL)

FURNISH PERMANENT SURVEY MARKERS

FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) AND WATER VALVES TO BE ADJUSTED,

SPECIAL

LINEAR DELINEATOR PANELS, 6 INCH

LINEAR DELINEATOR PANELS, 4 INCH

TEMPORARY INFORMATION SIGNING

MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES

RAIL ELEMENT PLATES

REMOVE CONCRETE BOX CULVERT END SECTION

CONCRETE MEDIAN SURFACE REMOVAL

CONCRETE CURB REPAIR

REPAIR TRAFFIC BARRIER TERMINAL, TYPE 6

AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)

BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)

Section (101,102)RS-4 & (102)RS--2 ii

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)

ENGINEER’S FIELD OFFICE (BDE)

EROSION CONTROL BLANKET (BDE)

FUEL COST ADJUSTMENT (BDE)

GUARDRAIL (BDE)

HOT-MIX ASPHALT (BDE)

HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)

PAVEMENT MARKING (BDE)

PAVEMENT PATCHING (BDE)

PERFORMANCE GRADED ASPHALT BINDER (BDE)

PREFORMED PLASTIC PAVEMENT MARKING (BDE)

RAISED REFLECTIVE PAVEMENT MARKERS (BDE)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SEEDING (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

SINUSOIDAL RUMBLE STRIPS (BDE)

SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)

STEEL COST ADJUSTMENT (BDE)

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)

SURFACE TESTING OF PAVEMENTS – IRI (BDE)

SURVEYING SERVICES (BDE)

TRAINING SPECIAL PROVISIONS (BDE)

IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION .. 86

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WEEKLY DBE TRUCKING REPORTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

Section (101,102)RS-4 & (102)RS--2 iii

WORK ZONE WIDTH RESTRICTION (BDE)

WORKING DAYS (BDE)

PROJECT LABOR AGREEMENT

SWPPP

Section (101,102)RS-4 & (102)RS--2

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of FAP Route 68 (IL 23) & FAS Route 370 (Long Point Road), Project STP- QNLV(440), Section (101,102)RS-4 & (102)RS-2, Livingston County, Contract No. 66P69 and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.

LOCATION OF PROJECT

This project is located on FAP 68 (IL-23), from Vermillion River Bridge south of Streator to ECL in Cornell and FAS 370 (Long Point Road) from IL 23 to Main Street in Long Point.

DESCRIPTION OF PROJECT

The work will consist of pavement rehabilitation resurfacing of 1 ½” (SMART Overlay) for IL-23 and pavement rehabilitation resurfacing of 3 ¾” (Design Overlay) for Long Point Rd. Additional work includes pavement marking, raised reflective pavement markers, and ADA ramps.

Section (101,102)RS-4 & (102)RS--2

STATUS OF UTILITIES TO BE ADJUSTED:

(Effective January 1, 2007; Revised January 24, 2011)

Name & Address of Utility Type Location Estimated Date Relocation Complete

BP (British Petroleum) Pipelines (North America) Inc 30 South Wacker Drive, Ste 900 Chicago, IL 60606

BP Ref # TPR 17568

22” Pipeline BP’s Freeman- Manhattan pipeline crosses IL 23 at an approximate 75 degree angle. It is located approximately 860’ north of E3150N Road (OR approximately station 137+28). There appears to be a yellow marker “366” on the west side of

IL 23.

They also have two 12” idle pipelines approximately 150’ south of the above active pipeline.

The Contractor will have to follow the BP Pipeline guidelines when working near this pipeline.

When excavating within 25’ of a BP Pipeline the contractor should have a BP representative on site. (This is not needed for the idle pipelines.)

No conflicts are anticipated.

No vibratory rollers are permitted above the three pipelines. The contractor will have to furnish their equipment information (make & model numbers, weight, number of axles, axle configuration, track shoe width, etc. to BP prior to working above the pipelines.

Buckeye Partners 6161 Hamiliton Blvd.

Allentown, PA 18106

Buckeye ER# 2025-6923

Abandoned HP petroleum pipeline

The abandoned pipeline crosses IL 23 north of E3150N Road near the same vicinity of the two idle BP pipelines, mentioned above.

Buckeye stated that since this pipeline is abandoned, our Contractor is permitted to commence prudently without a Buckeye representative on site.

No conflicts are anticipated.

Section (101,102)RS-4 & (102)RS--2

ComEd Three Lincoln Center, 6th Fl.

Oakbrook Terrace, IL 60181

ComEd Ref # H282353STR

Electric ComEd provided maps of their facilities in the area.

No conflicts are anticipated.

Village of Cornell 602 East Main Street Cornell, IL 61319

Water, storm sewer, and sanitary sewers

Cornell may have water and sewers within the project area.

They do not have anything in the road (unless we go over 5’ deep).

No conflicts are anticipated.

Fairpoint Communications Communications Fairpoint Communications has not responded.

No conflicts are anticipated.

Frontier 109 E. Market Street Bloomington, IL 61701

Cable Frontier has not stated where their facilities are located.

No conflicts are anticipated.

IL American Water 1000 International Parkway Woodridge, IL 60517

Watermain American Water has watermain along the south ROW of Long point Road.

No conflicts are anticipated.

Mediacom Fiber and cable From the north end of the project, Mediacom has underground fiber along IL 23. It turns to aerial east of N600E Road. See their maps for additional information.

No conflicts are anticipated.

Metro Communications Communications Metro has not responded.

No conflicts are anticipated.

Nicor 1844 Ferry Road Naperville, IL 60563

Nicor Ref # SC26356

Gas Nicor has gas mains near many of the ADA ramps. They appear to be clear of the proposed work.

See the Nicor redline drawings for additional information.

No conflicts are anticipated.

The above represents the best information of the Department and is only included for the convenience of the bidder. The applicable provisions of Section 102 and Articles 105.07, 107.20, 107.37, 107.38, 107.39, 107.40, and 108.02 of the Standard Specifications for Road and Bridge Construction shall apply.

Section (101,102)RS-4 & (102)RS--2

Above utility relocation information reflected as of April 30, 2026.

CONSTRUCTION LAYOUT SPECIAL (ADA)

(Effective January 1, 2022)

This work shall consist of furnishing and placing construction layout stakes for the construction of ADA Ramps shown in the plans. The Contractor shall furnish and place stakes marking the locations and elevations of points indicated in the plans for ADA Ramp Construction. The Contractor shall locate all reference points as shown on the plans and listed herein. Any additional control points required will be identified in the field by the Contractor and all field notes will be kept in the office of the Resident Engineer. The Contractor shall provide field forces, equipment, and material to set all additional stakes for this project, which are needed to establish offset stakes, reference points, and any other horizontal and vertical controls necessary to secure a correct layout for the work.

Layout stakes shall be set to assure conformance to the ADA Ramp design shown on the plans and shall meet the approval of the Engineer. The Contractor shall be responsible for having the finished work conform to the lines, grades, elevations, and dimensions called for in the plans. Any inspection or checking of the Contractor’s layout by the Engineer and the acceptance of all or any part of it shall not relieve the Contractor of his/her responsibility to secure the proper dimensions, grades, and elevations of the work. The Contractor shall exercise care in the preservation of stakes and benchmarks and shall have them reset when any are damaged, lost, displaced, removed, or otherwise obliterated.

Responsibility of the Department. The Department will make random checks of the Contractor’s staking to determine if the work is in conformance with the plans. When the Contractor’s work will tie into work that is being or will be done by others, checks will be made to determine if the work is in conformance with the proposed overall grade and horizontal alignment. Where the Contractor, in setting construction stakes, discovers discrepancies, the Department will check to determine their nature and make whatever revisions are necessary to the plans. Any additional re-staking required by the Engineer will be the responsibility of the Contractor. The additional re-staking done by the Contractor will be paid for according to Article 109.04 of the Standard Specifications. The Department will be responsible for the accuracy of the initial reference points shown in the plans. It is not the responsibility of the Department, except as provided herein, to check the correctness of the Contractor’s stakes. Any apparent errors will be immediately called to the Contractor’s attention and the Contractor will be required to make the necessary correction before the stakes are used for construction purposes. The Contractor shall provide the Engineer a copy of any field notes and layout diagrams produced during the course of the project.

Responsibility of the Contractor. The Contractor shall establish from the given survey points and contract plan information, all the control points or reference points necessary to layout the ADA Ramp elements. The Contractor shall furnish and place the layout stakes. The Contractor shall notify the Engineer when the stakes are complete and available for review and approval by the Engineer at least 3 working days in advance of the actual construction. Field notes shall be kept in standard survey field notebooks and those books shall become the property of the Department at the completion of the project. All notes shall be neat, orderly, and in accepted form.

Measurement and Payment. This work will be paid for at the contract lump sum price for

CONSTRUCTION LAYOUT (SPECIAL).

Section (101,102)RS-4 & (102)RS--2

FURNISHED EXCAVATION (SPECIAL)

(Effective July 1, 1990; Revised October 11, 2024) This work shall consist of excavating, hauling, and placing suitable materials obtained from locations approved by the Engineer from outside the limits of the right of way.

The final surface of all embankment areas shall be seeded. The top 4 in. of the seeded areas shall be vegetation sustaining soil subject to the approval of the Engineer. The cost of shaping the slopes and providing vegetation sustaining soil will not be paid for separately but shall be included in the cost of FURNISHED EXCAVATION (SPECIAL).

Method of Measurement. Furnished excavation will be measured per cubic yard and shall be measured by truck volume methods at the point of unloading. The Engineer and the Contractor shall agree upon the volume of each truck before hauling begins.

Basis of Payment. This work will be paid for at the contract unit price per cubic yard for

FURNISHED EXCAVATION (SPECIAL).

PREPARATION AND RESTORATION OF SIDEWALK WORK AREAS

(Effective March 30, 2023; Revised October 11, 2024)

At any locations where the existing sidewalk elevations require modification to meet ADA compliance, work shall include leveling and shaping of the existing ground/subbase to provide for the required slopes as shown in the plan details, including any furnished excavation and earth excavation necessary to complete the work and restore any disturbed areas.

This work will not be paid for separately but shall be included in the cost of the applicable sidewalk pay items:

• PORTLAND CEMENT CONCRETE SIDEWALK, 4” (SPECIAL)

Earth Excavation required for the removal of non-special waste disposal will be measured and paid for separately.

The Aggregate Base Course, Type B 4” required for the sidewalks will be measured and paid for separately. The grading and preparation of aggregate shall be included in the cost of the pay item.

The Contractor shall restore the sidewalk work area as specified in Article 104.06 of the Standard Specifications. All damage to mowed lawns shall be replaced with an approved sod, and all damage to unmowed fields shall be seeded. This work will not be paid for separately but shall be included in the cost of the associated sidewalk pay items. Restoration items include, but are not limited to, furnished excavation, earth excavation, seeding, sodding, fertilizer nutrients, supplemental watering and erosion control blanket.

AGGREGATE SURFACE COURSE, TYPE B

(Effective January 1, 2007) Add the following to Article 402.07 of the Standard Specifications:

The top layer shall be given a final rolling with a roller meeting the requirements of Article 1101.01.

Section (101,102)RS-4 & (102)RS--2

SURFACE COURSE PAVING SEQUENCE

(Effective July 1, 1990; Revised January 1, 2007) The HMA surface course shall be placed in a sequence that will minimize the time the centerline edge is exposed to traffic. When at the end of a day's operations the exposed centerline edge is greater than 1000 ft. (300 m), the contractor will be required to pave in the adjacent lane on the following work day.

VIBRATORY ROLLER RESTRICTION

(Effective: November 26, 2013)

The use of vibratory rollers in dynamic mode shall not be allowed on bridge decks and in urban areas that may include aging infrastructure under the roadway. These locations will be determined in the field by the Engineer.

The restriction of dynamic vibratory rollers in these areas shall not waive density requirements.

CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE

(Effective May 23, 2001; Revised January 1, 2025)

The Bureau of Bridges and Structures has analyzed the existing structures within the specified construction zone. Based on this analysis, an emptied Material Transfer Device with the identified maximum gross weight restrictions shown for each structure, will be allowed to cross the following structures:

SN 053-0149 (40 tons) SN 053-0153 (40 tons) SN 053-0154 (40 tons) SN 053-0183 (40 tons) SN 053-0189 (40 tons) SN 053-0177 (40 tons) SN 053-2599 (40 tons) SN 053-0157 (40 tons)

If the same Material Transfer Device is used throughout the entire project, it shall be limited to an empty gross weight based on the smallest weight identified in the list above.

DRAINAGE STRUCTURE REPAIR

Description. This work shall consist of repairing existing storm sewer connections to existing inlets or drainage structures at location shown in the plans.

Materials. Materials shall be according to the following sections of the Standard Specifications for Road and Bridge Construction:

Section (101,102)RS-4 & (102)RS--2

Item Article/Section

(a) Controlled Low-strength Material (CLSM) ................................................................................... 1019.02

(b) Nonshrink Grout ................................................................................................................. 1024.02

CONSTRUCTION REQUIREMENTS

General. The Contractor shall remove existing aggregate/soils to expose the connection of the existing storm sewer to the existing drainage structure. The aggregate/soil material shall be removed and stockpiled for subsequent replacement.

The methods of repairs shall be as follows:

(a) If the Engineer determines that the existing grout sealing the storm sewer connection is deteriorated or found to have failed:

(1) The storm sewer pipe shall be cleared of all debris, foreign materials, aggregates and soils around the existing opening of the structure. The storm sewer pipe shall be cleaned with water to provide a positive bonding surface for new grout.

(2) The Contractor shall fill the existing void between the storm sewer pipe and the drainage structure with nonshrink grout approved by the Engineer.

(b) If the Engineer discovers that the existing storm sewer pipe has dislocated from the existing drainage structure:

(1) The storm sewer pipe shall be cleared of all debris, foreign materials, aggregates and soils around the existing opening of the structure. The storm sewer pipe shall be cleaned with water to provide a positive bonding surface for new grout.

The Contractor shall furnish a flexible plastic pipe larger in diameter than the outer diameter of the existing storm sewer pipe and of such length as to slide over the existing storm sewer pipe and extend into the existing drainage structure. This flexible pipe shall be approved by the Engineer prior to installation. The diameter of the hole in the drainage structure shall be increased as needed to accommodate the new pipe. The end of the existing storm sewer pipe and drainage structure shall be cleared of all materials to a sufficient distance from the end of the pipe to slide the flexible pipe over the end and extend into the existing drainage structure a minimum of 6”.

(2) The Contractor shall fill the void between the storm sewer pipe and the drainage structure with nonshrink grout approved by the Engineer.

The entire flexible pipe shall be covered with grout to a min. of 6’’ from the wall of the drainage structure on both the inside and outside of the structure. The grout shall also seal the void around the connection to the satisfaction of the Engineer.

(c) Excavated materials shall be replaced and compacted to the satisfaction of the Engineer. Any remaining voids shall be filled with controlled low-strength material, according to section 593 of the Standard Specifications for Road and Bridge Construction.

Section (101,102)RS-4 & (102)RS--2

Basis of Payment. This work will be paid for the at contract unit price per each for DRAINAGE STRUCTURE REPAIR which price shall include all labor, materials and equipment to complete the work as described herein.

DRAINAGE MITIGATION ON MILLING AND RESURFACING PROJECTS

Milling operations on this project have the potential to cause water encroachment on the travel lanes during and after a rainfall event. The Contractor shall schedule the milling and resurfacing operations to minimize the potential for the encroachment. The Contractor shall be responsible for mitigating any encroachments as directed by the Engineer. Mitigation may include, but not be limited to, constructing lateral ditches through shoulders and modifying then repairing curb inlets to provide drainage.

The work associated with drainage mitigation will be included in the cost of the Hot-Mix Asphalt Surface Removal pay item.

TACK COAT

(Effective December 10, 2025)

Replace the application rate table in Article 406.05 (c)(1) of the Standard Specifications with the following:

Type of Surface to be Tacked Residual Asphalt Rate lb/sq ft Concrete, Existing HMA, and Milled HMA .05 New HMA and Brick .05

FILLING EXISTING CULVERTS

Description. This work shall consist of cleaning and then filling storm sewer or culvert pipes to be abandoned.

Materials. The material to fill the pipes shall be grout meeting the requirements of Section 1024 of the Standard Specifications.

Construction Requirements. The inside of the pipe shall be cleaned of all unsuitable material and debris before placing the grout. The pipe shall be completely filled. The method used for filling the pipe and containing the grout at the pipe ends shall be at the Contractor’s option. If the pipe is over 40’, contractor is required to drill a 4” diameter access hole through the pipe for a second point of access, to ensure grout fills the pipe.

Method of Measurement. The volume for payment of grout will be the measured volume in cubic yards of the culvert to be filled. Cleaning the culvert will not be measured for payment.

Basis of Payment. This work will be paid for at the contract unit price per cubic yard for FILLING

EXISTING CULVERTS.

Section (101,102)RS-4 & (102)RS--2

REMOVE AND RELAY END SECTIONS

Description. This work shall consist of removing and relaying existing precast reinforced concrete flaredend sections at locations shown in the plans.

Materials. Materials shall be according to the following.

Item Article/Section

(a) Precast Reinforced Concrete End Block… 1042.03(c)(d)(e)

(b) Mastic Joint Sealer for Pipe

(c) External Sealing Band…

(d) Fine Aggregate… ............................................................................................................................ 1003.04 (e)

Equipment. Equipment shall be at the approval of the Engineer.

General. This work shall be according to applicable portions of Section 542.07(b)(1) of the Standard Specifications and as modified herein.

Excavation. Locations where end section removal and relaying are designated in the plans, the locations shall be excavated to expose the existing concrete end sections and the excavated material shall be stockpiled to be reincorporated into the new construction. If the Engineer determines that the excavated materials are unsuitable for reuse, the excavated materials shall be disposed of at the direction of the Engineer and replaced with approved material. Furnishing and incorporating new embankment material will be paid for according to Article 109.04 of the Standard Specifications.

Removal. Removal shall consist of the following procedures.

a) Remove existing precast reinforced concrete flared end section(s) and store in a location designated by the Engineer so damage does not occur to the end section.

1) In the event the precast reinforced concrete flared end section is damaged by the Contractor’s removal operations, the precast reinforced concrete flared end section shall be “Replaced” at the Contractor’s expense.

2) If the Engineer determines that the existing precast reinforced concrete flared end section is unsuitable for reuse, the precast reinforced concrete flared end section shall be replaced at the direction of the Engineer. Cost for furnishing a new precast reinforced concrete flared end section shall be paid for according to Article 109.04 of the Standard Specifications.

b) Remove the existing end block (precast toe wall). There will be no salvage to the existing end block.

Relaying End Section. Relaying existing precast reinforced concrete flared end section(s) shall be as follows.

a) Install the new end block (precast toe wall) on a prepared subbase to match the existing flowline elevation of the existing precast reinforced concrete flared end section.

Section (101,102)RS-4 & (102)RS--2

1) When necessary, the existing location(s) for the end block installation shall be excavated a minimum of 4” below the existing flowline elevation of the existing precast reinforced concrete flared end section. Excavated materials shall be reused and incorporated into the new construction.

2) Prepared subbase shall be a minimum of 4” and compacted to the satisfaction of the Engineer.

3) The new end block (precast toe wall) shall be according to the requirements of Standard

542301. The end block when installed and shall be leveled and plumbed. The Engineer shall approve of the end block installation prior to relaying the existing precast reinforced concrete flared end section.

b) Relay existing precast reinforced concrete flared end section according to applicable portions of Section 542 of the Standard Specifications to match existing flowline elevation(s).

Method of Measurement. This work will be measured for payment as follows.

a) Contract Quantities. The requirements for the use of contract quantities shall conform to Article 202.07(a).

b) Measured Quantities. This work will be measured for payment per each end section removed and relayed.

Necessary excavations and Subbase material when required shall not be paid for separately but shall be included in the cost of the related work.

Basis of Payment. This work will be paid for at the contract unit price per each for REMOVE AND RELAY END SECTIONS which price shall be payment in full to complete this work.

RELOCATE EXISTING MAILBOX

Description. This work shall consist of removing existing mailbox and installing it at a location approved by the post office.

Basis of Payment. This work will be paid for at the contract unit price per each for RELOCATE EXISTING MAILBOX, which price shall include furnishing the wood post and installing the box to the satisfaction of the Engineer.

GRATES (SPECIAL)

Description. This work shall consist of furnishing all labor, equipment, and material to furnish and install new grates at the locations specified in the plans and as directed by the Engineer. This work shall be in accordance with Section 602 of the Standard Specifications and the detail provided in the plans.

Method of Measurement. This work will be measured per each grate.

Basis of Payment. This work will be paid for at the contract unit price per each for GRATES

(SPECIAL).

Section (101,102)RS-4 & (102)RS--2

FURNISH PERMANENT SURVEY MARKERS

(Effective May 28, 2025)

Description. Survey markers shall be in general accordance with Highway Standard 667101, except they shall be bronze instead of aluminum and shall have a diameter of 3.5 inches. They shall be stamped “SECTION CORNER” as a circular row of text inside the words “ILLINOIS DEPARTMENT OF TRANSPORTATION” and shall have a “+” stamped in the center instead of a dimpled triangle.

The Engineer will supply a Professional Land Surveyor and equipment for installation of the survey markers. The Contractor shall supply traffic control for installation of the survey markers by the Engineer.

Basis of Payment. This work will be paid for at the contract unit price per each for FURNISH

PERMANENT SURVEY MARKERS.

FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) AND WATER VALVES TO BE

ADJUSTED, SPECIAL

(Effective June 1, 2012)

Description. This work shall consist of adjusting frames and lids and water valves. This work shall be done according to the applicable portions of Section 603 of the Standard Specifications and the following.

Construction Requirements. Prior to the milling operation, the Contractor shall remove all frames and lids of manholes and water valves. After removal, the Contractor shall place a suitable metal plate over the manhole and water valve locations and backfill the area with a temporary hot-mix or cold-mix asphalt mixture. The Contractor shall then complete the milling and placement of all HMA lifts except surface course.

Prior to placing the surface course, the Contractor shall reinstall the frames and lids and water valves and adjust them to the finished pavement elevation.

The excavated area around the manholes and water valves shall be filled with Class PP-1 or PP-2 concrete.

Basis of Payment. This work will be paid at the contract unit price each for FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) and WATER VALVES TO BE ADJUSTED, SPECIAL.

LINEAR DELINEATOR PANELS, 6 INCH

(Effective April 28, 2017)

Description. Linear delineator panels shall be placed on each parapet wall 6 inches down from the top. Panels shall also be placed on structures containing bridge rail as directed by the Engineer.

Section (101,102)RS-4 & (102)RS--2

These panels shall be either white or yellow, matching the color of the adjacent pavement marking edge line. They should be spaced at a minimum of 80 foot centers horizontally, with the first and last panel located within 20 feet of the parapet wall ends. Structures that contain existing linear delineator panels shall have any damaged or missing panels removed and replaced as directed by the Engineer.

When attaching linear delineator panels to concrete, the panels shall be secured using an anchor bolt method approved by the Engineer that will anchor the entire panel securely but also facilitate removal of the panel by maintenance operations if damaged or weathered in the future. The Contractor shall also sufficiently cover the back side of the linear delineator panel, to the satisfaction of the Engineer, with an adhesive caulking system to aid in the permanent adhesion and alignment of the panels prior to drilling through the pre-drilled linear delineation system holes.

When securing the linear delineator panels to metal bridge rail or any other metal surfaces, the Contractor may use a linear delineation system panel and bracket mounting method approved by the Engineer. The Contractor may also use an adhesive caulking method to sufficiently cover the back side of the linear delineator panel to the satisfaction of the Engineer. The Contractor shall be responsible for testing the durability and strength of the method used to ensure permanent adhesion of the linear delineator panel to the bridge rail. Drilling into metal bridge rail or other metal surfaces to secure the linear delineator panels will not be permitted.

When removing and replacing missing or damaged linear delineator panels, the existing linear delineator panels and any adhesive used to secure the existing linear delineator panels shall be removed to the satisfaction of the Engineer. All cost and labor associated with the removal and cleanup of the existing linear delineator panels shall be included in the unit price of the pay item

LINEAR DELINEATOR PANELS, 6 INCH.

Each panel shall not be less than 34 inches in length and 6.00 inches in width. The panels shall be constructed of cube-corner retroreflective material in standard highway colors permanently bonded to an aluminum substrate. The lateral edges of each panel shall be hemmed. The panel assembly shall have a repeating raised lateral ridge every 2.25 inches. Each ridge shall be 0.34 inches high with a 45° profile and a 0.28 inch radius top.

Daytime color requirements shall be determined from measurement of the retroreflective sheeting applied to aluminum test panels. Daytime color shall be measured instrumentally using a spectrophotometer employing annular 45/0 (or equivalent 0/45) illuminating and viewing geometry. Measurements shall be made in accordance with ASTM E1164 for ordinary colors or ASTM E2153 for fluorescent colors. Chromaticity coordinates shall be calculated for CIE Illuminant D65 and the CIE 1931 (2o) Standard Colorimetric Observer in accordance with ASTM E308 for ordinary colors or ASTM E2152 for fluorescent colors.

Section (101,102)RS-4 & (102)RS--2

Chromaticity Limits for White x y x Y x y x y Limit Y (%)

Min Max

White 0.303 0.287 0.368 0.353 0.340 0.380 0.274 0.316 40 -

Chromaticity Limits for Fluorescent Yellow x

Y y

Total Luminance

Factor YT (%) Min

Fluor.

0.521

0.424

0.557

0.442

0.479

0.520

0.454

0.491

40 Yellow

Inspection of Linear Delineator Panels. The linear delineator panels installed under this contract will be inspected following installation, but no later than December 30th. In addition, they will be inspected following a winter performance period that extends 180 days from December 30th.

Within 15 calendar days after the end of the winter performance period, a final performance inspection will be made. If this inspection discloses any work which is not visibly intact and serviceable, the Contractor shall, within 30 calendar days, completely repair or replace such work to the satisfaction of the Engineer.

Measured in its entirety, the work shall be 97 percent intact.

Upon completion of the final performance inspection, or after satisfactory completion of any necessary corrections, the Engineer shall notify the Contractor in writing of the date of such final performance inspection and release him/her from further performance responsibility.

This delay in performance inspection and performance acceptance of the linear delineator panels shall not delay acceptance of the entire project and final payment due if the contractor requires and receives from the subcontractor a third party “performance” bond naming the Department as obligee in the full amount of all linear delineator panels listed in the contract, multiplied by the contract unit price. The bond shall be executed prior to acceptance and final payment of the non-linear delineator panel items and shall be in full force and effect until final performance inspection and performance acceptance of the linear delineator panels. Execution of the third-party bond shall be the option of the Contractor.

Basis of Payment. This work, including all materials, equipment, and labor necessary to complete the work as described will be paid for at the contract unit price per each for LINEAR DELINEATOR

PANELS, 6 INCH.

Section (101,102)RS-4 & (102)RS--2

LINEAR DELINEATOR PANELS, 4 INCH

Description. This work shall consist of furnishing and installing linear delineators on steel plate beam guardrail at locations shown on plan details.

General. Linear delineator panels shall be attached to steel plate beam guardrail as shown on plan details and as directed by the Engineer. These panels shall be either white or yellow, matching the color of the adjacent pavement marking edge line. They should be spaced at a minimum of 80-foot centers horizontally, with a minimum of two linear delineator per guardrail run.

Linear delineators shall not be placed on guardrail terminal sections. Linear delineator spacing through horizontal curves where the normal speed limit is reduced, the spacing of the linear delineators shall be reduced to 40-foot centers. Existing steel plate beam guardrail that contain existing linear delineator panels shall have any damaged or missing panels removed and replaced by the Engineer.

When securing the linear delineator panels to steel plate beam guardrail, the Contractor may use a linear delineation system panel and bracket mounting method approved by the Engineer. Linear delineation system panel and bracket including installation methods shall be according to the manufacture’s recommendations.

The Contractor shall be responsible for testing the durability and strength of the method used to ensure permanent adhesion of the linear delineator panel to the bridge rail. Drilling into metal bridge rail or other metal surfaces to secure the linear delineator panels will not be permitted.

When removing and replacing missing or damaged linear delineator panels, the existing linear delineator panels and any adhesive or bracket when used to secure the existing linear delineator panels shall be removed to the satisfaction of the Engineer. All cost and labor associated with the removal and cleanup of the existing linear delineator panels shall not be paid for separately but shall be included in the cost of this work.

Each panel shall not be less than 34 inches in length and 4.00 inches in width. The panels shall be constructed of cube-corner retroreflective material in standard highway colors permanently bonded to an aluminum substrate. The lateral edges of each panel shall be hemmed. The panel assembly shall have a repeating raised lateral ridge every 2.25 inches. Each ridge shall be 0.34 inches high with a 45° profile and a 0.28-inch radius top.

Daytime color requirements shall be determined from measurement of the retroreflective sheeting applied to aluminum test panels. Daytime color shall be measured instrumentally using a spectrophotometer employing annular 45/0 (or equivalent 0/45) illuminating and viewing geometry. Measurements shall be made in accordance with ASTM E1164 for ordinary colors or ASTM E2153 for fluorescent colors. Chromaticity coordinates shall be calculated for CIE Illuminant D65 and the CIE 1931 (2o) Standard Colorimetric Observer in accordance with ASTM E308 for ordinary colors or ASTM E2152 for fluorescent colors.

Section (101,102)RS-4 & (102)RS--2

Chromaticity Limits for White x y x Y x y x y Limit Y (%)

Min Max

White 0.303 0.287 0.368 0.353 0.340 0.380 0.274 0.316 40 -

Chromaticity Limits for Fluorescent Yellow tal Luminance

Factor YT Min

Fluor.

0.521

0.424

0.557

0.442

0.479

0.520

0.454

0.491

40 Yellow

Inspection of Linear Delineator Panels. The linear delineator panels installed under this contract will be inspected following installation. In addition, they will be inspected following a winter performance period that extends 180 days from December 30th.

Within 15 calendar days after the end of the winter performance period, a final performance inspection will be made. If this inspection discloses any work which is not visibly intact and serviceable, the Contractor shall, within 30 calendar days, completely repair or replace such work to the satisfaction of the Engineer.

Measured in its entirety, the work shall be 97 percent intact.

Upon completion of the final performance inspection, or after satisfactory completion of any necessary corrections, the Engineer shall notify the Contractor in writing of the date of such final performance inspection and release him/her from further performance responsibility.

This delay in performance inspection and performance acceptance of the linear delineator panels shall not delay acceptance of the entire project and final payment due if the contractor requires and receives from the subcontractor a third party “performance” bond naming the Department as obligee in the full amount of all linear delineator panels listed in the contract, multiplied by the contract unit price. The bond shall be executed prior to acceptance and final payment of the non-linear delineator panel items and shall be in full force and effect until final performance inspection and performance acceptance of the linear delineator panels. Execution of the third-party bond shall be the option of the Contractor.

Basis of Payment. This work, including all materials, equipment, and labor necessary to complete the work as described will be paid for at the contract unit price per each for LINEAR DELINEATOR

PANELS, 4 INCH.

Section (101,102)RS-4 & (102)RS--2

TEMPORARY INFORMATION SIGNING

(Effective September 24, 2013; Revised July 31, 2020)

Description. This work shall consist of the furnishing, installation, maintenance, and removal of temporary information signs.

Materials. Materials shall be according to the applicable portions of Section 701 of the Standard Specifications and as shown on the plans.

Construction Requirements. The temporary information signs shall be in place at least one week prior to the beginning of construction activities that impact traffic flow and shall remain in place until the completion of the project. If all lanes are open for an extended period of time during the project, the Contractor shall cover the signs until lane closures resume. If the project is shut down for the winter, the signs shall read “Road Work Resumes Spring XXXX.”

Signs shall be installed according to the requirements of Section 701.

Method of Measurement. This work will be measured for payment in square feet in place. The auxiliary sign panel will not be measured for payment.

Basis of Payment. This work will be paid for at the contract unit price per square foot for

TEMPORARY INFORMATION SIGNING.

MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS

(Effective March 30, 2023)

Description. This work consists of furnishing and applying modified urethane pavement marking according to Section 780 of the Standard Specifications except that the modified urethane shall be applied in two applications.

Materials. Each application shall meet the requirements of Article 780.12 of the Standard Specifications.

CONSTRUCTION REQUIREMENTS

General. The first application shall be allowed to cure for a minimum of 14 days prior to placing the second application over the first. The Contractor shall not place one thick application in lieu of two regular applications.

Basis of Payment. Each application will be measured and paid for.

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES

Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.

Contract Specific Work Areas. For stationing, the lateral distance is measured from centerline and the farthest distance is the offset distance or construction limit, whichever is less.

Section (101,102)RS-4 & (102)RS--2

The following contract specific work areas shall be monitored by the Environmental Firm for soil contamination and workers protection.

• Station 168+07 (RT) (NE quadrant of Market Street). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(5).

Contaminants of concern sampling parameters: VOCs, SVOCs, and Metals.

Site 4799-91 – Commercial Building, 128 E. 4th Street, Long Point, Livingston County

• Station 168+92 (LT) (SW quadrant of Market Street). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(1).

Contaminants of concern sampling parameters: VOCs, SVOCs, and Metals.

Site 4799-128 – Farmstead, 8991 E. 2500 N Road, unincorporated Amity Township, Livingston County

• Station 696+00 to Station 701+00 (LT). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(1). Contaminants of concern sampling parameters: VOCs, SVOCs, and Metals.

Site 4799-144 – Caseys Gasoline Station, 308 W. Main Street, Cornell, Livingston County

• Station 117+80 to Station 118+65 (LT). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(5). Contaminants of concern sampling parameters: VOCs, SVOCs, and Metals.

Site 4799-157 – Commercial Building, 601 E. Main Street, Cornell, Livingston County

• Station 124+00 (RT) (SE quadrant of 6th Street). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(5).

Contaminants of concern sampling parameters: VOCs, SVOCs, and Metals.

4799-166 – Residence, 701 E. Main Street, Cornell, Livingston County

• Station 127+76 (RT) (SE quadrant of 7th Street). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(5).

Site 4799-168 – Residence, 712 E. Main Street, Cornell, Livingston County

• Station 131+78 (LT) (NW quadrant of 8th Street). The Engineer has determined this material meets the criteria of and shall be managed in accordance to Article 669.05(a)(5).

Work Zones Three distinct OSHA HAZWOPER work zones (exclusion, decontamination, and support) shall apply to projects adjacent to or within sites with documented leaking underground storage tank (LUST) incidents, or sites under management in accordance with the requirements of the Site Remediation Program (SRP), Resource Conservation and Recovery Act (RCRA), or Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), or as deemed necessary. For this project, the work zones apply for the following ISGS PESA Sites:

None.

Additional information on the contract specific work areas listed above collected during the regulated substances due-diligence process is available through the District’s Environmental Studies Unit (DESU).

Section (101,102)RS-4 & (102)RS--2

Any waste generated as a special waste or a waste not certified as a non-special waste from this project should be manifested off-site using the IEPA Bureau of Land generator number associated IDOT right-of-way in the affected county. The IEPA generator number for IDOT right-of-way in Livingston County is 1058995003.

RAIL ELEMENT PLATES

This work consists of removing and disposing of all sections of damaged or conflicting rail element plates…

This is the start of the file's text. The full file is on GovTribe.