This file is an ACIP (Airport Capital Improvement Program) package for fiscal years 2028-2032 prepared for the Arizona Department of Transportation (ADOT) related to the Kingman Municipal Airport & Industrial Park (IGM). The document appears to be a multi-year airport planning and capital improvement program that outlines proposed projects and initiatives for the airport's development over the five-year planning period. The City of Kingman is soliciting Statements of Qualifications from qualified firms to provide airport planning and environmental services necessary to support project implementation and planning activities. Responses to the Request for Qualifications (RFQ 2026-RFQ-021) are due by 12:00 p.m. Arizona time on Tuesday, December 8, 2026, with questions due by 12:00 p.m. Arizona time on Monday, November 23, 2026. All submissions must be completed through the City of Kingman's OpenGov procurement portal, and mailed, faxed, hand-delivered, or emailed responses will not be accepted.
Qualified firms must demonstrate the ability to provide specialized airport planning and environmental staff capable of executing specific disciplines required to complete each approved task under the on-call contract. The City reserves the right to reject any response that does not comply with solicitation procedures and requirements, as well as the right to reject any response when cancellation is in the City's best interest. The solicitation does not indicate specific pricing terms, set-asides, or funding amounts within the available documentation. Firms interested in receiving notification of future solicitations from the City of Kingman should register for free accounts and subscribe through the OpenGov procurement portal at https://procurement.opengov.com/portal/cityofkingman.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IGM_ON_CALL_PLANNING_AND_ENVIROMENTAL_SERVICES.pdf | ||
| IGM_DBE_Goal_Methodology_2025-2027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: 6/4/2025
Airport: KINGMAN MUNICIPAL AIRPORT State: AZ LOCID IGM
FED/
STATE
FAA 2027 / ADOT 2028
Construct (Phase 1) Reconstruction of Taxiway D (4,500' x 75') and Connector Taxiways (2) (400' x 53' ea).
Taxiway D is constructed of asphaltic concrete pavement that is beyond its useful life with a PCI of 44 (estimated to be 41 in 2025) and needs to be reconstructed. Reconstructing Taxiway D and its Connectors will also bring the taxiway connectors up to standard geometry, and increase overall safety. Delta is the primary Taxiway for Runway 3-21.
$ 5,372,540 $ 263,730 $ 263,730 $5,900,000.00
FAA
ADOT
CITY
2 Design Corner Apron Reconstruction (Approx. 35,000 SY) The apron area between the South Ramp and the Dross Site is in desperate need of reconstruction. PCI of 0 (2022 inspection). Severe alligator cracking and raveling.
$ 190,000 $ 5,000 $ 5,000 $200,000
FAA IIJA
AIG
Design and Construct Runway 3 Blast Pad Expansion (Approx. 400' x 25')
This project will increase the dimensions of the blast pads to meet current standards. $ 270,000 $ 30,000 $300,000
ADOT
CITY
FAA 2028 / ADOT 2029
Construct (Phase 2) Reconstruction of Taxiway D (2,825' x 75') and Connector Taxiways (2) (400' x 53' ea).
Taxiway D is constructed of asphaltic concrete pavement that is beyond its useful life with a PCI of 44 (estimated to be 41 in 2025) and needs to be reconstructed. Reconstructing Taxiway D and its Connectors will also bring the taxiway connectors up to standard geometry, and increase overall safety. Delta is the primary Taxiway for Runway 3-21.
$ 4,097,700 $ 201,150 $ 201,150 $4,500,000.00
FAA
ADOT
CITY
2a Construct Replace Runway Lighting - Phase 1 (Runway 3-21)
This project would replace Runway 3-21 edge lighting, regulator, and controls. The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
$540,000 $60,000 $600,000
2b Construct Replace Airfield Guidance Signs - Phase 1 (Runway 3-21 Guidance and Distance Remaining Signs)
This project would replace Runway 3-21 Guidance and Distance Remaining Signs. The existing airfield signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
$198,000 $22,000 $220,000
2c Construct Airfield NAVAIDS - Phase 1 Upgrade REILs on Runway 3-21
Runway 3-21 currently has older incandesant runway end identification lights (REILs) which are beyond useful life. This project would upgrade the REILs to more dependable and efficient LED.
$135,000 $15,000 $150,000
$873,000 $97,000 $970,000 totals
FAA 2029 / ADOT 2030
1 Construct Transient Apron Mill and Overlay (Approx. 132,000 SY) Pavement rehabilitation for airport apron. PCI is 57 - 63. PMMP indicates that a mill and overlay is needed now to preserve and extend the life of this investment. (the City will look at contributing 10%)
$ 4,105,440 $ 214,560 $ 480,000 $4,800,000
CITY
FAA
ADOT
2a Construct Replace Runway Lighting - Phase 2 (Runway 17-35)
This project would replace Runway 17-35 edge lighting, regulator, and controls. The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
$423,000 $47,000 $470,000
2b Construct Replace Airfield Guidance Signs - Phase 2 (Runway 17-35 and Taxiway C)
This project would replace airfield signs, regulators, and controls. The existing airfield signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
$153,000 $17,000 $170,000
2c Construct Airfield NAVAIDS - Phase 2 Implement REILs on Runway 17-35
Runway 17-35 currently does not have runway end identification lights (REILs). This project would Intall REILs on each end of Runway 17‐35.
$126,000 $14,000 $140,000
Construct Replace Taxiway Lighting - Phase 2 (Taxiway C)
This project would replace taxiway edge lighting, regulators, and controls. The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
$531,000 $59,000 $590,000
$1,233,000 $137,000 $1,370,000 totals
FAA 2030 / ADOT 2031
Design and Construct Upgrade Airfield Access Control System and Gate Improvements
Install an integrated and networked access control system for all airfield access gates. The existing system is a cipher code system that is not networked and is significantly less secure than a networked and monitored system. Also improve all access gates to meet current security standards.
$ 1,138,250 $ 55,875 $ 55,875 $1,250,000
FAA
ADOT
CITY
Design TW A Rehabilitation, Geometry and Lighting & Signage Update (2,300' x 75')
Taxiway A is in need of rehabilitation and the geometry needs to be revised per the ALP. PCI 52 (estimated to be 44 in 2028). $ 182,120 $ 8,940 $ 8,940 $200,000
ADOT
CITY
FAA 2031 / ADOT 2032
Construct TW A Rehabilitation and Geometry Update (2,300' x 75')
Taxiway A is in need of rehabilitation including the existing airfield lighting and signage, the geometry needs to be revised per the ALP.
PCI 52 (estimated to be 44 in 2028).
$ 1,821,200 $ 89,400 $ 89,400 $2,000,000
FAA
ADOT
CITY
2 Construct TW A Lighting & Signage Update This project would replace taxiway edge lighting, airfield signs, regulators, and controls. The existing airfield lighting and signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to more dependable and efficient LED.
$ 455,300 $ 22,350 $ 22,350 $500,000
ADOT
CITY
Components of the Airfield Lighting and Signage Upgrades Project
Increased City Contribution to Funding
KINGMAN AIRPORT
AIRPORT CAPITAL IMPROVEMENT PROGRAM
FY 2028-2032
Priority
No.
Project Description & Fiscal Year Project Justification
Federal
Funds State Funds Sponsor Total
ADOT
CITY
ADOT
CITY
Federal Aviation Administration and Arizona Department of Transportation
Five-Year Capital Improvement Program
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
8/20/2026 9:58:06AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $5,900,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Twy D is constructed of asphaltic concrete pavement that is beyond its useful life (PCI approximately 41) & needs to be reconstructed. This project will also bring the Twy Connectors up to standard geometry & increase overall safety.
Construct (Phase 1) Reconstruction of Taxiway D (4,500 ft x 75 ft) and Connector
Taxiways (2 at 400 ft x 53 ft each) Y
Y
CatEx
N
2028-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $200,000 Apron:Rehabilitate Apron - Reconstruction
The apron area between the South Ramp and the Dross Site is in desperate need of reconstruction. PCI of 0 (2022 inspection). Severe alligator cracking and raveling.
Design Corner Apron Reconstruction (approximately 35,000 SY) Y
N
CatEx
N
2028-2 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $300,000 Runway, Construct
This project will increase the dimensions of the blast pads to meet current standards.
Design and Construct Runway 3 Blast Pad Expansion (approximately 400 ft x 25
ft) Y
N
CatEx
N
2028-3 State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $4,500,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Twy D is constructed of asphaltic concrete pavement that is beyond its useful life (PCI approximately 41) & needs to be reconstructed. This project will also bring the Twy Connectors up to standard geometry & increase overall safety.
Construct (Phase 2) Reconstruction of Taxiway D (2,825 ft x 75ft) and Connector
Taxiways (2 at 400 ft x 53 ft each) Y
Y
CatEx
N
2029-1 Federal, State, and
Local
1of 4
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
8/20/2026 9:58:06AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $600,000 Runway MIRL/HIRL, Install
This project would replace Runway 3-21 edge lighting, regulator, and controls.
The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
Construct Replace Runway Lighting - Phase 1 (Runway 3-21)
(Components of the Airfield Lighting and Signage Upgrades Project) Y
Y
CatEx
N
2029-2a State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $220,000 Guidance Signage, Install (New)
This project would replace Runway 3-21 Guidance and Distance Remaining
Signs. The existing airfield signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
Construct Replace Airfield Guidance Signs - Phase 1 (Runway 3-21 Guidance and
Distance Remaining Signs)
(Components of the Airfield Lighting and Signage Upgrades Project)
Y
Y
CatEx
N
2029-2b State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $150,000 Runway Vertical/Visual Guidance System, Install/Upgrade
Runway 3-21 currently has older incandescent Runway end identification lights
(REILs) which are beyond useful life. This project would upgrade the REILs to more dependable and efficient LED.
Construct Airfield NAVAIDS - Phase 1 (Upgrade REILs on Runway 3-21)
(Components of the Airfield Lighting and Signage Upgrades Project) Y
Y
CatEx
N
2029-2c State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $4,800,000 Apron:Rehabilitate Apron - Reconstruction
PCI is approximately 57 - 63. PMMP indicates that a mill and overlay is needed now to preserve and extend the life of this investment. (The City will look at contributing 10 percent)
Construct Transient Apron Mill and Overlay (approximately 132,000 SY) Y
N
CatEx
Y
2030-1 Federal, State, and
2of 4
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
8/20/2026 9:58:06AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $470,000 Runway MIRL/HIRL, Install
This project would replace Runway 17-35 edge lighting, regulator, and controls.
The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
Construct Replace Runway Lighting - Phase 2 (Runway 17-35)
(Components of the Airfield Lighting and Signage Upgrades Project) Y
Y
CatEx
N
2030-2a State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $170,000 Guidance Signage, Install (New)
This project would replace airfield signs, regulators, and controls. The existing airfield signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
Construct Replace Airfield Guidance Signs - Phase 2 (Runway 17-35 and Taxiway
C)
(Components of the Airfield Lighting and Signage Upgrades Project)
Y
Y
CatEx
N
2030-2b State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $140,000 Runway Vertical/Visual Guidance System, Install/Upgrade
Runway 17-35 currently does not have runway end identification lights (REILs).
This project would Install REILs on each end of Runway 17-35.
Construct Airfield NAVAIDS - Phase 2 (Implement REILs on Runway 17-35)
(Components of the Airfield Lighting and Signage Upgrades Project) Y
Y
CatEx
N
2030-2c State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $590,000 Taxiway Lighting, Install (New)
This project would replace taxiway edge lighting, regulators, and controls. The existing airfield lighting is beyond useful life, getting difficult to maintain, and in need of an upgrade to LED.
Construct Replace Taxiway Lighting - Phase 2 (Taxiway C)
(Components of the Airfield Lighting and Signage Upgrades Project) Y
Y
CatEx
N
2030-2d State and
3of 4
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
8/20/2026 9:58:06AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2031 $1,250,000 Equipment:Acquire Security Equipment/Install Fencing [Required By Part 107] - Safety/Security
The existing system is a cipher code system that is not networked & is significantly less secure than a networked & monitored system.
Design & Construct Upgrade Airfield Access Control System & Gate
Improvements. Install an integrated & networked access control system for all airfield access gates/improve all access gates to meet current security standards
Y
N
CatEx
N
2031-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2031 $200,000 Taxiway, Rehabilitate
Taxiway A is in need of rehabilitation, and the geometry needs to be revised per the ALP. PCI 52 (estimated to be 44 in 2028).
Design TW A Rehabilitation, Geometry and Lighting & Signage Update (2,300 ft x 75 ft) Y
N
CatEx
N
2031-2 State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2032 $2,000,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Taxiway A is in need of rehabilitation including the existing airfield lighting and signage, the geometry needs to be revised per the ALP. PCI 52 (estimated to be
44 in 2028)
Construct Taxiway A Rehabilitation and Geometry Update (2,300 ft x 75 ft) Y
N
CatEx
N
2032-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2032 $500,000 Taxiway Lighting, Install (New)
The existing airfield lighting and signage is beyond useful life, getting difficult to maintain, and in need of an upgrade to more dependable and efficient LED.
Construct Taxiway A Lighting & Signage Update (replace taxiway edge lighting, airfield signs, regulators, and controls) Y
N
CatEx
N
2032-2 State and
4of 4
LEGEND
PREPARED: (FY )7/2026 2027
:4
4:
P M
Ju l 2 7, rb eh m
F:
\P ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
2 DESIGN CORNER APRON RECONSTRUCTION
(APPROX. 35,000 SY)
1 CONSTRUCT (PHASE 1) RECONSTRUCTION OF TAXIWAY D
(4,500' X 75') AND CONNECTOR TAXIWAYS (2) (400' X 53' EA) 3 DESIGN AND CONSTRUCT BLAST PAD EXPANSION
(400' X 25')
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
rbehm Text Box
FAA FY2027 (ADOT FY2028)
PREPARED: (FY )7/2026 2028
:4
5:
P M
Ju l 2 7, ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
2a CONSTRUCT REPLACE RUNWAY LIGHTING - PHASE 1
(RUNWAY 3-21)
2b CONSTRUCT REPLACE AIRFIELD GUIDANCE SIGNS - PHASE 1
(RUNWAY 3-21 GUIDANCE AND DISTANCE REMAINING SIGNS)
2a
2b
1 CONSTRUCT (PHASE 2) RECONSTRUCTION OF TAXIWAY D
(2,825' X 75') AND CONNECTOR TAXIWAYS (2) (400' X 53' EA)
2c CONSTRUCT AIRFIELD NAVAIDS - PHASE 1
UPGRADE REILS ON RUNWAY 3-21
2c
2c
COMPONENTS OF THE AIRFIELD LIGHTING, SIGNS AND NAVAIDS UPGRADES PROJECT
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
rbehm
FAA FY2028 (ADOT FY2029)
PREPARED: (FY )7/2026 2029
:4
6:
P M
Ju l 2 7, ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
CONSTRUCT TRANSIENT APRON MILL AND OVERLAY
(APPROX 132,000 SY)
2a CONSTRUCT REPLACE RUNWAY LIGHTING - PHASE 2
(RUNWAY 17-35)
2a
2b
(TYP)
2c
2c
2b
(TYP)
2b
(TYP)
2a
2b
2d
2d CONSTRUCT REPLACE TAXIWAY LIGHTING - PHASE 2 (TAXIWAY C)2b CONSTRUCT REPLACE AIRFIELD GUIDANCE SIGNS - PHASE 2
(RUNWAY 17-35 AND TAXIWAY C)
2c CONSTRUCT AIRFIELD NAVAIDS - PHASE 2
INSTALL REILS ON RUNWAY 17-35
COMPONENTS OF THE AIRFIELD LIGHTING, SIGNS AND NAVAIDS UPGRADES PROJECT
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
rbehm
FAA FY2029 (ADOT FY2030)
PREPARED: (FY )7/2026 2030
:4
6:
P M
Ju l 2 7, ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
2 DESIGN TW A REHABILITATION, GEOMETRY AND
LIGHTING & SIGNAGE UPDATE (2,300' x 75')
1 DESIGN AND CONSTRUCT UPGRADE AIRFIELD ACCESS
CONTROL SYSTEM AND GATE IMPROVEMENTS
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
rbehm
FAA FY2030 (ADOT FY2031)
PREPARED: (FY )7/2026 2031
:4
7:
P M
Ju l 2 7, ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
1 CONSTRUCT TW A REHABILITATION AND GEOMETRY
UPDATE (2,300' x 75')
2 CONSTRUCT TW A LIGHTING & SIGNAGE UPDATE
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
rbehm
FAA FY2031 (ADOT FY2032)
PREPARED: (FY )7/2026 2032
:4
7:
P M
Ju l 2 7, ro je ct
\K
Ki ng m an A irp or t, AZ
\K
A C
IP
s\
Ki ng m an
A C
IP
F
Y
-3 2\
C
AD
\IG
M
A C
IP
M ap s
FY
-3 2.
dw g
KINGMAN AIRPORT
AIRPORT CAPITAL IMPROVEMENT PROGRAM
LEGEND
N.T.S.
1 AIRPORT MASTER PLAN UPDATE WITH AGIS SURVEY
(AIRPORT WIDE)
2 CONSTRUCT CORNER APRON RECONSTRUCTION
PHASE 1 (APPROX. 17,500 SY)
FAA FY2032 (ADOT FY2033)
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
File details come from the government source that posted it. Updated .