IGCE_UHHZ222002_RPR HVAC Cost Estimate (Blank).pdf
PDF 42 KB Posted
- Attached to
- 116 ACW HVAC Repairs Federal contract opportunity
- Solicitation number
- W50S6Z22R0008
- Issued by
- Department of the Army National Guard
About this file
This independent government cost estimate provides pricing details for HVAC repairs and replacements at multiple buildings on Robins Air Force Base in Georgia. The estimate includes line items for materials, labor, and other costs for items like a 155 MBH gas-fired water heater, 2,000 MBH cast iron gas boiler, 19-ton and 31.66-ton packaged chillers, 5-ton and 20-ton water source heat pumps, and a 30-ton water source heat pump. It also includes costs for state boiler inspections, profit, overhead for indirect labor and benefits, and bonds and insurance. The total estimated price is not provided.
The related federal contract opportunity is a solicitation from the Department of the Army National Guard to provide engineering, supervision, labor, parts, equipment, tools and supplies for HVAC repairs to seven buildings at Robins Air Force Base, including all necessary site preparation and improvements in accordance with the scope of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HVAC QUESTIONS ANSWERS_Final.pdf | ||
| UHHZ222002 RPR HVAC _rv1.pdf | ||
| UHHZ222002 RPR HVAC MULTI SOW.pdf | ||
| 116 ACW HVAC W506SZ-22-R-0008.pdf | ||
| WD July 2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT GOVERNMENT ESTIMATE- FOR OFFICIAL USE ONLY
PROJECT TITLE: UHHZ222002_RPR HVAC Multi Correct Boiler deficiencies
TOTAL PRICE
PURCHASE REQUEST NO.: PROJECT NO.:UHHZ222002 LOCATION: Robins AB, GA
ITEM
MATERIAL AND SUPPLY COST LABOR COST OTHER
Line Totals
UNIT
QUANT
RATE
TOTAL
MH or
UNIT
QUANT
RATE
Direct Cost
Gas Fired Water Heater, 155 MBH input, 150 GPH Job 1
Boiler, gas, cast iron, hot water, 2,000 MBH Job 1
Packaged Chiller, 19 ton Job 1
Packaged Chiller, air cooled, 31.66 ton Job 1
Heating/cooling system Heat pump 5 ton, SEER 14 Job 1
Heat Pump, central station, water source, 20 ton Job 1
Heat Pump, central station, water source, 30 ton Job 1
State Boiler Inspection Job 1
SUBTOTAL
PROFIT
SUBTOTAL
OVERHEAD ( Div-1-Indirect Labor-includes labor burden)
SUBTOTAL
BONDS AND INSURANCE