IGCE_UHHZ222002_RPR HVAC Cost Estimate (Blank).pdf

PDF 42 KB Posted

Attached to
116 ACW HVAC Repairs Federal contract opportunity
Solicitation number
W50S6Z22R0008
Issued by
Department of the Army National Guard

About this file

This independent government cost estimate provides pricing details for HVAC repairs and replacements at multiple buildings on Robins Air Force Base in Georgia. The estimate includes line items for materials, labor, and other costs for items like a 155 MBH gas-fired water heater, 2,000 MBH cast iron gas boiler, 19-ton and 31.66-ton packaged chillers, 5-ton and 20-ton water source heat pumps, and a 30-ton water source heat pump. It also includes costs for state boiler inspections, profit, overhead for indirect labor and benefits, and bonds and insurance. The total estimated price is not provided.

The related federal contract opportunity is a solicitation from the Department of the Army National Guard to provide engineering, supervision, labor, parts, equipment, tools and supplies for HVAC repairs to seven buildings at Robins Air Force Base, including all necessary site preparation and improvements in accordance with the scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to 116 ACW HVAC Repairs, newest first.
File Type Posted
HVAC QUESTIONS ANSWERS_Final.pdf PDF
UHHZ222002 RPR HVAC _rv1.pdf PDF
UHHZ222002 RPR HVAC MULTI SOW.pdf PDF
116 ACW HVAC W506SZ-22-R-0008.pdf PDF
WD July 2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT GOVERNMENT ESTIMATE- FOR OFFICIAL USE ONLY

PROJECT TITLE: UHHZ222002_RPR HVAC Multi Correct Boiler deficiencies

TOTAL PRICE

PURCHASE REQUEST NO.: PROJECT NO.:UHHZ222002 LOCATION: Robins AB, GA

ITEM

MATERIAL AND SUPPLY COST LABOR COST OTHER

Line Totals

UNIT

QUANT

RATE

TOTAL

MH or

UNIT

QUANT

RATE

Direct Cost

Gas Fired Water Heater, 155 MBH input, 150 GPH Job 1

Boiler, gas, cast iron, hot water, 2,000 MBH Job 1

Packaged Chiller, 19 ton Job 1

Packaged Chiller, air cooled, 31.66 ton Job 1

Heating/cooling system Heat pump 5 ton, SEER 14 Job 1

Heat Pump, central station, water source, 20 ton Job 1

Heat Pump, central station, water source, 30 ton Job 1

State Boiler Inspection Job 1

SUBTOTAL

PROFIT

SUBTOTAL

OVERHEAD ( Div-1-Indirect Labor-includes labor burden)

SUBTOTAL

BONDS AND INSURANCE