This is a Scope of Work document for the City of Austin's Watershed Protection Department, specifically for Solicitation No. IFQ 6300 CAA1003, a spot purchase contract for storm drainage system components. The contract covers the procurement of inlets, arch pipe, manholes, and 3:1 end treatment components needed to collect, carry, and safely discharge stormwater across multiple replacement projects. The contract becomes effective upon execution by the City and remains in effect until deliverables are complete or the City terminates the agreement. Delivery of ordered products must occur within five business days of order notification or as mutually agreed upon between the contractor and the City's Contract Manager. Material tickets must accompany each delivery and include unique ticket numbers, City delivery order numbers, truck and driver information, loading dates and times, and detailed product lists. The default delivery location is the Watershed Protection facility at 901 Dalton Lane, Austin, Texas 78742, which operates Monday through Thursday from 7:00 a.m. to 2:00 p.m.
Contractors must be manufacturers, haulers, or truckers with access to the requested materials and demonstrate a minimum of three years of experience within the previous five-year period providing similar products and services. Contractors must maintain a full-time permanent business address and be reachable by email and telephone Monday through Friday from 8:00 a.m. to 4:30 p.m. All reinforced concrete arch pipe must meet ASTM C 506 specifications, and reinforced concrete pipe and box culverts must have a Manning "n" value of .013 or less with tongue and groove joints between concrete elements. The contractor shall provide a single point of contact within two business days of request, confirm order quantities in writing within 24 hours of notification, and provide advance written notice of any delivery delays within two hours of identification. The City reserves the right to dismiss contractor drivers for misconduct or property damage. Invoices should be emailed within five business days of invoice date to WPDinvoices@austintexas.gov. Key City personnel include Contract Manager Coral Arce, Project Managers Lazaro Cardenas and Jose Valles, and Procurement Specialist Brenita Wilkinson.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFQ_6300_CAA1003_IFQ_PAC_03_v1.pdf | ||
| IFQ_6300_CAA1003_IFQ_ATT_01_v1.pdf | ||
| IFQ_6300_CAA1003_QUOTE_v1.xlsx | XLSX spreadsheet | |
| IFQ_6300_CAA1003_IFQ_ADD_1_v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Revised 07/03/2025
Scope of Work Template
SOLICITATION NO. IFQ 6300 CAA1003
Storm Drainage System Components – Spot Purchase
1.0 Purpose
The purpose of this contract is to purchase components used in a storm drainage system to collect, carry, and safely discharge stormwater. Components include inlets, arch pipe, manholes, and 3:1 end treatment.
This contract will support the Austin Watershed Protection Department's (AWP) Field Operations Division on the replacement of worn components of drainage-related work of multiple projects. The City will either pick up the items listed or will choose to have them delivered.
2.0 Term of Contract
This Contract shall become effective on the date executed by the City (“Effective Date”) and shall remain in effect until the earliest of when the deliverables set forth in the Contract are complete or the City terminates the Contract.
3.0 Product Specifications
3.1 Reinforced Concrete Arch Type shall meet ASTM Spec ASTM C 506.
3.2 The RCP and Box Culverts shall have a Manning "n" value of .013 or less. All joints between concrete elements shall be tongue and groove except for manhole grade rings.
3.3 ITEM NO. 510 – PIPE
3.3.1 Standard 510S-1
3.3.2 Standard 510S-3
3.3.3 Standard 510S-4
3.3.4 Standard 510S-5
3.3.5 Standard 510-6
4.0 Contractor Qualifications
4.1 The Contractor shall be a manufacturer and/or hauler and/or trucker and shall have access to the requested materials.
4.2 Have a minimum of three (3) years of experience during the previous five-year period providing products in similar size and scope to the City's.
Submit proof of experience with the offer or within two (2) working days upon request by the City. Proof of experience may be in the form of references, and/or letters of reference during the previous three to five-year period, clearly demonstrating and verifying the Contractor's eligibility. The City reserves the right to ask for and verify proof of experience prior to the completion of the award process.
4.3 Have and operate a full-time, permanent business address and shall be reached by email and telephone Monday through Friday from 8:00 a.m.
to 4:30 p.m.
5.0 Tasks/Requirements
Contractor’s Responsibilities The Contractor shall:
5.1 Submit literature with their solicitation response that includes detailed technical specifications on the products priced in the Price Sheet.
5.2 Provide the City with a single point of contact (SPOC) to act as a liaison with the City within two (2) business days of request. The Contractor shall provide an email address, office phone, cell, and/or pager number or pager for accessibility.
5.3 Not required the City order in minimum quantity amounts.
5.4 Allow the City to arrange for pick up materials at no additional cost.
5.5 Confirm in writing, e-mail, fax, or by phone the quantity to be shipped on all orders within 24 hours of order notification by the City. The Contractor shall identify the availability of ordered products and days available for delivery.
5.6 Notify the City in writing of any changes in delivery of products affected by backlog, strike, or any other reasonable event. This written notification shall be issued within two (2) hours after it becomes apparent that normal delivery shall be affected from the established delivery date.
City’s Responsibilities The City will:
5.7 Have the ability to pick up goods from supplier’s warehouse. Customer to provide order number at time of pickup and to coordinate pick up time and details with supplier.
5.8 The City will provide light, water, and electricity as necessary to enable the contractor to provide the services described in this contract. The Contractor shall use these facilities only to perform the contractual duties.
5.9 Provide the Contractor with a City delivery order authorizing the purchase of products against this contract. The notification shall include the quantity and description of the material, scheduled delivery, and destination.
5.10 Provide an on-site contact for deliveries, with escorted access if necessary.
5.11 The City reserves the right to dismiss any of Contractor's driver(s) for misconduct or damage to City Property. This driver shall not work on any resulting contract without written approval by the City.
6.0 Delivery
Contractor’s Responsibilities The Contractor shall:
6.1 Deliver product orders to a City specified location within five (5) business days of order notification or a time mutually agreed to between the Contractor and the Contract Manager or designee.
6.2 Provide a material ticket with each order release of products that are delivered to the City. The material ticket shall include the following information at a minimum:
6.2.1 Unique Ticket Number
6.2.2 City Delivery Order Number
6.2.3 Truck Number and Driver's Name
6.2.4 Loading date and time of day
6.2.5 Detailed list of products delivered
6.3 Delivery shall be made to the following location unless otherwise specified by the City in the order:
7.0 Specific Invoice Requirements
The City's preference is to have invoices emailed within five business days of invoice date to WPDinvoices@austintexas.gov.
Location/Facility Name:
Watershed Protection
Address: 901 Dalton Lane, Austin, Texas, 78742 Days/Hours of Operation:
Monday through Thursday from 7:00 a.m. to 2:00 p.m.
mailto:WPDinvoices@austintexas.gov
8.0 Designation of Key Personnel
The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. If it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
9.0 Appendices/Exhibit
9.1 Exhibit 1 – Standard Detail Drawings for Item 510
9.2 ITEM NO. 510 - PIPE 06-02-25
9.3 ASTM C506 Standard Specification
Resource Name/ Title
Phone Number Email Address
City Contract Manager Coral Arce 512-974-1388 Coral.arce@austintexas.gov City Project Manager Lazaro
Cardenas 512-298-9237 Lazaro.cardenas@austintexas.gov
City Project Manager (Secondary)
Jose Valles
512-318-7851 Jose.valles@austintexas.gov
City Contract Administrator, Procurement Specialist
Brenita Wilkinson
512-974-3164 Brenita.selement@austintexas.gov https://library.municode.com/tx/austin/codes/standard_specifications_manual?nodeId=AUSTIN_TX_STANDARD_SPECIFICATIONS_TECHNICAL_MANUAL_SERIES_500PIAP_ITEM_NO._510PI06-02-25 https://store.astm.org/c0506-20e01.html