Meeting Minutes and Sign In Sheet.pdf

PDF 372 KB Posted

Attached to
REPLACE FIRE ALARM SYSTEM
Solicitation number
IFBP06111200001
Issued by

View the file

Other files

File Type Posted
Seatac abstract.pdf PDF
2 - Wage Rate 02102012.pdf PDF
5 - Fire and Life Safety Drawings.pdf PDF
1 - SF-30 AMENDMENT 0003.pdf PDF
6 - Pictures - FDC SeaTac Fire Alarm Panels.pdf PDF
4 - Active Trouble List.pdf PDF
3 - Points List.pdf PDF
ANSWERED QUESTIONS.pdf PDF
Amendment 0002 final.pdf PDF
SF-30 AMENDMENT 0001.pdf PDF
3 - Statement of Work.pdf PDF
1 - Coverletter.pdf PDF
7 - NCIC Form.pdf PDF
5 - Wage Rate.pdf PDF
4 - Drawings.pdf PDF
2 - Solicitation.pdf PDF
6 - SF-24 Bid Bond Form.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 6A1M, Replace Fire Detection System

IFBP06111200001

Pre-bid Conference/Site Visit February 8, 2012, 9:00 a.m.

The site visit for the above referenced IFB commenced at 9:15 a.m. The following individuals were present:

Robert Wright, Electronics Technician, BOP Thai Chung, Electronics Technician, BOP Christina Wade, Supervisory Contract Specialist, BOP Brian Butcher, Evergreen Fire & Security John Deutschmann, Convergint Frank DiBisceglie, LCS Ricardo Martinez, Cosco Fire Edward Moody, Cosco Fire Kenneth Olsen, Cosco Fire Safak Osturgut, Fire Protection, Inc.

Chad Walior, Mastercraft Electric

The following areas were visited during the site visit: Control Room (main panel) and Communications Room (system output devices, blueprints, DDC’s) on the 1st Floor; Chemical Room and Freight Elevator Machine Room (remote panels) on C-Level; Communications Closets (remote panels) and Elevator Lobbies (annunciators) on B-Level, 1st Floor, 4th Floor, 6th Floor, and 7th Floor; Housing Unit EA (officer’s station annunciator); Roof Mechanical Room (remote panels); and Facilities Department on B-Level for Site Visit close-out with Facility Manager

The following topics were discussed during the visit: The mechanical rooms on Floors 3 and 5 are similar to the mechanical room on the roof. There is an annunciator in each housing unit officer’s station and the elevator lobby of each floor. Annunciators in the elevator lobby are currently flush mounted to prevent impact damage from food carts, etc.

Attendees inquired regarding availability of detailed schematics showing locations of DDC points, annunciators, etc.; a photo of the panel of switches in the Control Room; and a list of the number of devices. All attendees were advised to submit their questions and requests for additional documents to Ms. Brouillard, Contracting Officer, at the e-mail address specified in the solicitation, by February 15, 2012.

The site visit concluded at 10:20 a.m.

These minutes are provided for informational purposes only; are not intended to change any specifications, terms, or conditions of the solicitation; and any changes to the solicitation shall be issued in subsequent amendments.

Site Visit Meeting Minutes
Project6A1M-SiteVisit-SignInSheet