AMENDMENT_0003_FINAL.pdf
PDF 261 KB Posted
- Attached to
- REMOVE/INSTALL FUEL SYSTEM
- Solicitation number
- IFBP02091300001
About this file
Amendment 0003 - Removal of installation of one (1) tank. Please read sign and submita copy of this amendment with your bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0004.pdf | ||
| McKean_Abstract.pdf | ||
| Questions_and_Answers.pdf | ||
| AMENDMENT_0002_FINAL.pdf | ||
| McKean_Meeting_Minutes.pdf | ||
| AMENDMENT_0001_FINAL 2 .pdf | ||
| 7_-__NCIC_Form.pdf | ||
| 5_-_Wage_Rate_05242013.pdf | ||
| 3_-_SOW_Approved_05172013.pdf | ||
| 2_-_Solicitation.pdf | ||
| 4_-_Drawings.pdf | ||
| 1_-_Coverletter.pdf | ||
| 6_-_SF-24_Bid_Bond_Form.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Highlight
IFBP02091300001/AMENDMENT 0003
This amendment hereby incorporates into the solicitation and resulting contract the following changes to the specifications:
Page 3, Item 2, line 1 – Change “917 cubic yards” to “620 cubic yards”
Page 3, Item 2, line 1 – Change “three (3)” to “two (2)”
Page 3, Item 2, line 2 – Change “45’” to
Page 3, Item 3, sentence 1 – Delete “two (2) 20,000 gallon 10’ diameter x 34’-1” long double-wall horizontal aboveground tanks and”
Page 3, Item 3, line 2 – Change “one (1)” to “two (2)”
Page 3, Item 8, line 1 – Change “two (2)” to “one (1)”
Page 3, Item 8, sentence 1 – Change “double-wall horizontal aboveground tanks built to UL 142 Specifications.” to “ double-wall Fire Guard or approved equal horizontal aboveground tank for fuel oil storage built to UL 142 Specifications and labeled for UL 2085 Standard.”
Page 3, Item 9, line 1 – Change “two (2) fuel oil tanks” to “fuel oil tank”
Page 3, Item 9, line 2 – Change “the same two (2) tanks.” to “the same tank.”
Page 3, Item 10, line 2 – Insert “and labeled for UL 2085 Standard” after “UL 142 Specifications”
Page 3, Item 18, line 1 – Change “three (3)” to “two (2)”
Make the following changes to figure titled “Proposed Piping Layout”
• Delete one (1) 20,000 GALLON FUEL OIL tank
• Key Information, Paragraph 1, final line – Change “690 l.f.” to “500 l.f.”
NO OTHER CHANGES ARE MADE AT THIS TIME.
| AMENDMENT 0003 |
| Amendment 03 - Page 2 |
| contract_id_code: |
| first_page: 1 |
| last_page: 2 |
| modification_no: 0003 |
| effective_date: 07/17/2013 |
| requisition_no: 0135-13 |
| project_no: 2A5U |
| issued_by: FEDERAL BUREAU OF PRISONS |
WESTERN REGIONAL OFFICE
7338 SHORELINE DRIVE
STOCKTON, CA 95219
| code_2: |
| contractor_name_address: |
| administered_by: |
| check_1: Yes |
| amendment_solicitation_no: IFBP02091300001 |
| dated: 06/03/2013 |
| check_2: Off |
| contract_order_no: |
| dated_2: |
| code: |
| faculty_code: |
| checkbox_1: Yes |
| copies: 01 |
| acct_and_appropriation: |
| check_a: Off |
| change_order: |
| check_b: Off |
| contract_order_modified: |
| check_c: Off |
| authority_of: |
| check_d: Off |
| other: |
| number_of_copies_return: 01 |
| amendment_description: AMENDMENT IS AS FOLLOWS: |
SEE CONTINUATIONN ON PAGE 2.
NO OTHER CHANGES ARE MADE AT THIS TIME.
| signer_name_title: |
| contracting_name_title: |
| date_signed_contractor: |
| clear_form: |
| save_form_data: |
| Email Form: |
| checkbox_2: Off |
| checkbox_3: Yes |
| checkbox_4: Off |
| checkbox_5: Yes |
| date_signed_contracting_officer: |
File details come from the government source that posted it. Updated .