BidResults2014BrooklynReplaceUPS.pdf

PDF 40 KB Posted

Attached to
Replace UPS System at the Metropolitan Detention Center (MDC) Brooklyn, New York
Solicitation number
IFBP02021400002
Issued by

View the file

Other files

File Type Posted
Amendment0001.PDF PDF
RFIReplaceUPS_BROOKLYN2014revised.pdf PDF
Pre-Bid_Conference_Minutes_1.pdf PDF
New_Compressed_(zipped)_Folder_(2).zip ZIP file
SF302.pdf PDF
WageRatesNov122013.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Results

IFBP02021400002

Replace UPS System

MDC Brooklyn, New York

11/26/13 at 2:00 P.M.

1. Power Systems Engineering $239,898.00

2. M&J Electrical Contractors Corp. $297,000.00

3. A&M Electrical Contractors Incorporated $319,184.00

4. S&E Services Incorporated $359,000.00

5. BBA Construction LLC $369,425.00

6. Sarro & Associates $483,130.00

7. Enfield Enterprises Incorporated $499,600.00

8. ESA South Incorporated $563,153.81

File details come from the government source that posted it. Updated .