RFI2answerFEB242016.pdf

PDF 127 KB Posted

Attached to
Upgrade PLC System at the Federal Correctional Complex (FCC) Allenwood, Pennsylvania
Solicitation number
IFBP02011600003
Issued by

View the file

Other files

File Type Posted
BidResults2016ALX.pdf PDF
WageRatesMarch22016.pdf PDF
SF303.pdf PDF
Amendment0003ALXpage2.pdf PDF
RFI3March12016.pdf PDF
MeetingMinutesSiteVisitFEB2016.pdf PDF
SF302.pdf PDF
RFI1approved.pdf PDF
SF301.pdf PDF
Amendment0001pages2through4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI) 2

IFBP02011600003

Upgrade PLC System at FCC Allenwood

1. I had a question regarding the above referenced solicitation.

I just saw amendment 2 (SF302) and was planning on bidding on this project. We are primarily a controls systems integrator with a lot of Allen-Bradley experience. UI was wondering what it would take to be included as one of the approved CSIs on this project.

ANSWER: Response from S. Wolfe, PE (Buchart Horn, Inc.) –

2/23/2016

Additional Systems Integrators are not being considered at this time for this project unless there has been an established working relationship with either the specifying Engineer or FCC

Allenwood. For consideration for future projects, please forward a qualifications packet to:

Sherry Wolfe, PE

Buchart Horn, Inc.

445 W. Philadelphia St.

York, PA 17401

The qualifications package shall include a summary of your company’s services and experience, list of similar projects including a brief description, reference contact information, and construction costs, and resumes of key personnel. In addition, the Systems Integration Company must be capable of servicing the client on-site within 8 hours from the facility.

A description of how on-site servicing can be accomplished within 8 hours shall also be included in the qualifications package. This package must be received no later than Friday, February 26, 2016.

2. Concerning Solicitation IFBP02011600003 Solid State Automation and Controls would like to be considered and listed as an acceptable Control System Integrator.

Solid State Automation and Controls

1) 5200 Mitchelldale St. STE E17

2) Houston, TX 77092

3) (713) 467-1005

4) Contact: Travis Gregg

ANSWER: Response from S. Wolfe, PE (Buchart Horn, Inc.) –

2/24/2016

Solid State Automation and Controls are not being considered at this time for this project unless there has been an established working relationship with either the specifying Engineer or FCC

Allenwood. For consideration for future projects, please forward a qualifications packet to:

Sherry Wolfe, PE

Buchart Horn, Inc.

445 W. Philadelphia St.

York, PA 17401

The qualifications package shall include a summary of your company’s services and experience, list of similar projects including a brief description, reference contact information, and construction costs, and resumes of key personnel. In addition, the Systems Integration Company must be capable of servicing the client on-site within 8 hours from the facility.

A description of how on-site servicing can be accomplished within 8 hours shall also be included in the qualifications package. This package must be received no later than Friday, February 26, 2016.