Amendment0003ALXpage2.pdf

PDF 45 KB Posted

Attached to
Upgrade PLC System at the Federal Correctional Complex (FCC) Allenwood, Pennsylvania
Solicitation number
IFBP02011600003
Issued by

About this file

Amendment 0003 - page 2

View the file

Other files

File Type Posted
BidResults2016ALX.pdf PDF
WageRatesMarch22016.pdf PDF
SF303.pdf PDF
RFI3March12016.pdf PDF
RFI2answerFEB242016.pdf PDF
MeetingMinutesSiteVisitFEB2016.pdf PDF
SF302.pdf PDF
RFI1approved.pdf PDF
SF301.pdf PDF
Amendment0001pages2through4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0003

IFBP02011600003

Amendment 0003 hereby incorporates the following changes:

1. Drawing ES601 – Omit the second keyboard shown for the

Console and Engineer’s workstations.

2. Specification section 28 30 30 – Add the following paragraph

2.1.D.3: Hard-wired Gate/Door Control Pushbuttons – Existing hard-wired gate/door control pushbuttons shall be consolidated and replaced with new illuminated pushbuttons as noted on the drawings. Pushbuttons shall be mounted in an enclosure with mounting bracket for mounting below the monitors at the Operator workstation console. Pushbuttons shall illuminate when the associated gate/door is open and shall be Allen-Bradley 800B

Series (16 mm Square) or Equal.

3. The Department of Labor wage rates have been updated. This solicitation now contains General Decision Number PA93, Modification 3 dated 02/26/2016. The wage rates are attached to this amendment.

File details come from the government source that posted it. Updated .