Final_Meeting_Minutes_-_Lee_12102015.pdf
PDF 1 MB Posted
- Attached to
- USP Lee - Remediate Mold Air Handlers - Phase I
- Solicitation number
- IFBP01171600001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_signed.pdf | ||
| Responses_to_Questions.pdf | ||
| USP_LEE_-_MODIFICATION_0001_w_Wage_Rate.pdf | ||
| 6_-_SF-24_Bid_Bond_Form_-_blank.pdf | ||
| 2_-_Solicitation.pdf | ||
| 1_-_Coverletter.pdf | ||
| 3_-_SOW.pdf | ||
| 7_-_NCIC_Form_-_blank.pdf | ||
| 5_-_Wage_Rate.pdf | ||
| 4_-_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USP LEE - Hickory Flats Rd, Pennington Gap, VA 24277
3. USP LEE-Hickory Flats Rd, Pennington Gap, VA 24277
Photo of Building # 3-Typical of Prisoner Housing Buildings 1, 2, and 3.
Prisoner Housing Common Area. Prisoner cells located on 2 floors. Typical of Prisoner common areas A-L in all 3 buildings.
Photo of supply and return vents in the Prisoner Cells. Return Transfer Ducts dump directly into vertical open chase located between cells. Supply ducts from HVAC Mechanical room also run in this chase.
Photo of Door to vertical open chase located between cells. Supply ducts back to HVAC
Mechanical room also run in this chase.
Photo of open door to vertical open chase located between cells. Supply ducts back to
HVAC Mechanical room also run in this chase.
Photo of bottom area of vertical open chase located between cells on bottom floor of
Prisoner housing common area.
View of Transfer return duct from prisoner cell into Vertical Open Chase.
View up into transfer return duct in Vertical Chase.
View of supply duct in Vertical Open Chase.
View looking up from ground floor in Vertical Chase. Note plumbing runs in Vertical
Chase as well.
Another view of Vertical Chase with various conduits and supply ducts running vertically in these areas.
Another view of Vertical Pipe Chase between inmate cells
Air Handler unit. Typical of 2 found in each HVAC Mechanical Room of buildings 1-3.
Area and access to HVAC Units Main Return Duct surface sample location.
Access door on right to surface sampling area after Air Handler in the mail supply duct.
Area of Supply duct work after Air Handler where heater units located.
Area of Supply duct work after Air Handler where heater units located. Access hatch used for surface sample before heater in this duct.
Closer view of access hatch
Access hatch used for surface sample location after heater in Supply Duct work.
Access hatch to plenum space where supply ducts run from HVAC Mechanical room out towards Prisoner Housing Common Areas.
Main Return Trunk from Prisoner Housing Area into HVAC Mechanical Room.
Access hatch in Main Return Trunk from Prisoner Housing Area into HVAC Mechanical
Room.
Access hatch open of Main Return Trunk from Prisoner Housing Area into HVAC
Mechanical Room.
Staff area between Prisoner housing common areas bathroom return vent surface sample location.
Staff area between Prisoner housing common areas bathroom return vent surface sample location (closer view).
Supply vent in K-L Staff area between Prisoner housing common areas surface sample location.
Supply vent in K-L Staff area between Prisoner housing common areas surface sample location (closer view).
Photo of Access to Ceiling Plenum area over Prisoner Housing areas.
Photo of Ceiling Plenum area towards middle showing supply and return ducts running in the ceiling in this area.
Photo of Ceiling Plenum area over Prisoner Housing areas.
F-unit Side View of Air Handler
| 1B2C Meeting Minutes - Lee |
| Sign In Sheet - Lee |
| 1B2C Remediate Mold Air Handlers Pictures |
File details come from the government source that posted it. Updated .