Final_Meeting_Minutes_-_Lee_12102015.pdf

PDF 1 MB Posted

Attached to
USP Lee - Remediate Mold Air Handlers - Phase I
Solicitation number
IFBP01171600001
Issued by

View the file

Other files

File Type Posted
Abstract_signed.pdf PDF
Responses_to_Questions.pdf PDF
USP_LEE_-_MODIFICATION_0001_w_Wage_Rate.pdf PDF
6_-_SF-24_Bid_Bond_Form_-_blank.pdf PDF
2_-_Solicitation.pdf PDF
1_-_Coverletter.pdf PDF
3_-_SOW.pdf PDF
7_-_NCIC_Form_-_blank.pdf PDF
5_-_Wage_Rate.pdf PDF
4_-_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USP LEE - Hickory Flats Rd, Pennington Gap, VA 24277

3. USP LEE-Hickory Flats Rd, Pennington Gap, VA 24277

Photo of Building # 3-Typical of Prisoner Housing Buildings 1, 2, and 3.

Prisoner Housing Common Area. Prisoner cells located on 2 floors. Typical of Prisoner common areas A-L in all 3 buildings.

Photo of supply and return vents in the Prisoner Cells. Return Transfer Ducts dump directly into vertical open chase located between cells. Supply ducts from HVAC Mechanical room also run in this chase.

Photo of Door to vertical open chase located between cells. Supply ducts back to HVAC

Mechanical room also run in this chase.

Photo of open door to vertical open chase located between cells. Supply ducts back to

HVAC Mechanical room also run in this chase.

Photo of bottom area of vertical open chase located between cells on bottom floor of

Prisoner housing common area.

View of Transfer return duct from prisoner cell into Vertical Open Chase.

View up into transfer return duct in Vertical Chase.

View of supply duct in Vertical Open Chase.

View looking up from ground floor in Vertical Chase. Note plumbing runs in Vertical

Chase as well.

Another view of Vertical Chase with various conduits and supply ducts running vertically in these areas.

Another view of Vertical Pipe Chase between inmate cells

Air Handler unit. Typical of 2 found in each HVAC Mechanical Room of buildings 1-3.

Area and access to HVAC Units Main Return Duct surface sample location.

Access door on right to surface sampling area after Air Handler in the mail supply duct.

Area of Supply duct work after Air Handler where heater units located.

Area of Supply duct work after Air Handler where heater units located. Access hatch used for surface sample before heater in this duct.

Closer view of access hatch

Access hatch used for surface sample location after heater in Supply Duct work.

Access hatch to plenum space where supply ducts run from HVAC Mechanical room out towards Prisoner Housing Common Areas.

Main Return Trunk from Prisoner Housing Area into HVAC Mechanical Room.

Access hatch in Main Return Trunk from Prisoner Housing Area into HVAC Mechanical

Room.

Access hatch open of Main Return Trunk from Prisoner Housing Area into HVAC

Mechanical Room.

Staff area between Prisoner housing common areas bathroom return vent surface sample location.

Staff area between Prisoner housing common areas bathroom return vent surface sample location (closer view).

Supply vent in K-L Staff area between Prisoner housing common areas surface sample location.

Supply vent in K-L Staff area between Prisoner housing common areas surface sample location (closer view).

Photo of Access to Ceiling Plenum area over Prisoner Housing areas.

Photo of Ceiling Plenum area towards middle showing supply and return ducts running in the ceiling in this area.

Photo of Ceiling Plenum area over Prisoner Housing areas.

F-unit Side View of Air Handler

1B2C Meeting Minutes - Lee
Sign In Sheet - Lee
1B2C Remediate Mold Air Handlers Pictures

File details come from the government source that posted it. Updated .