4_-_Drawings.pdf
PDF 20 MB Posted
- Attached to
- USP Lee - Remediate Mold Air Handlers - Phase I
- Solicitation number
- IFBP01171600001
About this file
DRAWINGS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_signed.pdf | ||
| Responses_to_Questions.pdf | ||
| Final_Meeting_Minutes_-_Lee_12102015.pdf | ||
| USP_LEE_-_MODIFICATION_0001_w_Wage_Rate.pdf | ||
| 6_-_SF-24_Bid_Bond_Form_-_blank.pdf | ||
| 2_-_Solicitation.pdf | ||
| 1_-_Coverletter.pdf | ||
| 3_-_SOW.pdf | ||
| 7_-_NCIC_Form_-_blank.pdf | ||
| 5_-_Wage_Rate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
DRAWING INDEX
INSTITUTIONAL KEY PLAN: N.T.S.
FEDERAL BUREAU OF PRISONS
USP LEE, VIRGINIA
GENERAL NOTES
HOUSING AREA NAMING CONVENTION:
REFERENCE DRAWING INDEX
N.I.C. N.I.C.
N.I.C.
ISSUED FOR CONSTRUCTION
Mechanical - General Notes, Legends, and SchedulesISSUED FOR CONSTRUCTION
Mechanical - Building #2 -
Mechanical Room - Level 2
Mechanical - Details, Schedules and SequencesISSUED FOR CONSTRUCTION
X-405
X-405
ISSUED FOR CONSTRUCTION
TRUST INTEGRITY QUALITY
ABATEMENT - LEVEL 1
BUILDINGS 1, 2 AND 3
X-404
X-404
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
N.I.C. N.I.C.
N.I.C. N.I.C.
X-405
X-405
ISSUED FOR CONSTRUCTION
TRUST INTEGRITY QUALITY
ABATEMENT - LEVEL 2
BUILDINGS 1, 2 AND 3
X-404
X-404
X-401
11 11
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
N.I.C. N.I.C.
TRUST INTEGRITY QUALITY
ABATEMENT - LEVEL 2
MECH RM - BLDGS 1, 2 AND 3
X-401 1
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
N.I.C. N.I.C.
TRUST INTEGRITY QUALITY
ABATEMENT - ALL BUILDINGS
ENLARGED CELL CHASE
GRAPHIC SCALE
1/2" = 1'-0"
0 1' 2' 4'
9 9
9 9
9 9 9 9
X-404
X-404
X-404
X-404
N.I.C.N.I.C.N.I.C.N.I.C.
SUSP ACT CLG
9' -0
9'
-0
EL 9'-0"
LEVEL 2
LEVEL 3
5' -4
EL 23'-4"
EXT WALL
CONC PANEL
INSUL PRECAST
9' -0
9'
-0
EL 32'-4"
LEVEL 4
2' -8
" EL 49'-4"
TOP OF SLAB
5' -4
" EL 46'-8"
TOP OF PCSP
CELL
CELL
PRECAST CONC
MECH PLENUM
CELL MODULE
CELL
CELL
GUARDRAIL
'-8
METAL
GRADE
CONC SLAB ON
CONC PLANK
PRECAST
CELL
CELL
MECH PLENUM
CELL
CELL
'-8
SUSP ACT CLG
LEVEL 1
FIN FL 0'-0"
PLENUM FLOOR
PLENUM FLOOR
6'-0" 6'-0"
3' -6
3'
-6
GWB GWB
GWB
6'-0" 6'-0"
GWB
METAL
GUARDRAIL
CHASE
BEYOND
PLENUM
SHOWERS
SHOWERS
SHOWERS
SHOWERS
DAY RM 1
DAY RM 3
SECURE
CORRIDOR
EL 0'-0"
LEVEL 1
EL 23'-4"
LEVEL 3
EL 32'-4"
LEVEL 4
TOP OF PCSP
EL 46'-8"
EL 49'-4"
TOP OF SLAB
EL 41'-4"
PLENUM
EL 18'-0"
PLENUM
EL 9'-0"
LEVEL 2
SUSP ACT CLG
SUSP GWB
SUSP GWB
SUSP ACT CLG
EL 9'-0"
SECOND FL
TOP PCSP
EL 26'-0"
CELL
CELLPRECAST CONC
CELL MODULE
CELL
CELL
TYP SPECIAL HOUSING ROOF CONSTRUCTION
EL 18'-0"
PLENUM
FIRST FL
EL 0'-0" EL 0'-0"
FIRST FL
EL 9'-0"
SECOND FL
EL 18'-0"
PLENUM
EL 26'-0"
TOP PCSP
CORRIDOR
CORRIDOR
EL 23'-4"
TOP OF PCC SOLID SLAB
EL 23'-4"
TOP OF PCC SOLID SLAB
PRECAST CONC
CELL MODULE
INSUL PCSP
EL 0'-0"
FIRST FL
CORRIDOR
CORRIDOR CELL
EL 9'-0"
SECOND FL
CELL
EL 18'-0"
PLENUM
EL 26'-0"
TOP PCSP
TOP PCC SOLID SLAB
EL 23'-4"
TYP SPECIAL HOUSING ROOF CONSTRUCTION
PRECAST CONC
CELL MODULE
TOP PCC SOLID SLAB
ISSUED FOR CONSTRUCTION
TRUST INTEGRITY QUALITY
ABATEMENT - ALL BUILDINGS
ENLARGED SECTIONS
GRAPHIC SCALE
1/8" = 1'-0"
8'4'0 16'
76 76
6 7
N.I.C.
Electrical - General Notes, Legends, and SchedulesISSUED FOR CONSTRUCTION
Electrical - Building #2 -
Mechanical Room - Level 2 & 4
N.I.C.
N.I.C.
N.I.C.N.I.C.
Electrical - Risers and SchedulesISSUED FOR CONSTRUCTION
N.I.C.
N.I.C.
N.I.C. N.I.C. N.I.C.N.I.C.N.I.C.
Electrical - SchedulesISSUED FOR CONSTRUCTION
N.I.C.
N.I.C. N.I.C.
N.I.C.
N.I.C.
| 14024 C-001 |
| 14024 M-001 |
| 14024 M-122 |
| 14024 M-701 |
| X-111 ABATEMENT - LEVEL 1 - BUILDINGS 1, 2 AND 3 |
| X-112 ABATEMENT - LEVEL 2 - BUILDINGS 1, 2 AND 3 |
| X-401 ABATEMENT - LEVEL 2 MECH ROOM - BUILDINGS 1, 2 AND 3 |
| X-404 ABATEMENT - ALL BUILDINGS - ENLARGED PLANS |
| X-405 ABATEMENT - ALL BUILDINGS - ENLARGED SECTIONS |
| 14024 E-001 |
| 14024 E-121 |
| 14024 E-501 |
| 14024 E-601 |
| M004 - SCHEDULES |
| M226 Layout1 (1) |
| M301 Layout1 (1) |
| M302 Layout1 (1) |
| M305 Layout1 (1) |
| M306 Layout1 (1) |
File details come from the government source that posted it. Updated .