F WAGE RATES FORT WORTH REPLACE FOOD SERVICE FLOOR.mht
MHT file 7 KB Posted
- Attached to
- REPLACE FOOD SERVICE FLOOR
- Solicitation number
- IFB-FTW-0008
About this file
F. DAVIS BACON WAGE RATES FORT WORTH REPLACE FOOD SERVICE FLOOR
Text of this file
From: <Saved by Windows Internet Explorer 7> Subject:
Date: Fri, 15 May 2009 09:16:42 -0500 MIME-Version: 1.0 Content-Type: text/html;
charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/TX59.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5579
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=windows-1252"> <META content="MSHTML 6.00.6000.16825" name=GENERATOR></HEAD> <BODY><PRE>General Decision Number: TX080059 04/10/2009 TX59
Superseded General Decision Number: TX20070061
State: Texas
Construction Type: Building
Counties: Johnson, Parker and Tarrant Counties in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). Use current heavy and highway General Wage Determination for Paving Incidental to Building Construction in Tarrant County and for Paving and Utilities incidental to Building Construction in remaining Counties.)
Modification Number Publication Date 0 02/08/2008 1 03/28/2008 2 04/11/2008 3 06/06/2008 4 07/25/2008 5 12/05/2008 6 01/23/2009 7 04/10/2009
BRTX0001-007 06/01/2006
Rates Fringes
BRICKLAYER.......................$ 19.00 6.48
CARP1421-001 05/01/1995
Rates Fringes
MILLWRIGHT.......................$ 16.49 3.92
ELEC0020-004 12/01/2008
Rates Fringes
Electricians:
Cable Splicer...............$ 25.36 4.50+12.5% Electrician.................$ 23.20 4.50+12.5%
IRON0263-001 06/01/2007
Rates Fringes
IRONWORKER (Structural)..........$ 20.10 4.60
* SFTX0669-001 04/01/2009
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 25.90 14.30
SUTX1989-001 11/01/1989
Rates Fringes
Acoustical Installer.............$ 11.23
CARPENTER
(Excluding drywall hangers, acoustical installers & batt insulators).................$ 12.27 2.22 doing drywall hanging only..$ 10.00
CEMENT MASON/CONCRETE FINISHER...$ 10.16 .76
DRYWALL FINISHER/TAPER...........$ 11.18 2.21
GLAZIER..........................$ 11.37 1.31
LABORER (Including Mason Tenders & Pipelayers)............$ 7.46 1.00
Landscape Laborer................$ 6.55
Mechanical Insulator.............$ 10.92 1.00
PAINTER (Brush and Spray) (excluding Drywall Finishing)....$ 10.47 2.21
PLASTERER........................$ 11.50
Plumbers and Pipefitters (Including HVAC work)............$ 13.34 2.15
Power equipment operators:
Backhoes....................$ 12.30 1.82 Cranes......................$ 14.26 2.44 Foundation Drill Operators..$ 8.54 Graders.....................$ 11.69 1.80
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 9.50 .99
Sheet metal worker (Including HVAC Duct Work)..................$ 12.63 2.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
</PRE></BODY></HTML>
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .