This document is a Standard Form 30 Amendment to a federal solicitation (Amendment 0002) issued by the USCG Civil Engineering Unit Providence for a waterfront project. The amendment provides clarifications and answers to two specific contractor questions: (1) permission to bring boats and floating platforms into the boat basin, and (2) access to fresh water and electricity in the laydown area.

Key details include: Contractors are permitted to use boats and work platforms in the boat basin subject to strict operational restrictions, including not obstructing Station New York operations, identifying platforms in pre-construction submittals, and removing them during "no work" periods. Water access is available through a nearby fire hydrant with specific connection requirements, and electricity is accessible at a light pole in the contractor staging area. The amendment requires all utility connections and electrical work to be code-compliant and approved by the Contracting Officer's Representative (COR).

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Warwick, RI 02886

Amendment 0002

November 7, 2025

A1. a. Yes, subject to the provisions of the specifications, including 01 14 00 WORK

RESTRICTIONS. Boats and work platforms shall not obstruct Station New York operations per 01 14 00 at para 1.1(c) “Access to emergency response vessels and the ability to go underway shall be continuously maintained.” Additional information is included at paras 1.1

(i) and (j).

b. Boats and work platforms proposed for use shall be identified as a dedicated pre-construction submittal in advance of or with the Construction Schedule required by 01 32 00.

c. The government will make reasonable accommodations for the contractor to moor, dock or anchor boats or work platforms related to execution of the work, subject to the operational needs of the CG. The contractor may, on short notice, be required to remove boats and work platforms from the boat basin.

d. Boats and work platforms shall be removed from the boat basin during the “no work” periods identified in 01 14 00 at para 1.1(d).

e. The KTR is solely responsible for the seaworthiness, protection, and securing boats and work platforms at all times.

f. Boats and work platforms shall be secured, moored, anchored or removed from the water at the end of each workday, in a manner approved by the COR.

Q2. What is the access to fresh water in the laydown area?

A2. a. Refer to 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS at para.

3.2 AVAILABILITY AND USE OF UTILITY SERVICES. The KTR may access the water system at the nearest working fire hydrant, presently located near the boat ramp. Connection to the water system shall include an isolation valve, backflow prevention devices, a utility grade water meter, fire and other hoses between the point of use and the fire hydrant, and other necessary adaptors. All shall be in good working order. Hoses shall be secured as required for safe operation, and to prevent pedestrian trip and other safety hazards.

b. Connection to fire hydrants shall be made such that quick removal by STA NY or Fire

Department personnel are easily done in the event of an emergency or other need.

Amendment 0002

November 7, 2025

(Answer 2 continued)

c. Access to and use of the boat ramp and other roads shall not be obstructed at any time.

Provide hose jumpers as required to maintain this access. Hose Jumper/hose bridges, as manufactured by Turtle Plastics, are acceptable.

Q.3 What is the access to electricity in the laydown area?

A3. a. As with access to water, Refer to 01 50 00 at para. 3.2. Refer to A5/V-101 OVERALL

WATERFRONT PLAN. Electricity is available at the light pole in the plan southwest corner of the indicated contractor staging area, in addition to other locations around the Boat Basin.

Connection to the electric system at this and other locations for incidental use to support execution of the work is acceptable, subject to approval by the COR. Provide and remove necessary transformers, disconnects, and other devices as required for the safe and efficient use of electricity. All electric work shall be code compliant.

b. Electric work is required in this area. Refer to A3/S-503 NORTH BREAKWATER

ELECTICAL REPAIR ELEVATION and E8/E-501 NORTH BREAKWATER SINGLE

LINE DIAGRAM.

(End)

SF30-16c (1) Fillable 2-9-22-2
12c Amendment 0002
12c Amendment 0002
T
Untitled

12c Amendment 0002 Page 2

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: The purpose of this Amendment is to provide answers to questions submitted as follows:

Q1. Is the contractor permitted to bring a boat or other floating platform into the boat basin to work off of?

(Continued on Page 2)

FacilityCode[0]:
Code[2]:
IssuedBy[0]: Contracting Officer

USCG Civil Engineering Unit Providence 475 Kilvert Street, Suite 100 NameandAddress[0]: TO ALL POTENTIAL OFFERORS

AMENDMENT MUST BE ACKNOWLEDGED

AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 70Z0G126BSNY00130
ModificationNo[0]:
ProjectNo[0]: 18362253
Page[0]: 1
Pages[0]: 3
EffectiveDate[0]: 11/7/2025
Dated9B[0]:
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]:

File details come from the government source that posted it. Updated .