3c Drawings.pdf
PDF 14 MB Posted
- Attached to
- MAJOR M&R WATERFRONT AT U. S. COAST GUARD, STATION NEW YORK, STATEN ISLAND, PSN 18362253
- Solicitation number
- IFB70Z0G126BSNY00130
About this file
This document is a detailed design and construction drawing set for a U.S. Coast Guard waterfront facility repair project located at Station New York in Staten Island, New York. The project involves comprehensive repairs and replacements across multiple waterfront infrastructure components, including floating docks, breakwaters, a south pier, and seawall, with a total project number of 18362253 and fiscal year 2025 funding.
The project scope includes a base bid item (BBI) and four optional bid items (OBIs), with key work including: replacing the main floating dock, repairing MRG and boarding floating dock guide piles, repairing south and north breakwaters by replacing timber facing boards and recoating steel support structures, repairing the south pier with concrete repairs and flood coating, and addressing seawall repairs involving crack and spall fixes, repointing masonry, and installing riprap. The project is phased to minimize disruption to Coast Guard station operations, with specific work to be completed in three separate phases and an exclusionary period during the United Nations General Assembly in September 2025 and 2026.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG STA NEW YORK
STATEN ISLAND, RICHMOND COUNTY, NEW YORK
18362253 MAJOR M&R WATERFRONT (FY25 CPOP)
MRG FLOATS (SMALL BOATS), BOARDING FLOAT, BOAT MRG
BRKWTR SOUTH, NORTH BREAKWATER, SOUTH PIER,
CONCRETE BULKHEAD/SEAWALL
DRAWING INDEX
SHEET ID SHEET NO. DISCIPLINE SHEET TITLE
G-001 01 GENERAL COVER SHEET
G-002 02 GENERAL LEGEND, ABBREVIATIONS, & NOTES
G-003 03 GENERAL GENERAL NOTES
V-101 04 MAPPING OVERALL WATERFRONT PLAN
CD101 05 CIVIL DEMOLITION MRG FLOATING DOCK DEMO PLAN
CD102 06 CIVIL DEMOLITION BOARDING FLOATING DOCK DEMO PLAN
CD103 07 CIVIL DEMOLITION SOUTH BREAKWATER DEMO PLAN
CD104 08 CIVIL DEMOLITION NORTH BREAKWATER DEMO PLAN
CD105 09 CIVIL DEMOLITION SOUTH PIER DEMO PLAN
CD106 10 CIVIL DEMOLITION SEAWALL DEMO PLAN
C-101 11 CIVIL MRG FLOATING DOCK REPAIR/REPLACEMENT PLAN
C-102 12 CIVIL BOARDING FLOATING DOCK REPAIR PLAN
C-103 13 CIVIL SOUTH BREAKWATER REPAIR PLAN
C-104 14 CIVIL NORTH BREAKWATER REPAIR PLAN
C-105 15 CIVIL SOUTH PIER REPAIR PLAN
C-106 16 CIVIL SEAWALL REPAIR PLAN
C-501 17 CIVIL EROSION AND SEDIMENT CONTROL DETAILS
C-901 18 CIVIL SITE PHOTOGRAPHS - 1
C-902 19 CIVIL SITE PHOTOGRAPHS - 2
S-501 20 STRUCTURAL FLOATING DOCK DETAILS - 1
S-502 21 STRUCTURAL FLOATING DOCK DETAILS - 2
S-503 22 STRUCTURAL BREAKWATER REPAIR DETAILS - 1
S-504 23 STRUCTURAL BREAKWATER REPAIR DETAILS - 2
S-505 24 STRUCTURAL SOUTH PIER REPAIR DETAILS - 1
S-506 25 STRUCTURAL SOUTH PIER REPAIR DETAILS - 2
S-507 26 STRUCTURAL SEAWALL REPAIR DETAILS
E-501 27 ELECTRICAL ELECTRICAL DETAILS
U.S. COAST GUARD
CIVIL ENGINEERING
CEU PROVIDENCE
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
STA NEW YORK
NOTES:
1. THE PROPERTY BOUNDARY DATA SHOWN WAS OBTAINED FROM THE NEW YORK CITY
GIS SYSTEM (gis.nyc.gov) AND IS CONSIDERED APPROXIMATE.
ABUTTING PROPERTY DATA
BLOCK LOT PARCEL ADDRESS OWNER OWNER ADDRESS
1 2832 1 10 SEARCH LANE,
STATEN ISLAND, NY 10305 US GOVERNMENT 10 SEARCH LANE,
STATEN ISLAND, NY 10305
2 2832 68 70 NEW LANE
STATEN ISLAND, NY 10305
NYC HOUSING
AUTHORITY
70 NEW LANE
STATEN ISLAND, NY 10305
3 2833 76 0 NAUTILUS COURT
STATEN ISLAND, NY 10305
SEA CLIFF TOWERS
OWNERS CORP
20 CLIFF STREET
STATEN ISLAND, NY 10305
PROJECT LOCATION
ABUTTING PROPERTIES MAP
SCALE: NTS
BROOKLYN
STATEN ISLAND
NEW YORK
HARBOR
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
TECHNICAL DIRECTOR
AutoCAD SHX Text
BRANCH CHIEF
AutoCAD SHX Text
APPROVING OFFICER DATE
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEERING UNIT
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
PROVIDENCE
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text
NEW YORK
AutoCAD SHX Text
STATION
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
STA NY
AutoCAD SHX Text G-001
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253G-001.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text
MICHAEL P. CAROSOTTO, PE
AutoCAD SHX Text
MICHAEL P. CAROSOTTO, PE
AutoCAD SHX Text
DAVID C. DILL
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
U.S. COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
HARBOR
AutoCAD SHX Text
NEW YORK
AutoCAD SHX Text
SOUND
AutoCAD SHX Text
LONG ISLAND
AutoCAD SHX Text
PROVIDENCE
AutoCAD SHX Text
HARTFORD
AutoCAD SHX Text
HUDSON RIVER
AutoCAD SHX Text
LONG ISLAND
AutoCAD SHX Text
MASS.
AutoCAD SHX Text R.I.
AutoCAD SHX Text
CONN.
AutoCAD SHX Text
BLOCK
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text N.Y.
AutoCAD SHX Text
PA.
AutoCAD SHX Text N.J.
AutoCAD SHX Text
ATLANTIC OCEAN
ELEVATION
SECTION
DETAIL
INDICATES REFERENCE QUADRANT SHEET LOCATION
SHEET WHERE SECTION/
DETAIL/ELEVATION IS TAKEN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE SECTION IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE DETAIL IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE ELEVATION IS SHOWN
X# X-#
X# X-#
X# X-#
X# X-#
VIEW TITLE SAMPLE
SCALE: AS NOTED
REFERENCE DOCUMENTS:
1. THE FOLLOWING REFERENCE MATERIALS WERE USED TO INFORM THE DESIGNER OF RECORD OF THE EXISTING SITE
CONDITIONS AND ARE AVAILABLE TO THE CONTRACTOR UPON REQUEST. REVIEW OF THIS MATERIAL IS NOT REQUIRED FOR
BIDDING PURPOSES.
A. AUG 2022, WATERFRONT FACILITY ASSESSMENT REPORT: USCG STA NEW YORK, STATEN ISLAND, NY; PREPARED BY LLOYD COLLINS JV, PORTSMOUTH, NH FOR USCG CIVIL ENGINEERING UNIT PROVIDENCE, WARWICK, RI; FINAL
SUBMISSION.
B. 20 DEC 2016, RECORD DRAWINGS, CG PROJECT NUMBER 5328641: MULTI-PURPOSE BUILDING & WATERFRONT RENOVATIONS, U.S. COAST GUARD STATION NEW YORK, STATEN ISLAND, NEW YORK; PREPARED BY HASKELL ARCHITECTS AND ENGINEERS, NY FOR USCG FACILITIES DESIGN & CONSTRUCTION CENTER, NORFOLK, VA.
C. MAR 2013, DESIGN DRAWINGS, CG PROJECT NUMBER 5084254: WATERFRONT REPAIRS (POST HURRICANE SANDY), USCG STA NEW YORK, STATEN ISLAND, NEW YORK; PREPARED BY APPLEDORE MARINE ENGINEERING, INC., PORTSMOUTH, NH FOR USCG CIVIL ENGINEERING UNIT PROVIDENCE, RI; 90% SUBMISSION.
D. 28 MAY 2013, SHOP DRAWINGS, CG PROJECT NUMBER 5084254: FLOATING DOCK SHOP DRAWINGS, USCG ROSEBANK; PREPARED BY BELLINGHAM MARINE, YORK, PA FOR USCG CIVIL ENGINEERING UNIT PROVIDENCE, RI;
LATEST REVISION NO. 9.
E. 21 JUL 2003, FINAL DRAWINGS, CG PROJECT NUMBER P01175: WATERFRONT REPAIRS, USCG STA NEW YORK, STATEN ISLAND, NEW YORK; PREPARED BY USCG CEU PROVIDENCE, WARWICK, RI.
F. 27 FEB 1998, RECORD DRAWINGS, CG PROJECT NUMBER 01-95-1004: USCG RELOCATION PROJECT, USCG STATION ROSEBANK, STATEN ISLAND, NEW YORK; PREPARED BY HAN-PADRON ASSOCIATES CONSULTING ENGINEERS, NY
FOR USCG FACILITIES DESIGN & CONSTRUCTION CENTER, PACIFIC, SEATTLE, WA.
G. AUG 1990, SHOP DRAWINGS, CG PROJECT NUMBER 43-8357: STATION NEW YORK FLOAT, GOVERNORS ISLAND, NEW YORK; PREPARED BY CONCRETE FLOATATION SYSTEMS, INC. "THE FLOATATION CORPORATION", NORWALK, CT.
2. THE REFERENCE MATERIALS LISTED ABOVE DO NOT SHOW ALL EXISTING CONDITIONS AND DETAILS FROM THE ORIGINAL CONSTRUCTION AND SUBSEQUENT REPAIR OR IMPROVEMENT CONTRACTS BUT SHOW BASIC ARRANGEMENT OF THE
FACILITIES, GENERAL LOCATIONS OF REPAIRS, AND OTHER IMPROVEMENTS.
ABBREVIATIONS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
APPROX. APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AWPA AMERICAN WOOD PRESERVES ASSOCIATION
AWS AMERICAN WELDING SOCIETY
BBI BASE BID ITEM
BMP BEST MANAGEMENT PRACTICES
BTM BOTTOM
BWTN BETWEEN
CB CARRIAGE BOLT
CEU CIVIL ENGINEERING UNIT
CJ CONTROL JOINT
CL CENTER LINE
CLR CLEAR
COMM COMMUNICATIONS
CONC CONCRETE
CONT CONTINUOUS
CONT'D CONTINUED
COR CONTRACTING OFFICER REPRESENTATIVE
CVR COVER
DIA/Ø DIAMETER
DIM DIMENSION
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELECTRIC
ELEV ELEVATION
EPC EPOXY COATED
EQ EQUAL
ES EACH SIDE
EX EXISTING
EXP EXPANSION
F&I FURNISH AND INSTALL
F&P FORM AND PUMP
FH FLAT HEAD
FNDN FOUNDATION
FT FOOT/FEET
FTG FOOTING
FW FLAT WASHER
HDG HOT DIPPED GALVANIZED
HHN HEAVY HEX NUT
HLN HEX LOCK NUT
HORIZ HORIZONTAL
HT HAND TROWEL
IBC INTERNATIONAL BUILDING CODE
I.D. INSIDE DIAMETER
IN INCH(ES)
KO CONTRACTING OFFICER
L LENGTH
LBS POUNDS
LF LINEAR FEET
LG LONG
LOD LIMITS OF DISTURBANCE
LW LOCK WASHER
MW MALLEABLE WASHER
MAX MAXIMUM
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MLW MEAN LOW WATER
MLLW MEAN LOWER LOW WATER
MRG MARGINAL
MSL MEAN SEA LEVEL
MTL MEAN TIDE LEVEL
NOTES:
THE ELEVATION DATA SHOWN ABOVE WAS OBTAINED FROM SHEET C700
OF REFERENCE DOCUMENT B PROVIDED BELOW ON THIS DRAWING.
N NORTH
NAD83 NORTH AMERICAN DATUM OF 1983
NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988
NBW NORTH BREAKWATER
NDS NATIONAL DESIGN SPECIFICATION FOR
WOOD CONSTRUCTION
NE NORTH EAST
NIC NOT IN CONTRACT
NO. NUMBER
NTS NOT TO SCALE
NW NORTH WEST
NYSDEC NEW YORK STATE DEPARTMENT OF
ENVIRONMENTAL CONSERVATION
NYSDOS NEW YORK STATE DEPARTMENT OF STATE
NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION
OC ON CENTER
OBI OPTIONAL BID ITEM
OD OUTSIDE DIAMETER
OGW OGEE WASHER
P&M PROTECT AND MAINTAIN
PCF POUNDS PER CUBIC FOOT
PL PLATE
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
QTY QUANTITY
R&D REMOVE AND DISPOSE
R&R REMOVE AND REINSTALL
R&S REMOVE AND STOCKPILE
REF REFERENCE
REQ'D REQUIRED
RIK REPLACE IN KIND
RPUID REAL PROPERTY UNIQUE IDENTIFIER
S SOUTH
SBW SOUTH BREAKWATER
SE SOUTH EAST
SF SQUARE FEET
SID STATEN ISLAND DATUM
SIP STAY-IN-PLACE
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
SW SOUTH WEST
T TELECOMMUNICATION
t CONCRETE REPAIR THICKNESS
TB TIMBER BOLT
T&B TOP & BOTTOM
T&G TONGUE AND GROOVE
TYP TYPICAL
UHMW ULTRA HIGH MOLECULAR WEIGHT POLYETHELENE
U.S. UNITED STATES
USACE UNITED STATES ARMY CORPS OF ENGINEERS
USCG UNITED STATES COAST GUARD
UTIL UTILITIES
W WEST
WWF WELDED WIRE FABRIC
W/ WITH
& AND
@ AT
' FEET/FOOT
" INCHES
< LESS THAN
> GREATER THAN OR EQUAL
% PERCENTAGE
± PLUS/MINUS
CIVIL LEGEND
PROPERTY LINE/EASEMENT
ELECTRIC LINE
WATER LINE
TELECOMMUNICATIONS LINE
STORM SEWER LINE
SANITARY SEWER LINE
FUEL LIINE
ELECTRIC JUNCTION BOX
ELECTRICAL PANEL
OVERHEAD LIGHT AND POLE
TELEPHONE BOX
SHORE TIE
DOCK BOX
MRG FLOATING DOCK GUIDE PILE
BOARDING FLOATING DOCK GUIDE PILE
SOUTH BREAKWATER PILE/BONNET
SOUTH BREAKWATER FRAME & PILE CONNECTIONS
NORTH BREAKWATER PILE/BONNET
NORTH BREAKWATER FRAME & PILE CONNECTIONS
SOUTH PIER BENT DESIGNATION
SOUTH PIER PILE ROW DESIGNATION
PILE ANODE
SEAWALL STATIONING
EE
X#
PLAN VIEW TITLE SAMPLE
SCALE: AS NOTED
INDICATES REFERENCE QUADRANT SHEET LOCATION
DATUM CONVERSION (ELEVATIONS IN FEET)
DATUM MLLW NAVD88 SID
FEMA 1% Still Water Flood Elevation 14.08 11.30 9.21 Top of Breakwater 11.81 9.30 6.94 Mean Higher-High Water (MHHW) 5.06 2.28 0.19
Richmond (Staten Island, SID) 4.87 2.09 0.00
Mean High Water (MHW) 4.73 1.95 -0.14
NAVD88 2.78 0.00 -2.09
NAVD29 1.68 -1.10 -3.19
Mean Low Water (MLW) 0.21 -2.57 -4.66
Mean Lower-Low Water (MLLW) 0.00 -2.78 -4.87
W
T
ST
SAN
F
PROJECT DESCRIPTION:
THE PROJECT INCLUDES ONE (1) BASE BID ITEM (BBI) AND FOUR (4) OPTIONAL BID ITEMS (OBIs) AS SUMMARIZED BELOW. ANY WORK THAT IS NOT SPECIFIED AS BEING PART OF AN OBI SHALL BE INCLUDED AS PART OF THE BASE BID SCOPE. THE BELOW SUMMARY IS NOT AN EXHAUSTIVE LIST OF ALL SCOPE ITEMS, ESPECIALLY INCIDENTAL WORK, AND IS INTENDED TO BE A GENERAL SUMMARY ONLY. REFER TO THE DRAWING AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND DETAILS
ON THE FULL PROJECT SCOPE OF WORK.
1. THE BBI WORK INCLUDES THE FOLLOWING ITEMS AND INCIDENTAL RELATED WORK:
BBI NO. 1:
REPLACE MAIN FLOATING DOCK: REPLACE THE EXISTING MAIN FLOATING DOCK WITH A NEW
FLOATING DOCK OF THE SAME SIZE AND FOOTPRINT; REMOVE AND REINSTALL THE EXISTING
SHORE TIE ELECTRICAL PANEL/STANCHION AND TELEPHONE BOX/STANCHION ON THE
REPLACEMENT FLOATING DOCK; REPLACE THE SHORE TIE ELECTRICAL LINES AND ROUTE
THROUGH INTERNAL UTILITY CHASES AND PULL BOXES; AND REPLACE MULTIPLE STEEL PILE
GUIDE FRAMES.
REPAIR MRG FLOATING DOCK GUIDE PILES: RECOAT PILES F1 THROUGH F17 AND INSTALL
SACRIFICIAL ANODES ON PILES F1 THROUGH F11.
REPAIR BOARDING FLOATING DOCK GUIDE PILES: RECOAT PILES B1 THROUGH B5 AND INSTALL
SACRIFICIAL ANODES ON PILES B1 THROUGH B5.
REPAIR SOUTH BREAKWATER: REPLACE DETERIORATED VERTICAL TIMBER FACING BOARDS
(180 EA); RECOAT THE STEEL SUPPORT PILES, PILE CONNECTIONS, AND STEEL FRAMING; AND
INSTALL SACRIFICIAL ANODES ON THE STEEL SUPPORT PILES AND STEEL FRAMES.
REPAIR NORTH BREAKWATER: REPLACE DETERIORATED VERTICAL TIMBER FACING BOARDS (30
EA); RECOAT THE STEEL SUPPORT PILES, PILE CONNECTIONS, AND STEEL FRAMING; INSTALL
SACRIFICIAL ANODES ON THE STEEL SUPPORT PILES AND STEEL FRAMES; AND REPAIR THE
OVERHEAD LIGHTING ELECTRICAL LINE.
REPAIR SOUTH PIER: INSTALL METHACRYLATE FLOOD COAT ON TOPSIDE OF DECK; REPAIR
CONCRETE CURB SPALL; REPAIR CONCRETE PILE CAP CRACKS AND SPALLS; REPLACE
SUPPORT PILE CONCRETE ENCASEMENTS; AND REMOVE GUIDE PILE POSTS.
SEAWALL: REPAIR VARIOUS CRACKS AND SPALLS AT THE BOAT RAMP RETURN WALL, NORTH
RETURN WALL, AND CURBS; REPOINT EXPOSED STONE MASONRY IN NORTH RETURN WALL;
REPAIR VOID IN SEAWARD FACE; RESEAL CAP EXPANSION JOINTS; RECOAT THE WALE SPLICE
PLATES; INSTALL WALE SPLICE PLATE ANCHORS; RECOAT THE WALE TIE RODS; AND PLACE
RIPRAP ALONG TOE AREA NORTH OF BOAT RAMP.
2. THE OBI WORK INCLUDES THE FOLLOWING ITEMS AND INCIDENTAL RELATED WORK:
OBI NO. 1: REPLACE FLOATING DOCK F: REPLACE THE EXISTING FLOATING DOCK F WITH A NEW
FLOATING DOCK OF THE SAME SIZE AND FOOTPRINT; AND REPLACE MULTIPLE STEEL PILE
GUIDE FRAMES.
OBI NO. 2: REPLACE FLOATING DOCKS A&B: REPLACE THE EXISTING FLOATING DOCKS A AND B
WITH NEW FLOATING DOCKS OF THE SAME SIZE AND FOOTPRINT; REMOVE AND REINSTALL THE
EXISTING SHORE TIES/STANCHIONS ON THE REPLACEMENT FLOATING DOCKS; REPLACE THE
SHORE TIE ELECTRICAL LINES AND ROUTE THROUGH INTERNAL UTILITY CHASES AND PULL
BOXES; AND REPLACE MULTIPLE STEEL CONNECTION FRAMES AND STEEL PILE GUIDE FRAMES.
OBI NO. 3: REPLACE MRG FLOATING DOCK GANGWAY: REPLACE THE GANGWAY, UPPER
SUPPORT HINGE, ROLLERS, ROLLER GUIDE WEAR PLATE, AND TRANSITION PLATE.
OBI NO. 4: MISC SITE REPAIRS: REMOVE THE BOAT HOIST TROLLEY CRANE FROM THE SOUTH
PIER; AND REPLACE THE NORTH FENCE END PANEL AND END GUARD.
SB1
F1
SF1
NB1
NF1
CROSS-REFERENCE LEGEND
VERTICAL DATUM CONVERSION DIAGRAM:
NORTH
PLAN
TRUE N
PLAN NORTH
TRUE NORTH
B1
0+00
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
LEGEND, ABBREVIATIONS, & NOTES
AutoCAD SHX Text
STA NY
AutoCAD SHX Text G-002
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253G-002.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text D
AutoCAD SHX Text A
GENERAL NOTES:
1. THE SITE IS LOCATED IN STATEN ISLAND, RICHMOND COUNTY, NEW YORK.
2. THESE DRAWINGS ARE NOT INTENDED TO REPLACE THE SPECIFICATIONS. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THESE DRAWINGS AND
SPECIFICATIONS.
3. UTILITY SIZES AND LOCATIONS, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED APPROXIMATE. THE ACTUAL SIZE AND LOCATION OF UTILITIES MAY VARY FROM THOSE SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ALL UTILITIES, GRADES, AND DIMENSIONS PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES, IN WRITING, PRIOR TO BEGINNING AFFECTED WORK. THE CONTRACTOR SHALL MAKE PROVISIONS TO ENSURE UTILITY LINES ARE
PROTECTED AND REMAIN IN CONTINUOUS OPERATION, UNLESS OTHERWISE NOTED.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT DIG SAFELY NEW YORK AND THE USCG COR A MINIMUM OF 72 HOURS BEFORE COMMENCING WITH ANY EXCAVATION RELATED WORK, IN ORDER THAT ALL
AFFECTED UTILITY COMPANIES ARE NOTIFIED.
5. EXISTING CONSTRUCTION, INCLUDING UTILITIES, DRAINAGE, AND OTHER MISCELLANEOUS WORK WHICH IS TO REMAIN, SHALL BE UNDISTURBED AND PROTECTED. HOWEVER, SOME UTILITIES MAY REQUIRE TEMPORARY REMOVAL TO PERFORM THE WORK. REINSTALL TEMPORARILY REMOVED UTILITIES OR REPLACE
WITH NEW MATERIALS IN-KIND.
6. LIMITED WATER AND POWER ARE AVAILABLE ON SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING CONNECTIONS AS NEEDED IN COORDINATION WITH THE COR.
7. RIGHT-OF-WAY LINES, PROPERTY LINES, LEASE LINES, AND EASEMENT LINES, WHEN SHOWN ON THESE
DRAWINGS, ARE CONSIDERED APPROXIMATE AND WERE OBTAINED FROM HISTORIC RECORDS.
8. CONSTRUCTION LIMITS COINCIDE WITH PROPERTY LINE AND/OR LEASE LIMITS AS SHOWN ON THE DRAWINGS.
9. THE USCG SHALL PROVIDE A STAGING AREA WITHIN THE PROPERTY FOR THE CONTRACTOR'S USE AS SHOWN ON DRAWING V-101 OR AS AGREED TO BY THE KO DURING THE PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL STORE CONSTRUCTION MATERIALS WITHIN ITS DESIGNATED STAGING AREA AND SHALL
NOT STORE SUCH MATERIALS IN OTHER NON-AUTHORIZED AREAS.
10. THE FOLLOWING PERMITS ARE APPLICABLE TO THIS PROJECT:
10.1. USACE: AUTHORIZATION UNDER NATIONWIDE GENERAL PERMIT NUMBER 3 - MAINTENANCE; PERMIT
APPLICATION NUMBER NAN-2025-00116-MMI.
10.2. NYSDEC: DOCKS, PLATFORMS & MOORINGS UNDER ARTICLE 15, TITLE 5; PERMIT ID 2-6404-00555/00014.
10.3. NYSDEC: WATER QUALITY CERTIFICATION UNDER SECTION 401 CLEAN WATER ACT; PERMIT ID 2-6404-00555/00015.
10.4. NYSDEC: TIDAL WETLANDS UNDER ARTICLE 25; PERMIT ID 2-6404-00555/00016.
10.5. NYSDOS: CONCURRENCE WITH CONSISTENCY DETERMINATION; PERMIT ID F-2025-0071 (DA)
THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ADHERING TO THE CONDITIONS PROVIDED
WITHIN THESE DOCUMENTS, COPIES OF WHICH ARE PROVIDED IN THE SPECIFICATIONS.
11. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK.
SAFETY PROVISIONS SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.
THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING
HOURS.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP ERECTION PROCEDURES AND SEQUENCING TO INSURE THE PROTECTION OF EXISTING AND PROPOSED STRUCTURES AND THE SAFETY AND PROTECTION OF STATION PERSONNEL, CONSTRUCTION PERSONNEL, AND THE PUBLIC, UNLESS OTHERWISE DIRECTED BY THE COR. THIS INCLUDES THE ADDITION OF NECESSARY TEMPORARY SUPPORTS (E.G., BRACING, SHORING, SHEETING, GUYS, TIEDOWNS, ETC.). SUCH TEMPORARY MATERIAL SHALL BE DESIGNED BY THE CONTRACTOR
AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR.
13. THE WORK SHALL BE CONDUCTED IN A MANNER THAT WILL MINIMIZE INTERRUPTIONS TO THE DAILY
OPERATIONS OF USCG STA NEW YORK. REFER TO THE CONSTRUCTION SEQUENCING NOTES FOR
ADDITIONAL REQUIREMENTS.
14. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE ORDERING ANY MATERIAL, COMMENCING ANY FABRICATION, OR PERFORMING ANY WORK. THE CONTRACTOR SHALL NOTIFY THE USCG COR, IN WRITING, OF ANY CONDITIONS OR DIMENSIONS WHICH VARY FROM THOSE SHOWN ON THE DRAWINGS AND INCORPORATE SUCH VARIATIONS IN THE CONSTRUCTION AS APPROVED BY
THE USCG.
15. WATER ELEVATIONS AT THE SITE ARE TIDAL AND WILL VARY.
16. THE PROPOSED WORK IS LOCATED WITHIN A FEMA ZONE AE FLOOD ZONE AND WILL BE INUNDATED DURING THE 100 YEAR FLOOD. THE 100 YEAR FLOOD ELEVATION IS ESTIMATED AT ABOUT EL. 12 FEET (NAVD 88) AS SHOWN ON THE CITY OF NEW YORK, NEW YORK, BRONX, RICHMOND, NEW YORK, QUEENS, AND KINGS COUNTIES, FLOOD INSURANCE RATE MAP NUMBER 3604970331F, PANEL 331 OF 457, LAST REVISED
SEPTEMBER 5, 2007.
17. ALL AREAS DISTURBED DURING DEMOLITION OR CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION BY THE CONTRACTOR, UNLESS OTHERWISE NOTED.
18. MATERIAL TO BE REMOVED SHALL BE LEGALLY DISPOSED OF OFFSITE BY THE CONTRACTOR DAILY IN
ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAWS.
19. THE CONTRACTOR SHALL OBTAIN, DAILY, A BURNING PERMIT FROM THE USCG FOR ALL WELDING, TORCH
CUTTING, OR OTHER HOT WORK.
20. THE CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM, WHETHER SHOWN OR NOT ON THE DRAWINGS. ALL WORK SHALL BE COORDINATED BETWEEN GENERAL, CIVIL, DEMOLITION, STRUCTURAL, AND ELECTRICAL DRAWINGS.
21. THE CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONAL COST ASSOCIATED WITH THIRD PARTY REINSPECTION OR RETEST WHEN PRIOR REJECTION MAKES REINSPECTION OR RETEST NECESSARY.
22. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL PRIOR TO FABRICATION AND CONSTRUCTION. PROPOSED CONTRACTOR CHANGES SHOWN ON SHOP DRAWINGS ONLY
WILL NOT SATISFY THIS REQUIREMENT.
ENVIRONMENTAL PROTECTION PLAN:
1. IN ORDER TO PROTECT NEW YORK HARBOR FROM HAZARDOUS MATERIALS RELEASES DURING THE COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING PREVENTATIVE MEASURES TO AVOID ANY ENVIRONMENTAL IMPACTS. THESE MEASURES SHALL INCLUDE, BUT NOT BE
LIMITED TO:
1.1. ALL EQUIPMENT PROPOSED TO BE UTILIZED BY THE CONTRACTOR SHALL BE IN GOOD WORKING
CONDITION AND INSPECTED DAILY FOR LEAKS.
1.2. A SPILL KIT, ABSORBENT MATERIALS, AND CONTAINMENT BERM SHALL BE ON SITE AT ALL TIMES DURING
CONSTRUCTION OPERATIONS.
1.3. ALL FUEL TRANSFER OPERATIONS SHALL BE CONDUCTED IN AN EFFICIENT AND SAFE MANNER IN ACCORDANCE WITH THE CONTRACTOR'S OPERATIONS MANUAL AND THE REQUIREMENTS SPECIFIED. OIL
ABSORBENT DIAPERS SHALL BE PLACED UNDER ALL EQUIPMENT DURING FUELING OPERATIONS.
1.4. ALL HYDRAULIC EQUIPMENT OPERATING ON SITE SHALL HAVE VEGETABLE BASED, NON-TOXIC, NON-POLLUTING, AND BIO-DEGRADABLE HYDRAULIC FLUID.
1.5. ALL EQUIPMENT SHALL BE PROPERLY MAINTAINED AND RECORDED IN WEEKLY LOGS AS TO
REQUIREMENTS FOR AND ACTUAL MAINTENANCE COMPLETED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANUP AND REMEDIATION OF HAZARDOUS MATERIAL
RELEASES.
DESIGN CRITERIA:
MARGINAL FLOATING DOCKS:
1. THE DESIGN OF THE REPLACEMENT FLOATING DOCKS IS THE RESPONSIBILITY OF THE CONTRACTOR. THE REQUIRED DESIGN CRITERIA ARE PROVIDED IN SECTION 35 51 13.00 20, CONCRETE FLOATING PIER FOR
SMALL CRAFT.
2. DESIGN VESSELS
SACRIFICIAL ANODES:
1. THE FLOATING DOCK GUIDE PILE, NORTH AND SOUTH BREAKWATER SUPPORT PILE, AND NORTH AND SOUTH BREAKWATER STEEL FRAME SACRIFICIAL ANODES WERE DESIGNED TO PROVIDE PROTECTION OVER A
20-YEAR DESIGN LIFE IN COMBINATION WITH THE EXISTING/PROPOSED COATING SYSTEMS.
REQUIRED DESIGN CODES:
1. 2020 BUILDING CODE OF NEW YORK STATE
2. INTERNATIONAL BUILDING CODE 2018 (IBC 2018)
3. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, AMERICAN SOCIETY OF CIVIL
ENGINEERS, ASCE 7-16
4. UNITED FACILITIES DESIGN, UFC 4-152-01 DESIGN: PIERS AND WHARVES
5. AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS
6. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, AMERICAN CONCRETE INSTITUTE, ACI 318-19
7. PCI RECOMMENDED PRACTICE FOR DESIGN, MANUFACTURE, AND INSTALLATION OF PRESTRESSED
ELEMENTS
8. AMERICAN INSTITUTE OF STEEL CONSTRUCTION, STEEL CONSTRUCTION MANUAL, AISC 15TH EDITION
9. AMERICAN WELDING SOCIETY, AWS D1.1
10. NATIONAL DESIGN STANDARD (NDS) FOR WOOD CONSTRUCTION.
LAYOUT:
1. THE VERTICAL CONTROL DATUM FOR THIS PROJECT IS MLLW.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING ALL LAYOUT WORK SHOWN FROM THE
CONTROL MONUMENTATION PROVIDED.
3. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SURVEY CONTROL THROUGHOUT CONSTRUCTION TO
ESTABLISH AND MAINTAIN ALL LINES AND ELEVATIONS.
TEMPORARY ENVIRONMENTAL CONTROLS:
1. ADHERE TO THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
2. TURBIDITY BARRIERS SHALL BE DEPLOYED AROUND AND/OR IMMEDIATELY ADJACENT TO THE WORK AREA
THAT COULD POTENTIALLY PRODUCE TURBIDITY IN THE WATER.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN ENVIRONMENTAL CONTROLS AS REQUIRED BY FEDERAL, STATE, AND MUNICIPAL REGULATIONS AND PERMITS. ENVIRONMENTAL CONTROLS
SHALL INCLUDE, BUT NOT BE LIMITED TO SEDIMENTATION, TURBIDITY, AND DUST.
4. THE PROJECT REQUIRES THE IMPLEMENTATION OF BEST MANAGEMENT PRACTICES (BMP) DURING CONSTRUCTION WORK TO PREVENT/MINIMIZE ENVIRONMENTAL IMPACTS DURING THE CONSTRUCTION
ACTIVITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO:
A. NO DEBRIS SHALL BE ALLOWED TO ENTER THE WATER. WORK SHALL BE PERFORMED "IN THE DRY" DURING LOW WATER WINDOWS WHENEVER POSSIBLE. THE CONTRACTOR SHALL PROVIDE A TEMPORARY PLATFORM OR OTHER SUITABLE POSITIVE MEANS OF CAPTURING DEBRIS FROM CONSTRUCTION AND DEMOLITION OPERATIONS. THESE FACILITIES SHALL BE IN PLACE AND APPROVED BY THE COR BEFORE
STARTING ANY DEMOLITION WORK.
5. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL DEVICES, BOOMS, TARPAULINS, FLOATS, STAGING AND OTHER DEVICES NECESSARY TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING THE
WATER AND AIRBORNE MATERIALS FROM LEAVING THE IMMEDIATE VICINITY OF THE SITE.
6. DEMOLITION DEBRIS FALLING INTO THE WATER SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR.
UNDERWATER INSPECTIONS MAY BE CONDUCTED BY THE USCG TO VERIFY THAT THE CONTRACTOR HAS
REMOVED ALL DEMOLITION AND CONSTRUCTION DEBRIS FROM THE MUDLINE.
DIVISION 2 - EXISTING CONDITIONS:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
02 41 00, DEMOLITION AND DECONSTRUCTION.
DIVISION 3 - CONCRETE:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTIONS 03 01 32, CONCRETE REHABILITATION FOR CIVIL WORKS; 03 01 32.01, EPOXY CRACK INJECTION;
AND 03 01 32.02, METHACRYLATE FLOOD COAT.
DIVISION 5 - METALS:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
05 50 15, CIVIL WORKS FABRICATION.
DIVISION 6 - WOODS, PLASTICS AND COMPOSITES:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
06 13 33, PIER TIMBERWORK.
DIVISION 9 - FINISHES:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
09 97 13.26, COATING OF STEEL WATERFRONT STRUCTURES.
DIVISION 26 - ELECTRICAL:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTIONS 26 00 00.00 20, BASIC ELECTRICAL MATERIALS AND METHODS; 26 05 19.00 10, INSULATED WIRE AND
CABLE; AND 26 27 29, MARINA ELECTRICAL WORK.
2. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
26 42 13.00 20, CATHODIC PROTECTION BY GALVANIC ANODES.
DIVISION 31 - EARTHWORK:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
31 62 19.15, PILE ENCASEMENTS.
DIVISION 32 - EXTERIOR IMPROVEMENTS:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION 32 01 19.61, RESEALING OF JOINTS IN RIGID PAVEMENT; AND 32 31 13, CHAIN LINK FENCES.
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION:
1. ADHERE TO THE REQUIREMENTS OF THESE PROJECT DRAWINGS AND SPECIFICATIONS, INCLUDING SECTION
35 51 13.00 20, CONCRETE FLOATING PIER FOR SMALL CRAFT.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETAINING A FLOATING DOCK MANUFACTURER FOR THE DESIGN AND FABRICATION OF THE FLOATING DOCKS. FOR THIS PROJECT, THE FLOATING DOCK SHALL BE THE PRODUCT OF BELLINGHAM MARINE INDUSTRIES, INC. THE DESIGN SHALL BE STAMPED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE UNITED STATES.
CONSTRUCTION SEQUENCING:
1. STA NEW YORK IS AN ACTIVE USCG INSTALLATION AND WILL MAINTAIN CONTINUOUS OPERATION
THROUGHOUT THE COMPLETION OF THIS PROJECT. ACCORDINGLY, THE CONTRACTOR SHALL NOT
INTERFERE WITH STATION OPERATIONS OR IMPEDE UPLAND OR WATER BASED ACCESS. PERSONNEL ACCESS TO EMERGENCY RESPONSE VESSELS AND THE ABILITY TO GO UNDERWAY SHALL BE CONTINUOUSLY
MAINTAINED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPROVAL TO BEGIN EACH PHASE OF WORK IN
COORDINATION WITH THE KO AND STA NEW YORK EPO.
3. CONTRACTOR CONSTRAINTS TO SEQUENCING ARE AS FOLLOWS:
A. DESIGN, APPROVAL, FABRICATION, AND DELIVERY OF THE FLOATING DOCKS AND ASSOCIATED COMPONENTS, STEEL COATING REMOVAL AND COATING SYSTEMS, SACRIFICIAL ANODES, TIMBER FACING BOARDS, CONCRETE REPAIR MATERIAL, ELECTRICAL MATERIAL, AND ALL OTHER REQUIRED ITEMS AND MATERIALS SHALL BE COMPLETED BY THE CONTRACTOR PRIOR TO COMMENCING ANY WORK ON SITE IN
ORDER TO MINIMIZE THE AMOUNT OF TIME THAT THE STA OPERATIONS WILL BE IMPACTED.
B. WORK ON THE FLOATING DOCK, SOUTH BREAKWATER, AND BOARDING FLOATING DOCK SHALL BE PERFORMED IN THREE (3) PHASES AS SHOWN ON THESE DRAWINGS. THE STA NEW YORK VESSELS DISPLACED DURING EACH PHASE WILL TEMPORARILY MOOR AT THE ADJACENT FLOATING DOCKS NOT INCLUDED IN THE CURRENT PHASE. THE KTR SHALL MAINTAIN UPLAND ACCESS TO THE OPERATIONAL FLOATING DOCKS. THE KTR SHALL ALSO MAINTAIN CLEAR ACCESS FROM THE OPERATIONAL FLOATING
DOCKS TO THE BOAT BASIN ENTRANCE FOR STA NEW YORK VESSELS AT ALL TIMES.
C. AREAS OF THE FACILITY NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING
CONSTRUCTION. KEEP ALL CONSTRUCTION ACTIVITIES AND PERSONNEL CLEAR OF FACILITY OPERATIONS.
EXCLUSIONARY PERIOD:
1. NO WORK SHALL BE PERFORMED FROM SEPTEMBER 7, 2025 TO SEPTEMBER 28, 2025 AND FROM SEPTEMBER 6, 2026 TO SEPTEMBER 27, 2026 IN ORDER TO AVOID IMPACTS TO USCG STA NEW YORK SUPPORT OF THE UNITED NATIONS GENERAL ASSEMBLY. THIS PERIOD WILL NOT BE CONSIDERED PART OF THE TIME ALLOWED
FOR THE PERFORMANCE OF THE WORK.
DESIGN VESSEL SPECIFICATIONS
VESSEL
LENGTH
(FT)
BEAM
(FT)
DRAFT
(FT)
DISPLACEMENT
(LB)
45' RESPONSE BOAT
- MEDIUM 44.8 14.6 3.3 36,500
29' RESPONSE BOAT
- SMALL II 28.7 8.4 1.7 8,300
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
STA NY
AutoCAD SHX Text G-003
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253G-003.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
CIVIL ENGINEERING
HY
D
E
E
E
E
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
EEEEE
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
U
E
E
E
E
E
E
E
E
E
E
E
E E
SA
N
SA
N
SA
N
E E
E E
E
E
E E
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
F
F
F F
F
F
A5 OVERALL WATERFRONT PLAN
SCALE: 1" = 20'
20' 40'0
E5
CD104
C-104
REPAIR/REPLACE MRG
FLOATING DOCKS, SEE
REPAIR SOUTH
BREAKWATER, SEE
REPAIR NORTH
BREAKWATER, SEE
REPAIR
SOUTH PIER, SEE
REPAIR
SEAWALL, SEE
BUILDING #10
GRASS SLOPE
ASPHALT
DRIVE
ASPHALT
DRIVE
ASPHALT
DRIVE
BUILDING #8
BOAT
RAMP
G
AN
G W
AY
G
AN
G W
AY
A5
CD103
C-103
A5,D5
CD106
C-106 D2,D7
CD105
C-105
NEW YORK HARBOR
EBB
FLOOD
BOAT BASIN
NAUTILUS COURT
' S
EW
ER
E
AS
EM
EN
T
A1 V-101
STA NY WATERFRONT
SOUTHEAST, 16 OCT 2024
F9 V-101
STA NY WATERFRONT
WEST, 16 OCT 2024
F9 V-101
A1 V-101
C5
CD101
C-101
N
YC
S
EW
ER
O
U
TF
AL
L
BRONZE DISC FOUND "NATIONAL
OCEAN SERVICE BENCHMARK 9050A"
EL. = 7.89 (SID)
ELEVATION NOT PUBLISHED
"L" CUT SET
ON TOP WALL
EL. = 8.66 (SID)
BRONZE DISC FOUND "NATIONAL
OCEAN SERVICE BENCHMARK 9050B"
EL. = 5.38 SID
ELEVATION NOT PUBLISHED
SURVEY NOTE:
1. ELEVATION BENCHMARK DATA SHOWN WAS
TAKEN FROM REFERENCE B LISTED ON DWG
G-002.
ELEVATED ELECTRICAL
SUPPLY PANELS FOR
FLOATING DOCKS AND
WATERFRONT OVERHEAD
LIGHTING, AMONG
OTHERS
USCG ASSET SUMMARY
ITEM NO. COMMON NAME REAL PROPERTY NAME RPUID
1 MRG FLOATING DOCKS STA NY MRG FLOATS
(SMALL BOATS)
2 BOARDING FLOATING
DOCK
BOARDING FLOAT 842140
3 SOUTH BREAKWATER STA NY BOAT MRG
BRKWTR SOUTH
70975
4 NORTH BREAKWATER NORTH BREAKWATER 70974
5 SOUTH PIER SOUTH PIER 9858
6 SEAWALL CONCRETE
BULKHEAD/SEWALL
REPAIR BOARDING
FLOATING DOCK, SEE A5
CD102
C-102
CONTRACTOR'S STAGING AREA
(APPROX. 3,000 SF), FINAL SIZE AND
LOCATION TO BE DETERMINED BY KO
AND UNIT EPO
FUEL
DISPENSERS
REPLACE OVERHEAD LIGHTING
ELECTRICAL WIRING DOWNSTREAM OF
THIS LOCATION, SEE A3/S-503 AND E8/E-501
MARINE
DIESEL &
GASOLINE
FUEL TANKS
NORTH
PLAN
TRUE N
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
MAPPING
AutoCAD SHX Text
OVERALL WATERFRONT PLAN
AutoCAD SHX Text
STA NY
AutoCAD SHX Text V-101
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253V-101.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
SHEET ID
T
E E
T T
T T
T
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T T
T T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SOLICITATION NO,: CONTRACT NO,:
C5 MRG FLOATING DOCK PLAN
SCALE: 1" = 10'
10' 20'0
EX. SOUTH BREAKWATER STEEL
FRAME AND TIMBER FACING BOARDS
FL
OATIN
G D
OCK A
FL
OATIN
G D
OCK B
FL
OATIN
G D
OCK C
FL
OATIN
G D
OCK D
FL
OATIN
G D
OCK E
FL
O
AT
IN
G D
O C
K F
G
AN
G W
AY
NEW YORK HARBOR
BOAT BASIN
EBB
FLOOD
SOUTH PIER
EX. SOUTH
BREAKWATER
WALKWAY
R&D FLOATING DOCK A&B (OBI 2)
R&D COATING AT GUIDE PILES F1 - F17 (BBI 1)
R&D FLOATING DOCK F (OBI 1)
R&D GANGWAY (OBI 3)
R&D MAIN FLOATING DOCK
(BBI 1)
R&D SHORE TIE E LINE FROM
SBW J BOX TO EL PANEL (BBI 1)
EX.
TRANSITION
PLATE
SB1
SB2
SB3
SB4
SB5
SB6
SB7
SB8
SB9
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
EX. 14"Ø STEEL FLOATING DOCK
GUIDE PILE (TYP. OF 11, PILE F1-11)
EX. SOUTH
BREAKWATER
SUPPORT PILE (TYP.)
SHORE TIE (TYP.)
EX. SHORE TIE
JUNCTION BOX (TYP.)
EX. STEEL FRAME
(TYP. FLOATING DOCKS A-E)
16"Ø STEEL FLOATING DOCK
GUIDE PILE W/ ANODE
(TYP. OF 6, PILES F12-17)
8'±
40'±
(TYP. FLOATING DOCK A-E)6'± (TYP. FLOATING
DOCK A-E)
8'±
48'±
A2
FLOATING DOCK SECTION
SCALE: 1" = 10'
10' 20'0
MHHW
EL. 5.1'
MLLW
EL. 0.0'
PILE CUT-OFF
EL. 24.8'±
EX. MUDLINE,
EL. VARIES
SOUTH
BREAKWATER
EX. 16"Ø STEEL
FLOATING DOCK
GUIDE PILE
EX. 14"Ø STEEL
FLOATING DOCK
GUIDE PILE
PILE COATING
R&D LIMITS
EL. 15.5'
PILE COATING
R&D LIMITS
EL. 1.0'
R&D FLOATING
DOCK A&B (OBI 2)
R&S SHORE TIE (OBI 2)
R&D SHORE TIE
E LINE
R&D FLOATING DOCK A&B STEEL FRAMES (OBI 2)
R&D MAIN FLOATING DOCK
A2
CD101
EX. ANODE
F1 F2 F3F9F16
MLLW
EL. 0.0'
MHHW
EL. 5.1'
PILE CUT-OFF
EL. 24.8'±
PILE COATING
R&D LIMITS
EL. 15.5'
PILE COATING
R&D LIMITS
EL. 1.0'
SOUTH
PIER
SOUTH
BREAKWATER
EX. 14"Ø STEEL
FLOATING DOCK
GUIDE PILE (TYP.)
A5 FLOATING DOCK SECTION
SCALE: 1" = 10'
10' 20'0
R&S T BOX AND
STANCHION
R&D TRANSITION
PLATE (OBI 1)
R&D FLOATING DOCK F (OBI 1)
R&D GANGWAY (OBI 3)
R&D MAIN
FLOATING DOCK
R&D T LINE (OBI 1)
R&D PILE
COATING
(TYP.)
R&D PILE
COATING
(TYP.)
A5
CD101
SEE DEMOLITION
NOTE 4
FLOATING DOCK DEMOLITION NOTES:
1. WORK ON THIS DRAWING INCLUDES BBI 1, OBI 1, OBI 2, AND OBI 3. SEE SCHEDULE ON THIS DRAWING FOR DETAILS.
2. WORK ON THE MRG FLOATING DOCKS, THE SOUTH BREAKWATER, AND THE BOARDING FLOATING DOCKS SHALL BE PERFORMED IN THREE
(3) SEPARATE PHASES AS SHOWN IN ORDER TO ALLOW FOR CONTINUOUS UNIT OPERATIONS.
3. THE CONTRACTOR SHALL REMOVE, SALVAGE, AND SECURELY STORE THE FOLLOWING DURING CONSTRUCTION:
3.1. MAIN FLOATING DOCK:
3.1.1. SHORE TIE EL PANEL/STANCHION
3.1.2. TELEPHONE BOX/STANCHION
3.1.3. DOCK BOXES (6 EA)
3.1.4. J BOXES (FOR FLOATING DOCK A&B IF OBI 2 NOT EXERCISED)
3.1.5. HOSE REELS (IF PRESENT)
3.2. FLOATING DOCK F (OBI 1):
3.2.1. GANGWAY & LANDING PLATE (IF OBI 3 IS NOT EXERCISED)
3.3. FLOATING DOCK A&B (OBI 2):
3.3.1. SHORE TIES/STANCHIONS
4. P&M FLOATING DOCKS A THROUGH E WHILE THEY ARE DISCONNECTED FROM THE MAIN FLOATING DOCK AND ADEQUATELY SECURE THEM SO THAT THEY ARE PROTECTED FROM ADVERSE WEATHER CONDITIONS. P&M STEEL FRAMES FOR RECONNECTION TO REPLACEMENT MAIN FLOATING DOCK. CONTRACTOR TO DETAIL THIS WORK AS PART OF ITS DEMO PLAN, SEE 02 41 00, DEMOLITION AND DECONSTRUCTION.
FLOATING DOCK BID ITEM SCHEDULE
BBI 1
MAIN FLOATING
DOCK
●R&S DOCK BOXES (6 EA)
●TEMPORARILY DETACH AND STABILIZE FLOATS A-E
●R&D MAIN FLOATING DOCK
ELECTRICAL ●R&S SHORE TIE EL PANEL/STANCHION
●R&S T BOX/STANCHION
●R&D EL LINE FROM SBW J BOX TO EL PANEL
●R&D SHORE TIE EL LINES (MAIN, A, B, C, D, & E)
●R&D J BOXES (C,D,&E)
●R&S J BOXES (A&B)
GUIDE PILES ●R&D COATING AT GUIDE PILES F1-F17, SEE A8/S-501
OBI 1: REPLACE FLOATING DOCK F
FLOATING
DOCK F
●R&S GANGWAY (IF OBI 3 NOT EXERCISED)
●R&D FLOATING DOCK
●R&D TRANSITION PLATE
ELECTRICAL ●R&D T LINE FROM T BOX/STANCHION TO S PIER J-BOX
OBI 2: REPLACE FLOATING DOCKS A&B
FLOATING
DOCKS A&B
●R&D FLOATING DOCK
●R&D STEEL FRAMES (4 EA TOTAL)
ELECTRICAL ●R&S SHORE TIE/STANCHION (2 EA)
●R&D J BOXES (2 EA)
OBI 3: REPLACE GANGWAY
GANGWAY ●R&D GANGWAY, HINGE, ROLLER, AND ROLLER PLATE
MAIN FLOATING DOCK (240' ±)
PHASE 1 MRG FLOATING DOCK AND SOUTH
BREAKWATER REPAIR LIMITS, SEE NOTE 2
PHASE 2 MRG FLOATING DOCK AND SOUTH
BREAKWATER REPAIR LIMITS, SEE NOTE 2
F1,F3 C-901
F5 C-901
F7 C-901
F9 C-901
D1 C-901
NORTH
PLAN
TRUE N
AutoCAD SHX Text J
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
MRG FLOATING DOCK DEMO PLAN
AutoCAD SHX Text
MRG FLOATS (SMALL BOATS)
AutoCAD SHX Text
CD101
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253CD101.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
SOLICITATION NO,: CONTRACT NO,:
BO
AR
D
IN
G
FLO
ATIN
G
D O
C K
G
AN
G W
AY
A5 BOARDING FLOATING DOCK PLAN
SCALE: 1" = 10'
10' 20'0
BOAT BASIN
BO
AT R
AM
P
SEAWALL
B2
B1
B3
B4 B5
R&D COATING AT GUIDE
PILES B1 - 15 (BBI 1)
BOARDING FLOATING DOCK REPAIR NOTES:
1. WORK ON THIS DRAWING IS INCLUDED
UNDER BBI 1.
2. WORK ON THE MRG FLOATING DOCKS,
THE SOUTH BREAKWATER, AND THE
BOARDING FLOATING DOCKS SHALL BE
PERFORMED IN THREE (3) SEPARATE
PHASES AS SHOWN IN ORDER TO
ALLOW FOR CONTINUOUS UNIT
OPERATIONS.
PHASE 3 BOARDING FLOATING
DOCK REPAIR LIMITS, SEE NOTE 2
NORTH
PLAN
TRUE N
B9 C-902
A1 C-902
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
BOARDING FLOATING DOCK DEMO PLAN
AutoCAD SHX Text
BOARDING FLOAT
AutoCAD SHX Text
CD102
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253CD102.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
T T
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T T
T T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SOLICITATION NO,: CONTRACT NO,:
A5 BREAKWATER PLAN
SCALE: 1" = 10'
10' 20'0
EX. SOUTH BREAKWATER
STEEL FRAME AND DESIGNATION (TYP.)
FL
OATIN
G D
OCK A
FL
OATIN
G D
OCK C
FL
OATIN
G D
OCK D
FL
OATIN
G D
OCK E
FL
O
AT
IN
G D
O C
K F
MAIN FLOATING DOCK
G
AN
G W
AY
NEW YORK HARBOR
BOAT BASIN
EBB
FLOOD
SOUTH PIER
EX. SOUTH BREAKWATER PILE BRACING
AND WALKWAY (ABOVE SUPPORT PILES)
TRANSITION
PLATE
A2
TYPICAL BREAKWATER SECTION
SCALE: 1/4" = 1'-0"
4' 8'0
MHW
EL. 4.7'
MLLW
EL. 0.0'
R&D COATING ON PILE/BONNET
(TYP. SB1-SB23)
R&D DETERIORATED PT 4X12
VERTICAL TIMBER FACING BOARDS,
SEE NOTE 5
R&D COATING AT
CONTIGUOUS DELAMINATED
AREAS WITHIN 12" OF MHW
R&D GALV. BOLTED CONNECTIONS AT REPLACEMENT TIMBER
FACING BOARDS (TYP. OF 2 BOLTED CONNECTIONS PER
STEEL FRAMING WALE). P&M WALE SUCH THAT REPLACEMENT
BOLTS CAN BE INSTALLED PROPERLY
1'-0"
PILE CUT-OFF
SBW: EL. 11.0'±
TOP OF FACING BOARD
EL. 12.0'±
BASE OF BOARD
EL. VARIES
EX. STEEL FRAMING WALE (TYP., QTY VARIES
FROM 2 TO 3 ALONG LENGTH OF
BREAKWATERS BASED ON MUDLINE DEPTH
R&D COATING ON W12 STEEL FRAME
ASSEMBLY (TYP. SF1-SF8)
EX. WALKWAY
(SOUTH BREAKWATER ONLY)
EX. 42"Ø STEEL PILE BONNET AND
GROUTED ANNULAR SPACE
EX. PRESSURE TREATED 4x12
VERTICAL TIMBER FACING
BOARD AT 12" O.C.
EX. STEEL FRAMING (HEIGHT VARIES
BASED ON MUDLINE DEPTH)
EX. MUDLINE,
EL. VARIES
R&D DETERIORATED PT 4X12 VERTICAL
TIMBER FACING BOARDS AT SF4-SF8 (TYP.
OF 40 EA, SEE NOTE 5)
R&D COATING ON STEEL
FRAME ASSEMBLY
(TYP. SF1-SF8)
R&D COATING ON PILE/BONNET & UPPER
PILE CONNECTION (TYP. SB1-SB23)
SB1
SB2
SB3
SB4
SB5
SB6
SB7
SB8
SB9
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
A2
CD103
R&D COATING ON PILE COVER PLATE
(TYP. SB1-SB23) R&D COATING ON UPPER PILE
CONNECTION (TYP. SB1-SB23)
SOUTH BREAKWATER DEMOLITION NOTES:
1. WORK ON THIS DRAWING IS INCLUDED UNDER BBI 1.
2. WORK ON THE MRG FLOATING DOCKS, THE SOUTH BREAKWATER, AND THE BOARDING FLOATING DOCK SHALL BE PERFORMED IN THREE (3) SEPARATE PHASES AS SHOWN IN ORDER TO ALLOW FOR CONTINUOUS UNIT OPERATIONS.
3. ALL STEEL PILES, BONNETS, FRAME ASSEMBLIES, AND PILE CONNECTIONS SHALL BE CLEANED AND RECOATED IN
ACCORDANCE WITH 09 97 13.26, COATING OF STEEL WATERFRONT STRUCTURES.
4. REMOVAL OF EXISTING VERTICAL TIMBER FACING BOARDS WILL NOT BE REQUIRED AS PART OF RECOATING. RECOAT STEEL
FRAMING UP TO AND AROUND ALL TIMBER INTERFACES.
5. SOUTH BREAKWATER VERTICAL TIMBER FACING BOARDS:
5.1. REPLACE ALL BOARDS AT SOUTH BREAKWATER FRAMES SF1, SF2 AND SF3.
5.2. AT SOUTH BREAKWATER FRAMES SF4 - SF8, 40 EA BOARDS ARE ESTIMATED TO REQUIRE REPLACEMENT. CONTRACTOR TO PERFORM A VIDEO DIVE INSPECTION TO IDENTIFY THE TIMBER FACING BOARDS REQUIRING REPLACEMENT BASED ON THEIR CURRENT CONDITIONS. SUBMIT VIDEO AND REPLACEMENT SCHEDULE SUBMITTAL TO COR FOR APPROVAL PRIOR TO
BEGINNING WORK.
5.3. REPLACEMENT TIMBER FACING BOARDS SHALL BE INSTALLED THE SAME DAY THEY ARE R&D IN ORDER TO MAINTAIN
PROTECTION TO THE BOAT BASIN.
FL
OATIN
G D
OCK B
P&M SOUTH BREAKWATER HEAT-TRACED
WATER LINE, LIGHT POLES, TELECOM
SPEAKERS, AND ASSOCIATED CONDUIT
EX. 36"Ø STEEL BREAKWATER SUPPORT PILE WITH
42"Ø STEEL PIPE BONNET AND DESIGNATION (TYP.)
COATING
REMOVAL LIMITS
EL. 4.7' (MHW)
SF
SF
SF3
SF4
SF5
SF6
SF7
SF8
EX. SOUTH BREAKWATER
TIMBER FACING BOARDS (TYP.)
PHASE 1 MRG FLOATING DOCK
AND SOUTH BREAKWATER
REPAIR LIMITS, SEE NOTE 2
PHASE 2 MRG FLOATING DOCK
AND SOUTH BREAKWATER
REPAIR LIMITS, SEE NOTE 2
EX. 36"Ø STEEL PILE
BASE OF
BONNET
SBW: EL. -7.0'±
P&M EX. ANODES
D3 C-901
D5 C-901
D7 C-901
D9 C-901
P&M SOUTH BREAKWATER
HEAT-TRACED WATER LINE, LIGHT
POLES, TELECOM SPEAKERS, AND
ASSOCIATED CONDUIT
NORTH
PLAN
TRUE N
F1,F3 C-901
R&D ALL PT 4X12 VERTICAL TIMBER
FACING BOARDS AT SF1, SF2, AND
SF3 (140 EA±, SEE NOTE 5)
AutoCAD SHX Text J
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text
SHEET ID
AutoCAD SHX Text
MAJOR M&R WATERFRONT (FY25 CPOP)
AutoCAD SHX Text
CG STA NEW YORK
AutoCAD SHX Text
STATEN ISLAND
AutoCAD SHX Text
NY
AutoCAD SHX Text
CIVIL DEMOLITION
AutoCAD SHX Text
SOUTH BREAKWATER DEMO PLAN
AutoCAD SHX Text
BRKWTR SOUTH
AutoCAD SHX Text
CD103
AutoCAD SHX Text 18362253
AutoCAD SHX Text P18362253
AutoCAD SHX Text
P18362253CD103.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CIVIL ENGINEERING UNIT PROVIDENCE
AutoCAD SHX Text
475 KILVERT ST., SUITE 100
AutoCAD SHX Text
WARWICK, RI 02886
AutoCAD SHX Text
DAVID J. ARPIN, PE
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DA
AutoCAD SHX Text
1DD
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
MAY 2025
AutoCAD SHX Text
US COAST GUARD
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
EDITED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
PLOTTING SCALE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
USCG DRAWING N0.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
USCG PROJECT NO.
AutoCAD SHX Text
USCG FILENAME
AutoCAD SHX Text
A/E COMPANY:
AutoCAD SHX Text
CONSULTING A/E:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
A/E PROJECT NO.:
EEEEEEEEEEEEE
E
E
E
E E
E
E
E
SOLICITATION NO,: CONTRACT NO,:
A5 ICE SCREEN SECTION
SCALE: 1/4" = 1'-0"
NORTH BREAKWATER STEEL
FRAME AND DESIGNATION (TYP.)
NEW YORK HARBOR
BOAT BASIN
EBB
FLOODNORTH BREAKWATER
SUPPORT PILE AND
DESIGNATION (TYP.)
PILE BRACING
(ABOVE SUPPORT PILES)
A2
OUTBOARD BREAKWATER SECTION
SCALE: 1/4" = 1'-0"
4' 8'0
MHW
EL. 4.7'
MLLW
EL. 0.0'
R&D COATING ON PILE/BONNETS
(TYP. NB1-NB7)
R&D DETERIORATED PT 4X12
VERTICAL TIMBER FACING BOARDS
(TYP. OF 30 EA, SEE NOTE 4)
R&D COATING ON
CONTIGUOUS DELAMINATED
AREAS WITHIN 12" OF MHW
1'-0"
PILE CUT-OFF
NBW: EL. 7.5'±
TOP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .