This is a one-line electrical system diagram for Transformer T8 and Buildings 4, 5, and 6 at a VA Roseburg Healthcare System facility in Roseburg, Oregon, dated November 4, 2025. The diagram illustrates the electrical distribution architecture for the Electrical System Survey FY23 project and shows the interconnection between the utility primary service, transformer, and building electrical infrastructure.
The diagram depicts a single-phase primary T-8 fuse connection from the utility (UTIL: T8 Primary) feeding into a medium voltage transformer (Med Volt XFMR T-8) with a Site_XF T8 tap. The transformer output connects to a Site Panel Meters fuse unit, which then distributes power to Building 4 through a 200A GE main breaker, and to Buildings 5 and 6 through a Building 5 Meter Bank Feed. The distribution to Buildings 5 and 6 includes four meter main circuits (5A, 5B, 6A, 6B), each equipped with 125A breakers feeding individual panels. Building 5 utilizes a 400A GE main breaker on Panel 5A, while Buildings 5 and 6 employ 125A ITE main breakers on Panels 5B, 6A, and 6B respectively. The diagram is drawn to scale NTS and includes design and review approvals from personnel at Paradigm Engineering.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSFORMER:
10-1-2025
653-23-104
VAROSBS JK JK
ELECTRICAL SYSTEM SURVEY FY23
T84, 5, 6 T8.2
11-4-2025
SKM ONE LINE DIAGRAM TRANSFORMER T8 & BUILDINGS 4, 5 AND 6
Start of Single-Phase
S
P Med Volt XFMR T-8
Primary T-8 Fuse
UTIL: T8 Primary
TAP: Site_XF T8
FU: Site_Pnl Meters
Bldg 4 Final Run Bldg 5 Meter Bank Feed
200A Main Bldg 4
200A GE Main Breaker Bldg 4 Bldg 5 Meters
Meter Main 125A Breaker 5A Meter Main 125A Breaker 5B Meter Main 125A Breaker 6A Meter Main 125A Breaker 6B
Feed to Panel 5A Feed to Panel 5B Feed to Panel 6A Feed to Panel 6B
Panel 5A Panel 5B Panel 6A Panel 6B
400A GE Main Breaker 5A 125A ITE Main Breaker 5B 125A ITE Main Breaker 6A 125A ITE Main Breaker 6B