STATE OF HAWAII
DEPARTMENT OF HAWAIIAN HOME LANDS
91-5420 Kapolei Parkway, Kapolei, HI. 96707
PLANS
FOR
FURNISHING LABOR AND MATERIALS FOR
WAIMANALO FLOOD CONTROL CHANNEL
IMPROVEMENTS PHASE 2
WAIMANALO, ISLAND OF OAHU, HAWAII
IFB No.: IFB-25-HHL-019
January 2025
Digitally signed by Ather Dar
Date: 2024.06.17
10:47:20 -10'00'
11/16/24
Willard Nishigata
A2024-06-0601 by ATHER R. DAR
Date: 2024.10.17
10:02:22 -10'00'
11/16/24
Date: 2024.09.12
15:14:34 -10'00'
11/16/24
Date:
2024.06.17
10:50:42 -10'00'
11/16/24
Date: 2024.06.17
10:51:33 -10'00'
11/16/24
Date:
2024.06.17
10:52:15 -10'00'
11/16/24
Date:
2024.06.17
10:52:58 -10'00'
11/16/24
Date:
2024.06.17
10:53:47 -10'00'
11/16/24
Date:
2024.06.17
10:54:29 -10'00'
11/16/24
Date:
2024.06.17
10:55:14 -10'00'
11/16/24
Date:
2024.06.17
10:56:03 -10'00'
11/16/24
Date: 2024.06.17
10:56:52 -10'00'
11/16/24
Date: 2024.06.17
10:57:34 -10'00'
11/16/24
Date:
2024.06.17
10:58:20 -10'00'
11/16/24
Date: 2024.06.17
10:59:05 -10'00'
11/16/24
Date:
2024.06.20
08:58:00 -10'00'
11/16/24
Date:
2024.06.20
09:00:34 -10'00'
11/16/24
Digitally signed by
Ather Dar
Date:
2024.06.20
09:02:35 -10'00'
11/16/24 by Ather R. Dar Date:
2024.06.20 09:09:36-10'00'
11/16/24 by Ather R. Dar Date:
2024.06.20 09:09:36-10'00'
11/16/24
Date:
2024.06.17
11:04:20 -10'00'
11/16/24
Date:
2024.06.17
11:05:18 -10'00'
11/16/24
Date: 2024.06.17
11:06:09 -10'00'
11/16/24
Rev. 11/7/2022
City and County of Honolulu
Appendix B Erosion and Sediment Control Plan Small Project Template for Categories 1A, 1B and 2
Construction Site Project Name:
Physical Site Address:
Building Permit Application Number:
Disturbed Area (square-feet) *:
*Disturbed area includes the project area, construction access on unpaved surfaces, and storage/ staging area(s).
Instructions:
Use this template to prepare an Erosion and Sediment Control Plan (ESCP) for projects under the City and County of Honolulu, Department of Planning and Permitting (DPP) Categories 1A, 1B, and 2. This ESCP may be prepared and must be signed by the property owner or an authorized agent designated by the owner. Submit a completed ESCP with the building permit application and always keep a copy of the approved ESCP on the job site.
Any changes to the approved ESCP must be approved by the DPP. Refer to the guidance booklet “How to Prepare Erosion and
Sediment Control Plan for Small Construction Projects” available on DPP’s Storm Water Quality (SWQ) website for more information on each BMP below.
PART 1: BMP Selection - Select the BMPs which will be used at the site and if not used, provide a brief explanation for why it is not needed or impracticable for the site.
I.EROSION PREVENTION BMPs: practices that prevent erosion from occurring.
1. Permanent Stabilization (REQUIRED) Prior to closing of any permit(s) permanent stabilization must be in place which includes the following requirements:
• All exposed disturbed areas must be permanently stabilized with ground covering such as vegetation, gravel, or pavers;
• Rain gutters, downspouts, and channelized flows must be installed and functioning as designed;
• In seeded areas, grass or vegetation must cover at least 90 percent of the disturbed soils or must be temporary stabilized while it is growing;
• Temporary measures, such as sediment barriers, should be removed when permanent measures are in place;
• All paved surfaces must be clean; and
• Storm drain inlet filters must be removed after all cleanup activities have been completed.
2. Slope Management and Protection (Category 1B and 2 only) Areas disturbed on a slope greater than 15% must be protected when work is inactive for seven (7) days or more.
H
To find the slope, divide the vertical height of your slope by the horizontal length of your slope and multiply by 100. For example, if your slope measures 3 feet vertically, and 10 feet horizontally, your slope would be 3 / 10 X 100= 30%.
Check if will be used:
1. Rolled erosion control products ☐
2. Hydraulic mulch or hydroseed ☐
3. Hydraulic or bonded fiber matrix ☐
4. Planting and/ or vegetation providing at least 70% surface cover ☐
5. Other: (please specify): ☐
Provide an explanation on the next page when this “will not use” is checked: ☐ Will not use
APPROVAL (for official use only)
Approved by: ___________________
Date: __________________________
SWQR Job #: ___________________
V
DelilahLiccud Text Box Waimanalo Flood Control Channel Concrete Lining Phase 2 flung Typewritten Text
SWQR2024-07-2111
flung Typewritten Text 11/8/24
Appendix B
Rev. 11/7/2022
If Slope Management and Protection will not be used, provide brief explanation:
3. Temporary Stabilization (Category 1B and 2 only)
Use one or more of the following to protect disturbed areas that will not be worked on within 14 days:
Check if will be used:
1. Rolled erosion control products ☐
2. Hydraulic mulch or hydroseed ☐
3. Hydraulic or bonded fiber matrix ☐
4. Planting and/ or vegetation providing at least 70% surface cover ☐
5. Other: (please specify): ☐
☐ Will not use
If Temporary Stabilization will not be used, provide brief explanation:
II.SEDIMENT CONTROL BMPs: practices to prevent soil and sediment from leaving the project site and entering storm drains during rain events.
1. Perimeter Controls Sediment fences or barriers shall be used at the perimeter of all disturbed areas where there is potential for runoff to flow off the project site, Barriers may include gravel bags, sand bags, fiber rolls, silt fences, compost socks, or an equivalent BMP that intercepts runoff.
☐Will Use
☐Will Not Use
If this Perimeter Control will not be used, provide brief explanation:
2. Storm Drain Inlet Protection Inlet protection is required over storm drains that may receive runoff from your site unless those inlets drain to a sediment basin or trap. Inlet protection should be removed during severe storm events to prevent flooding.
☐Will Use
☐Will Not Use
If this Storm Drain Inlet Protection will not be used, provide brief explanation:
III.GOOD HOUSEKEEPING BMPs: practices that prevent pollution by limiting or reducing potential pollutants at their source.
1. BMP and Site Maintenance (REQUIRED) Regularly inspect and maintain BMPs to ensure continued performance.
2. Dust Control ( REQUIRED FOR FULL OR PARTIAL DEMOLITION OF STRUCTURES)
Use one of the following to control dust:
Check if will be used:
1. Mulching to a depth of one inch or more ☐
2. Sprinkling exposed soils with water to maintain moistness (Show temporary or permanent water sources on ESCP diagram. Indicate if water trucks will be on site.)
3. Vertical dust barriers ☐
☐ Will not Use
If Dust Control will not be used, provide brief explanation:
Do not anticipate delays of 14 days or more.
No storm drain inlet within 50 feet of the project site.
DelilahLiccud Text Box Will not generate dust.
Rev. 11/7/2022
3. Concrete Waste Management Conduct washout off-site or perform onsite in a designated area, away from water bodies, channels, or storm drains. Construct and maintain washout to contain all liquid and concrete waste generated.
☐Will Use
☐Will Not Use
If Concrete Waste Management will not be used, provide brief explanation:
4. Stockpile Management Locate stockpiles away from drainage ways or other areas of concentrated flows and within the property. Use a barrier around stockpiles and cover if they will not be actively used within seven (7) days.
☐Will Use ☐Will Not Use
If Stockpile Management will not be used, provide brief explanation:
5. Vehicle Tracking Control Restrict vehicle traffic to properly designated areas and remove sediment from vehicle tires prior to exiting the project site. All sediments that are tracked or discharged off-site must be swept or vacuumed at the end of each day.
☐Will Use ☐Will Not Use
If Vehicle Tracking Control will not be used, provide brief explanation:
6. Material Delivery, Storage and Use Management Minimize the storage of potential pollutants onsite, store materials in a designated area, and install secondary containment. Storage should be within the property. Do not store materials in buffer areas, near areas of concentrated flow, or areas abutting the City storm drainage system, receiving waters, or drainage improvements that discharge off-site.
☐Will Use ☐Will Not Use
If Material Delivery, Storage, and Use Management will not be used, provide brief explanation:
7. Spill Prevention and Control Keep ample supply of cleanup materials onsite and within the property. Clean up spills immediately, using dry clean-up methods where possible, and dispose of used materials properly.
☐Will Use
☐Will Not Use
If Spill Prevention and Control will not be used, provide brief explanation:
8. Solid Waste Management Provide designated waste collection areas for solid waste or construction and demolition waste, collect trash daily, and dispose at authorized disposal areas. Obtain street permit to locate outside property.
☐Will Use
☐Will Not Use
If Solid Waste Management will not be used, provide brief explanation:
9. Portable Toilets (Sanitary/ Septic Waste Management) Temporary and portable sanitary and septic waste systems shall be mounted or staked in, well-maintained and scheduled for regular waste disposal and servicing. Place it within the property.
☐Will Use ☐Will Not Use
If Portable Toilets (Sanitary/ Septic Waste Management) will not be used, provide brief explanation:
10. Liquid Waste Management BMPs
Rev. 11/7/2022
Contain liquid wastes in a holding pit, sediment basin, roll-off bin, or portable tank of sufficient volume to contain the liquid wastes generated. Place liquid waste management within property.
☐Will Use ☐Will Not Use
If Liquid Waste Management will not be used, provide brief explanation:
11. Vehicle and Equipment Cleaning, Fueling, and Maintenance Prevent pollutants in storm water from vehicle and equipment cleaning, fueling and maintenance by using off-site facilities when feasible, performing work in designated areas only, using spill pads under vehicles and equipment, checking for leaks and spills, and containing and cleaning up spills immediately.
☐Will Use
☐Will Not Use
If Vehicle and Equipment Cleaning, Fueling, and Maintenance will not be used, provide brief explanation:
12. Hazardous Waste Management Prevent or reduce the discharge of pollutants to storm water from hazardous waste through proper material use and waste disposal.
☐Will Use
☐Will Not Use
If Hazardous Waste Management will not be used, provide brief explanation:
13. Contaminated Soil Management Contain contaminated material soil by surrounding with impermeable lined berms or cover exposed contaminated material with plastic sheets. Contaminated soil should be disposed of properly in accordance with all applicable regulations.
☐Will Use ☐Will Not Use
If Contaminated Soil Management will not be used, provide brief explanation:
DelilahLiccud Text Box Will not generate hazardous waste.
DelilahLiccud Text Box No known contamination at site.
Rev. 11/7/2022
PART 2: ESCP Certification – Provide a wet signature to agree to the below. If the owner would like to designate an Authorized Agent, please provide the “Authorized Agent Designation Letter” with the submission of this
Appendix/or ESCP. The letter is available on DPP’s Storm Water Quality (SWQ) website.
ESCP CERTIFICATION
1) By signing, you acknowledge that erosion prevention, sediment control, and good housekeeping BMPs in this ESCP are mandatory conditions of your building and/or grading permit and are subject to inspection and enforcement by the
Department of Planning and Permitting, in accordance with Section 20-3-7 of the Rules Related to Water Quality.
2) If the proposed land disturbing work will be performed in the city sidewalk or right-of-way and/or best management practices installed in the sidewalk area (area between the property line and edge of pavement), the owner is responsible for obtaining a Permit for Street Usage from the Department of Transportation Services, 650 S. King
Street, 2nd Floor, Honolulu, Hawaii, 96813.
3) The owner is responsible for installing appropriate barricades, flashers, and signage for pedestrian and vehicular safety, and removing the inlet protection(s) before a storm event to prevent flooding of the road and after the project site is completely stabilized.
Owner / Authorized Agent Name* *Provide Letter Authorizing Agent Form if different from the Owner
Owner Signature Date
Check this box to designate the person below to be the ESCP Coordinator. If this box is checked, do not submit
Appendix A, unless revising or adding a new ESCP Coordinator to inspect this project.
ESCP Coordinator Name** ** Provide if the ESCP Coordinator is different from the Owner or Authorized Agent.
ESCP Coordinator Signature Date
ESCP Coordinator Certification # Address Line 1 (Street address)
ESCP Coordinator Email Address Line 2 (Apartment, suite, unit, building, floor, etc.)
ESCP Coordinator Phone # City, State, ZIP Code
DelilahLiccud Model
Rev. 11/7/2022
PART 3: Project Schedule - Use the table below or attach a separate project schedule to this ESCP. Project schedules must establish a sequence of all planned actions and activities on the project site, including, but not limited to, all land disturbing activities, the implementation of the BMPs identified in the project ESCP, scheduled inspections and maintenance of BMPs, and the removal of temporary BMPs. (i.e. install BMPs – 1 day, clear & grub - 2 days, construction – 2 weeks, stabilize disturbed areas – 1 day, remove BMPs – after vegetation is 90% establish.)
PROJECT SCHEDULE
Actions Timeline or Date
Notify the Department of Planning and Permitting of Project Start Date – Call 768-8132 or email dpp.npdes@honolulu.gov (Required)
2 weeks before starting work
RAIN RESPONSE PLAN
The following will be performed when severe rain is forecast:
• Temporarily suspend land disturbing activities including clearing, grubbing, grading and trenching.
• Inspect all BMPs and maintain as needed.
• Reinstall BMPs that were removed due to active work in the area.
• If a severe storm is expected, remove inlet protection devices to prevent flooding on surrounding streets.
• Cover or relocate material stockpiles and liquid material containers to avoid contact with rainwater.
• Place spill pans or oil-only spill pads under construction vehicles to prevent runoff from contacting any spilled petroleum products. Properly dispose of any accumulated oily water after the rain event.
• Re-inspect project site after the rain event and replace or maintain BMPs as needed.
Other: (please specify):
Rev. 11/7/2022
PART 4: Site Diagram - Provide a drawing of your site below or attach another map. Include the building outlines, property boundary or fence line, the limits of where your work will be located, flow arrows indicating direction of storm water runoff, location of BMPs, permanent or temporary water sources, and any storm drains within 50 feet of your property. All construction materials and equipment must be placed within the property, with the exception of dumpsters when a street usage permit is obtained.
SITE DIAGRAM
DelilahLiccud Snapshot
DelilahLiccud Rectangle
DelilahLiccud Callout
CONSTRUCTION INGRESS/EGRESS
DelilahLiccud Callout
STAGING AREA
DelilahLiccud Rectangle
DelilahLiccud Ellipse
DelilahLiccud Ellipse
DelilahLiccud Callout
PORTABLE TOILET
DelilahLiccud Callout
STOCKPILE
DelilahLiccud Callout
CONCRETE WASHOUT
DelilahLiccud Callout
CONSTRUCTION INGRESS/EGRESS
DelilahLiccud PolyLine
DelilahLiccud PolyLine
DelilahLiccud PolyLine
DelilahLiccud Callout
SANDBAGS AROUND WORK AREA
DelilahLiccud Callout
SANDBAGS AROUND WORK AREA
DelilahLiccud Callout
SANDBAGS AROUND WORK AREA
DelilahLiccud Arrow
DelilahLiccud Arrow
DelilahLiccud Arrow
DelilahLiccud Callout
RAMP ACCESS TO CHANNEL
DelilahLiccud Line
DelilahLiccud Callout
FILTER SOCK WITHIN CHANNEL DOWNSLOPE OF DISTURBED AREAS
DelilahLiccud Rectangle
DelilahLiccud Rectangle
DelilahLiccud Callout
DUMPSTER
| 06 Plans Cover Sheet |
| Waimanalo Channel Concrete Lining Ph2 permit set (1) |
| Approved Appendix B A2024-06-0601.pdf V1 |
| Approved by: |
| Date: |
| SWQR Job: |
| Construction Site Project Name: |
| Physical Site Address: 41-348 Manawaiola St., Waimanalo, HI 96795 |
| Building Permit Application Number: A2024-06-0601 |
| Disturbed Area squarefeet: 3,175 SF |
| Will not use: On |
| Will use 1: Off |
| Will use 2: Off |
| Will use 3: Off |
| Will use 4: Off |
| Will use 5: Off |
| If Slope Management and Protection will not be used provide brief explanation: Within the (pervious) disturbed areas, there are no slopes greater than 15%. |
| Will not use_2: On |
| If Temporary Stabilization will not be used provide brief explanation: |
| Will Use: On |
| Will Not Use: Off |
| If this Perimeter Control will not be used provide brief explanation: |
| Will Use_2: Off |
| Will Not Use_2: On |
| If this Storm Drain Inlet Protection will not be used provide brief explanation: |
| Will not Use: On |
| If Dust Control will not be used provide brief explanation: |
| Will use 11: Off |
| Will use 12: Off |
| Will use 6: Off |
| Will use 7: Off |
| Will use 8: Off |
| Will use 9: Off |
| Will use 10: Off |
| Will use 13: Off |
| Will Use_3: On |
| Will Not Use_3: Off |
| If Concrete Waste Management will not be used provide brief explanation: |
| Will Use_4: On |
| Will Not Use_4: Off |
| If Stockpile Management will not be used provide brief explanation: |
| Will Use_5: On |
| Will Not Use_5: Off |
| If Vehicle Tracking Control will not be used provide brief explanation: |
| Will Use_6: On |
| Will Not Use_6: Off |
| If Material Delivery Storage and Use Management will not be used provide brief explanation: |
| Will Use_7: On |
| Will Not Use_7: Off |
| If Spill Prevention and Control will not be used provide brief explanation: |
| Will Use_8: On |
| Will Not Use_8: Off |
| If Solid Waste Management will not be used provide brief explanation: |
| Will Use_9: On |
| Will Not Use_9: Off |
| If Portable Toilets Sanitary Septic Waste Management will not be used provide brief explanation: |
| Will Use_10: On |
| Will Not Use_10: Off |
| If Liquid Waste Management will not be used provide brief explanation: |
| Will Use_11: On |
| Will Not Use_11: Off |
| If Vehicle and Equipment Cleaning Fueling and Maintenance will not be used provide brief explanation: |
| Will Use_12: Off |
| Will Not Use_12: On |
| If Hazardous Waste Management will not be used provide brief explanation: |
| Will Use_13: Off |
| Will Not Use_13: On |
| If Contaminated Soil Management will not be used provide brief explanation: |
| Owner Authorized Agent Name: Kehaulani Quartero |
| Date_2: 10/15/2024 |
| Check this box to designate the person below to be the ESCP Coordinator If this box is checked do not submit: On |
| ESCP Coordinator Name: Delilah B. Liccud |
| Date_3: 10/15/2024 |
| ESCP Coordinator Certification: 75896A958I9FBAB_28458 |
| Address Line 1 Street address: 1088 Bishop Street |
| ESCP Coordinator Email: delilah@hawaiiengineering.net |
| Address Line 2 Apartment suite unit building floor etc: Suite 2506 |
| ESCP Coordinator Phone: (808) 533-2092 ext 115 |
| City State ZIP Code: Honolulu, HI, 96813 |
| Project Schedule: Install BMPs |
| 2 weeks before starting workRow1: 1 day |
| Project Schedule 2: Clear site |
| 2 weeks before starting workRow2: 1 day |
| Project Schedule 3: Construct concrete lining |
| 2 weeks before starting workRow3: 365 days |
| Project Schedule 4: Stabilize disturbed areas |
| 2 weeks before starting workRow4: 1 day |
| Project Schedule 5: Remove BMPs |
| 2 weeks before starting workRow5: 1 day |
| Project Schedule 6: |
| 2 weeks before starting workRow6: |
| Other please specify: |