IFB#259 Addendum#1 Attach A
965 KB Posted
- Attached to
- Northside WWTP Aeration Basin Improvements
- Solicitation number
- 2022-IFB-259
- Issued by
- Douglas County, Georgia
About this file
This is Addendum #1 to the bid drawings for IFB #259, issued by the Douglasville-Douglas County Water and Sewer Authority for the Northside WWTP Aeration Basin Improvements project in Douglasville, Georgia. The addendum, dated July 2022, provides detailed civil construction drawings and specifications for the project, which includes installation of aeration equipment in two oxidation ditches, conversion of mixer mounting systems, construction of concrete walkways and canopy structures, installation of RAS weir gates with guardrails and stairs, and associated electrical and site work. The drawings show the overall site plan layout of the wastewater treatment plant facilities, including existing structures such as grit chambers, waste sludge holding tanks, bar screens, clarifiers, chlorine contact chamber, control building, pump station, sludge drying beds, and blower systems. Key construction details include a temporary sediment trap with block and gravel filtration (detail Sd2-BG), concrete walkway specifications with isolation and contraction joint details (detail C-32-0561), installation of six-inch Schedule 40 PVC pipe with minimum three feet of cover, and a four-inch thick concrete walkway. The contractor is required to verify existing conditions in the field prior to construction, coordinate temporary laydown locations with the Authority, restore disturbed areas totaling 0.10 acres through permanent seeding, and comply with Georgia's Manual for Erosion and Sediment Control.
The drawings establish construction standards and technical specifications prepared by Hazen and Sawyer, with the project engineer identified as V. Nguyen and design work by A. Bowling, S. Kim, and B. Jones. Concrete joint details include Type A through Type D configurations for transverse and longitudinal construction joints, with specifications for tie bar placement, spacing, and vertical tolerance. All work will be performed within Authority easements and public right of way, with all necessary federal, state, and local permits previously obtained. The project is characterized as a turnkey effort requiring minimal involvement of Authority personnel, with the contractor responsible for providing all labor, materials, equipment, tools, transportation, and supplies necessary for completion.
Text of this file
W
W
W W
W
W
W
W
W
W
W
W
W
SD SD SD
W
W W
W W
W
W
W
W
SD
SD
SD
SD
SD SD SD SD SD SD
SD
SD SD SD SD SD SD SD
W
W W
W W W W W W W W W W W
SS SS SS SS SS SS SS
SS
W
W W
W W
W
W W
W
W W
W
W
WWWW
W W
W W W
GRIT CHAMBER
WASTE
SLUDGE
HOLDING
TANK
BAR SCREEN
STRUCTURE
100 - NO.2 OXIDATION DITCH
100 - NO.1 OXIDATION DITCH
FINAL
CLARIFIER
NO. 2
FINAL
CLARIFIER
NO.1
CHAMBER CHLORINE
CONTACT
CONTROL
BUILDING
PLANT
PUMP
STATION
SLUDGE
DRYING
BEDS
200 - RAS
COLLECTION
BOX
BLOWER
LODLODLODLODLOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD LOD LOD LOD LOD
PL
O
T D
AT
E:
/2
8/
:2
PM
B Y:
B
JO
N
ES
Fi le
: O :\3
-A
TL
\3
-0
\C
AD
_B
IM
\C
IV
IL
\C
Sa ve d by B
JO
N
ES
S av e da te
: 7 /2
8/
:0
PM
BID DRAWING
NORTHSIDE WWTP
IMPROVEMENTS
DOUGLASVILLE-DOUGLAS COUNTY WATER
AND SEWER AUTHORITY
DOUGLASVILLE,GEORGIA
31247-021
MAY 2022V. NGUYEN
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
1300 ALTMORE AVENUE
SUITE 520
ATLANTA, GEORGIA 30342
1 BID SET 05/2022 VLN
0 20'10
SCALE: 1" = 20
NOTES:
1. EXISTING CONDITIONS SHOWN ARE BASED ON THE BEST
AVAILABLE INFORMATION AVAILABLE TO THE ENGINEER,
INCLUDING RECORD DRAWINGS. THE CONTRACTOR
SHALL VERIFY THE LOCATIONS AND ELEVATIONS OF ALL
ABOVE GROUND STRUCTURES, YARD PIPING, AND DUCT
BANKS IN THE FIELD PRIOR TO THE START OF ANY
CONSTRUCTION ACTIVITIES.
2. RESTORE ANY LAND DISTURBANCE CAUSED BY
EXCAVATION FOR UNDERGROUND PIPING INSTALLATION
AND OPERATION WITH PERMANENT SEEDING PER THE
GRASSING SCHEDULE ON CD001 AND THE MANUAL FOR
EROSION AND SEDIMENT CONTROL IN GEORGIA.
3. DISTURBED AREA = 0.10 ACRES
4. CONTRACTOR TO COORDINATE WITH DDCWSA ON
TEMPORARY LAYDOWN LOCATION PRIOR TO THE START
OF ANY CONSTRUCTION ACTIVITIES.
5. EXTEND 6-INCH SCHEDULE 40 PVC PIPE 2-FEET BEYOND
EDGE OF EXISTING PAVEMENT. SIX INCH PVC SHALL
HAVE MINIMUM 3-FEET OF COVER.
6. INSTALL 4-INCH THICK CONCRETE WALKWAY WHERE
SHOWN. SEE DETAIL C-32-0561 FOR ISOLATION AND
CONTRACTION JOINT DETAILS.
B. JONES
S. KIM
A. BOWLING
C010
NORTHSIDE WWTP
CIVIL
OVERALL SITE PLAN
CONCRETE PAD
AND CANOPY
SEE DRAWING M102
TEMPORARY
SEDIMENT TRAP
ON EXISTING INLET
Sd2-Bg
LIMIT OF
DISTURBANCE
AERATION BASIN
SEE DRAWING M101
FREE BORE INSTALLATION OF
6" SCH 40 PVC, SEE NOTE 5
6-INCH PVC CASING PIPE
CONCRETE WALKWAY
SEE NOTE 6 AND SEE
INSET A
ISOLATION JOINT AT EXISTING
CONCRETE WALKWAY OR
STRUCTURE, TYP
CONTRACTION
JOINT, TYP
SCALE: 1"=5'
INSET A
CANOPY PAD
2 ADDENDUM #1 07/2022 VLN
PL
O
T D
AT
E:
/2
8/
:2
PM
B Y:
B
JO
N
ES
Fi le
: O :\3
-A
TL
\3
-0
\C
AD
_B
IM
\C
IV
IL
\C D
Sa ve d by
J
JO
R D
AN
S av e da te
: 4 /4
/2
:0
AM
BID DRAWING
NORTHSIDE WWTP
IMPROVEMENTS
DOUGLASVILLE-DOUGLAS COUNTY WATER
AND SEWER AUTHORITY
DOUGLASVILLE,GEORGIA
31247-021
MAY 2022V. NGUYEN
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
1300 ALTMORE AVENUE
SUITE 520
ATLANTA, GEORGIA 30342
1 BID SET 05/2022 VLN
B. JONES
S. KIM
A. BOWLING
CD001
NORTHSIDE WWTP
CIVIL
CONSTRUCTION DETAILS
Ds3 - PERMANENT COVER
1' MIN. 2' MAX.
NOTE:
1. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 12 INCH OPENINGS SHALL BE FITTED OVER ALL
BLOCK OPENINGS TO HOLD GRAVEL IN PLACE.
2. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM
DRAIN. THE FIRST ROW OF BLOCKS WILL BE PLACED HERE FOR LATERAL SUPPORT.
3. ONE BLOCK (AS SHOWN) IS TO BE PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE
BOTTOM ROW TO ALLOW FOR POOL DRAINAGE.
FOUNDATION SET 2" BELOW
CREST OF STORM DRAIN
DROP INLET
W/ GRATE
TEMPORARY
SEDIMENT POOL
GRAVEL
DEWATERING
RUNOFF WATER
WITH SEDIMENT
WIRE SCREEN
BLOCK AND GRAVEL SECTION
WIRE SCREEN
DROP INLET GRATE
GRAVEL FILTER SHOULD
HAVE SLOPE OF 2:1
CONCRETE
DEWATERING
BLOCK AND GRAVEL PERSPECTIVE
Sd2-BG INLET SEDIMENT TRAP
BLOCK AND GRAVEL
BLOCK
LONGITUDINAL CONTRACTION JOINT
T
L
#4 (30" LONG)
TIE BAR AT
2'-6" CENTERS
TRANSVERSE CONTRACTION JOINT
T
NOTES:
T/
L/2 L/2
C-32-0561
S-03-0201 S-03-0201
TYPE A
TYPE B
T
L
T/
L/2 L/2
S-03-0202
INTERIM OR PLANNED TRANSVERSE
OR LONGITUDINAL CONSTRUCTION
JOINT
TYPE C
A TRANSVERSE AND LONGITUDINAL
CONSTRUCTION JOINTS, TYPE C, SHALL BE
CONSTRUCTED AT THE END OF EACH DAYS
OPERATIONS (PLANNED JOINT) OR WHENEVER
THE PLACING OF CONCRETE IS SUSPENDED
FOR MORE THAN 30 MINUTES (INTERIM JOINT).
AN APPROVED HEADER SHALL BE USED AT
INTERIM JOINTS AND SHALL BE DESIGNED TO
PERMIT THE PLACEMENT OF TIE BARS AND
SHALL HOLD SUCH BARS IN THEIR CORRECT
LOCATIONS.
B PLANNED TRANSVERSE AND LONGITUDINAL
CONSTRUCTION JOINTS SHALL BE LOCATED AT
THE SAME SPACING REQUIRED FOR
CONTRACTION JOINTS. REFER TO JOINT
LAYOUT PLANS.
C VERTICAL TOLERANCE FOR PLACEMENT OF
DOWELS OR TIE BARS SHALL BE 1/4".
D JOINT TREATMENT AS INDICATED BY DETAIL
S-03-0202 IS NOT REQUIRED FOR INTERIM
JOINTS.
S-03-0201
EXPANSION (ISOLATION) JOINT
TYPE D
#4 (30" LONG)
TIE BAR AT 12"
CENTERS
CONCRETE
PAVEMENT
STONE BASE
3/4" ±1/4"
SUBGRADE
OR SUBBASE
T
ABUTTING SLAB
/STRUCTURE/CURB
OR SIDEWALK
PREMOLDED RESILIENT
JOINT FILLER
CONCRETE PAVEMENT CONTROL
JOINTS
2 ADDENDUM #1 07/2022 VLN
| Sheets and Views |
| C010 |
| CD001-ADD1 |
| CD001 |
Other files
| File | Type | Posted |
|---|---|---|
| IFB#259 Ad. Northside WWTP | — | |
| IFB#259 Addendum #2 | — | |
| Award Information | — | |
| IFB#259 Addendum #1 | — | |
| IFB#259 Addendum#1 Attach B | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .